ADC9 - 9/12/2005 12:34 PMOr is it all literally just on a conceptual stage of drawings on documents?
bad_astra - 12/12/2005 9:03 AMApart from ATK going ahead with work on the solids..
ADC9 - 12/12/2005 8:08 PMThe five segs for the SDLV?
ADC9 - 9/12/2005 1:34 PMI'm hoping to hear something, anything that is being planned or presented as the first step of giving contracts out and designs to be made of anything to do with the SDLV.Or is it all literally just on a conceptual stage of drawings on documents?
Space101 - 12/1/2006 8:33 AMAnd CEV to the Moon only right now. The opposite of Kraisee's accelerated plan seems to be happening with the SDLVs.