Forums
L2 Sign Up
SLS/Orion
SpaceX
Commercial
ISS
International
Other
Shop
Home
Help
Tags
Calendar
Login
Register
Forums
»
SLS / Orion / Beyond-LEO HSF - Constellation
»
Cancelled Ares I and Ares Tests
»
Development of Weld Inspection of the Ares I Crew Launch Vehicle Upper Stage
Print
Pages: [
1
]
Go Down
Author
Topic: Development of Weld Inspection of the Ares I Crew Launch Vehicle Upper Stage (Read 6583 times)
rdale
Assistant to the Chief Meteorologist
Senior Member
Posts: 10482
Lansing MI
Liked: 1567
Likes Given: 193
Development of Weld Inspection of the Ares I Crew Launch Vehicle Upper Stage
«
on:
05/19/2010 06:07 pm »
NASA is designing a new crewed launch vehicle called Ares I to replace the Space Shuttle after its scheduled retirement in 2010. This new launch vehicle will build on the Shuttle technology in many ways including using a first stage based upon the Space Shuttle Solid Rocket Booster, advanced aluminum alloys for the second stage tanks, and friction stir welding to assemble the second stage. Friction stir welding uses a spinning pin that is inserted in the joint between two panels that are to be welded. The pin mechanically mixes the metal together below the melting temperature to form the weld. Friction stir welding allows high strength joints in metals that would otherwise lose much of their strength as they are melted during the fusion welding process. One significant change from the Space Shuttle that impacts NDE is the implementation of self-reacting friction stir welding for non-linear welds on the primary metallic structure. The self-reacting technique differs from the conventional technique because the load of the pin tool pressing down on the metal being joined is reacted by a nut on the end of the tool rather than an anvil behind the part. No spacecraft has ever flown with a self-reacting friction stir weld, so this is a major advancement in the manufacturing process, bringing with it a whole new set of challenges for NDE to overcome. The metal microstructure and possible defects are different from other weld processes. Friction plug welds will be used to close out the hole remaining in the radial welds when friction stir welded. This plug welding also has unique challenges in inspection. The current state of development of these inspections will be presented, along with other information pertinent to NDE of the Ares I.
http://ntrs.nasa.gov/archive/nasa/casi.ntrs.nasa.gov/20100017377_2010017702.pdf
Logged
sdsds
Senior Member
Posts: 8194
“With peace and hope for all mankind.”
Seattle
Liked: 2824
Likes Given: 2554
Re: Development of Weld Inspection of the Ares I Crew Launch Vehicle Upper Stage
«
Reply #1 on:
02/15/2011 07:21 pm »
Is there any available source of insight into current activity at the Marshall Weld Development Facility? A dome was welded there back in July, 2009:
http://www.nasa.gov/mission_pages/constellation/ares/dome_weld.html
Has there been any activity there since then?
Logged
— 𝐬𝐝𝐒𝐝𝐬 —
Print
Pages: [
1
]
Go Up
Tags:
Forums
»
SLS / Orion / Beyond-LEO HSF - Constellation
»
Cancelled Ares I and Ares Tests
»
Development of Weld Inspection of the Ares I Crew Launch Vehicle Upper Stage
Advertisement
Tweets by NASASpaceflight
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
0