dsmillman - 20/8/2007 3:12 PMI assume the EVA will prepare PMA-2 to be moved to Node 2.
Analyst - 20/8/2007 3:35 PMQuotedsmillman - 20/8/2007 3:12 PMI assume the EVA will prepare PMA-2 to be moved to Node 2.Question is: How much of this can be done with the shuttle docked at PMA-2? What cable connections can be released etc.?Analyst
DaveS - 20/8/2007 10:11 AMDiscovery will dock to PMA-3 which will be attached to the nadir CBM on Unity.
Analyst - 20/8/2007 1:11 AMMajor tasks are:- Node 2 install- P6 relocation (release all connections and reconnect)- Return of the failed SASA from Z1- Stowing new MBSU on ESP-2Analyst
Analyst - 22/8/2007 11:48 AMThey are on L2.Node 2 will be installed at Node-1 port by SSRMS (PMA-3 will go to Node-1 nadir Aug 30th), EVA-1.P6 will be taken by the SSRMS, handed to the SRMS, staying at the SRMS overnight, MBS with the SSRMS translates to P3 overnight (to most outboard worksite possible), next day SSRMS takes P6 from SRMS and puts it at P5. Back to back EVAs-2 and -3 will be done to release connections to Z1 and attach them to P5 the next day.Analyst
daveglo - 22/8/2007 9:10 PMQuoteAnalyst - 22/8/2007 11:48 AMThey are on L2.Node 2 will be installed at Node-1 port by SSRMS (PMA-3 will go to Node-1 nadir Aug 30th), EVA-1.P6 will be taken by the SSRMS, handed to the SRMS, staying at the SRMS overnight, MBS with the SSRMS translates to P3 overnight (to most outboard worksite possible), next day SSRMS takes P6 from SRMS and puts it at P5. Back to back EVAs-2 and -3 will be done to release connections to Z1 and attach them to P5 the next day.AnalystI appreciate the feedback, but I was unable to locate any 3D movies of ISS sequence 10A inside L2 (or anywhere else for that matter). There are a number of movies of ISS 13A, as an example of what I was hoping to see. Can you provide a link?Thanks!
DaveS - 20/8/2007 10:11 AMQuoteAnalyst - 20/8/2007 3:35 PMQuotedsmillman - 20/8/2007 3:12 PMI assume the EVA will prepare PMA-2 to be moved to Node 2.Question is: How much of this can be done with the shuttle docked at PMA-2? What cable connections can be released etc.?AnalystDiscovery will dock to PMA-3 which will be attached to the nadir CBM on Unity.
Chandonn - 23/8/2007 3:08 PMUh, can you provide a source for that? Granted, a shuttle might be able to dock to PMA-3 where it is now, although it would be tight and awkward.
Analyst - 23/8/2007 9:54 AMI do not expect a stage EVA, all tasks not done are low priority.Analyst