Author Topic: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)  (Read 34649 times)

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #20 on: 02/09/2023 04:38 am »
Techhical stream is back, but with without the clock, which was previously stuck at T-1 hour 4 minutes and 49 seconds.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #21 on: 02/09/2023 04:39 am »
Quite a few people at the base of the vehicle.
« Last Edit: 02/09/2023 04:39 am by Steven Pietrobon »
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #22 on: 02/09/2023 04:40 am »
Clock is back!

T-36 minutes. Gantry is retracting.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #23 on: 02/09/2023 04:42 am »
Halfway down.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #24 on: 02/09/2023 04:44 am »
Gantry is fully retracted.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #25 on: 02/09/2023 04:46 am »
T-30 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline sdsds

  • Senior Member
  • *****
  • Posts: 8746
  • “With peace and hope for all mankind.”
  • Seattle
  • Liked: 3107
  • Likes Given: 2850
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #26 on: 02/09/2023 04:51 am »
Technical stream is working but quiet.

— 𝐬𝐝𝐒𝐝𝐬 —

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #27 on: 02/09/2023 04:51 am »
T-25 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #28 on: 02/09/2023 04:56 am »
T-20 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline russianhalo117

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 9386
  • Liked: 5384
  • Likes Given: 776
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #29 on: 02/09/2023 04:58 am »
Pad closeout procedures checklist radio confirmations and read back ahead of retreating to the safe zones.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #30 on: 02/09/2023 05:01 am »
T-15 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #31 on: 02/09/2023 05:06 am »
T-10 minutes. Pad is clear.
« Last Edit: 02/09/2023 05:06 am by Steven Pietrobon »
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #32 on: 02/09/2023 05:11 am »
T-5 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #33 on: 02/09/2023 05:14 am »
T-2 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #34 on: 02/09/2023 05:15 am »
T-1 minute.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #35 on: 02/09/2023 05:16 am »
Liftoff!
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #36 on: 02/09/2023 05:17 am »
T+1 minute.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #37 on: 02/09/2023 05:18 am »
T+2 minutes. First stage separation.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #38 on: 02/09/2023 05:19 am »
T+3 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40468
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34558
  • Likes Given: 12746
Re: Soyuz-2.1a - Progress MS-22 - 9 February 2023 (06:15 UTC)
« Reply #39 on: 02/09/2023 05:20 am »
Fairing separation.

T+4 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Tags:
 

Advertisement NovaTech
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1