Forums
L2 Sign Up
SLS/Orion
SpaceX
Commercial
ISS
International
Other
Shop
Home
Help
Tags
Calendar
Login
Register
Forums
»
SLS / Orion / Beyond-LEO HSF - Constellation
»
Cancelled Ares I and Ares Tests
»
ARES I Upper Stage Subsystems Design and Development
Print
Pages: [
1
]
Go Down
Author
Topic: ARES I Upper Stage Subsystems Design and Development (Read 16746 times)
rdale
Assistant to the Chief Meteorologist
Senior Member
Posts: 10482
Lansing MI
Liked: 1567
Likes Given: 193
ARES I Upper Stage Subsystems Design and Development
«
on:
10/21/2011 03:00 pm »
Neat look at the stages in Ares I's life...
http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/20110016430_2011017524.pdf
From 2005 through early 2011, NASA conducted concept definition,
design, and development of the Ares I launch vehicle. The Ares I was conceived to serve as a crew launch vehicle for beyond-low-Earth-orbit human space exploration missions as part of the Constellation Program Architecture. The vehicle was configured with a single shuttle-derived solid rocket booster first stage and a new liquid oxygen/liquid hydrogen upper stage, propelled by a single, newly developed J-2X engine. The Orion Crew Exploration Vehicle was to be mated to the forward end of the Ares I upper stage through an interface with fairings and a payload adapter. The vehicle design passed a Preliminary Design Review in August 2008, and was nearing the Critical Design Review when efforts were concluded as a result of the Constellation Program s cancellation. At NASA Glenn Research Center, four subsystems were developed for the Ares I upper stage. These were thrust vector control (TVC) for the J-2X, electrical power system (EPS), purge and hazardous gas (P&HG), and development flight instrumentation (DFI). The teams working each of these subsystems achieved 80 percent or greater design completion and extensive development testing. These efforts were extremely successful representing state-of-the-art technology and hardware advances necessary to achieve Ares I reliability, safety, availability, and performance requirements. This paper documents the designs, development test activity, and results.
Logged
BrightLight
Full Member
Posts: 1381
Northern New Mexico
Liked: 312
Likes Given: 1019
Re: ARES I Upper Stage Subsystems Design and Development
«
Reply #1 on:
10/23/2011 09:11 pm »
Has Boeing inherited all of the ICD's, CAD (CAM?) drawings, test results etc. from NASA for the upper stage to be integrated into SLS?
Logged
Robotbeat
Senior Member
Posts: 40455
Minnesota
Liked: 26480
Likes Given: 12507
Re: ARES I Upper Stage Subsystems Design and Development
«
Reply #2 on:
10/20/2013 10:16 pm »
As penance for being a pain in the ass during the govt shutdown, I'm going to post pictures I took during a tour of the Ares I upper stage test bed at Glenn this summer during my stint as an intern. (I had permission.) After I post the pictures, I'll post a little summary of an interesting technical discussion I had with the guy who ran the testing.
Logged
Chris Whoever loves correction loves knowledge, but he who hates reproof is stupid.
To the maximum extent practicable, the Federal Government shall plan missions to accommodate the space transportation services capabilities of United States commercial providers.
US law
http://goo.gl/YZYNt0
Robotbeat
Senior Member
Posts: 40455
Minnesota
Liked: 26480
Likes Given: 12507
Re: ARES I Upper Stage Subsystems Design and Development
«
Reply #3 on:
10/20/2013 10:19 pm »
The cone shape is the bottom of the simulated tank. These are some vertical panoramas.
Not all of these pictures are really great, but I figured I'd post them here in case anyone was curious.
The black part at the bottom is the "engine." It's attached firmly to the foundation. It can't be removed. If they want to use this room for something else, they'll have to leave that part in place, perhaps pour concrete over the hole.
«
Last Edit: 10/20/2013 10:21 pm by Robotbeat
»
Logged
Chris Whoever loves correction loves knowledge, but he who hates reproof is stupid.
To the maximum extent practicable, the Federal Government shall plan missions to accommodate the space transportation services capabilities of United States commercial providers.
US law
http://goo.gl/YZYNt0
Robotbeat
Senior Member
Posts: 40455
Minnesota
Liked: 26480
Likes Given: 12507
Re: ARES I Upper Stage Subsystems Design and Development
«
Reply #4 on:
10/20/2013 10:22 pm »
This shows a poster which has a diagram showing what is what on the Ares I upper stage TVC test bed.
Logged
Chris Whoever loves correction loves knowledge, but he who hates reproof is stupid.
To the maximum extent practicable, the Federal Government shall plan missions to accommodate the space transportation services capabilities of United States commercial providers.
US law
http://goo.gl/YZYNt0
Robotbeat
Senior Member
Posts: 40455
Minnesota
Liked: 26480
Likes Given: 12507
Re: ARES I Upper Stage Subsystems Design and Development
«
Reply #5 on:
10/20/2013 10:29 pm »
Logged
Chris Whoever loves correction loves knowledge, but he who hates reproof is stupid.
To the maximum extent practicable, the Federal Government shall plan missions to accommodate the space transportation services capabilities of United States commercial providers.
US law
http://goo.gl/YZYNt0
Robotbeat
Senior Member
Posts: 40455
Minnesota
Liked: 26480
Likes Given: 12507
Re: ARES I Upper Stage Subsystems Design and Development
«
Reply #6 on:
10/20/2013 10:30 pm »
Second to last batch.
«
Last Edit: 10/20/2013 10:36 pm by Robotbeat
»
Logged
Chris Whoever loves correction loves knowledge, but he who hates reproof is stupid.
To the maximum extent practicable, the Federal Government shall plan missions to accommodate the space transportation services capabilities of United States commercial providers.
US law
http://goo.gl/YZYNt0
Robotbeat
Senior Member
Posts: 40455
Minnesota
Liked: 26480
Likes Given: 12507
Re: ARES I Upper Stage Subsystems Design and Development
«
Reply #7 on:
10/20/2013 10:37 pm »
Last batch.
Logged
Chris Whoever loves correction loves knowledge, but he who hates reproof is stupid.
To the maximum extent practicable, the Federal Government shall plan missions to accommodate the space transportation services capabilities of United States commercial providers.
US law
http://goo.gl/YZYNt0
Robotbeat
Senior Member
Posts: 40455
Minnesota
Liked: 26480
Likes Given: 12507
Re: ARES I Upper Stage Subsystems Design and Development
«
Reply #8 on:
10/20/2013 11:31 pm »
Here's some context:
http://www.nasa.gov/centers/glenn/multimedia/imagegallery/if_60_thrust_vect.html
Logged
Chris Whoever loves correction loves knowledge, but he who hates reproof is stupid.
To the maximum extent practicable, the Federal Government shall plan missions to accommodate the space transportation services capabilities of United States commercial providers.
US law
http://goo.gl/YZYNt0
Print
Pages: [
1
]
Go Up
Tags:
Forums
»
SLS / Orion / Beyond-LEO HSF - Constellation
»
Cancelled Ares I and Ares Tests
»
ARES I Upper Stage Subsystems Design and Development
Advertisement
Tweets by NASASpaceflight
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
1