Coverage of U.S. Spacewalk 83 to Install the ISS Roll Out Solar Array on the Port 4 Truss to Augment Electrical Capability for the 4A Power Channel (Rubio and Cassada; spacewalk is scheduled to begin at approximately 8:30 a.m. EST and will last around 7 hours) – Johnson Space Center (All Channels).
Q: Have EVA crew members been identified yet for U.S. EVA-82 and 83?A: Cassada and Rubio for the next twoQ: I understand from NASA's TV schedule that the iROSA EVAs have now moved to 3 Dec and NET 19 Dec...A: We had to wait for the end of a beta angle cutoutQ: Many thanks. Can I also just check: is Cassada still EV1 and Rubio EV2, or will they swap?A: Cass is EV1 and Rubio is EV2 for the next one and the swap designations for the one after that
US_EVA_3A_4A_IROSA_Install_EVA2 Reconfig Dialog2.1 Pre EVA2 Configuration2.3 EGRESS2.4 ---->EV FF Egress Airlock with CIL Bag M2.5 ---->EV SSRMS Egress Airlock2.6 WORKSITE PREP2.7 ---->EV FF Translate to GREEN Hook P1 HR 36522.8 ---->EV FF Translate to the Stbd CETA cart, bundle CIL bag to cable bag, and stow on BRT2.9 ---->EV FF Stow Cable Bag on HR 5107, then retrieve CL Bag and stow on BRT2.10 ---->EV FF Translate to Mast Canister and stow CL Baa on lower left side of Mod Kit2.11 ---->EV FF Install Square Scoop onto mounting bracket2.12 ---->EV FF Retrieve Right Side Cables (Red Barber pole tape) and route towards SAW Connector Panel2.13 ---->EV FF Retrieve Left Side Cables and route towards SAW Connector Panel2.14 ---->EV SSRMS Translate to GREEN Hook P1 HR 36512.15 ---->EV SSRMS Translate to F SE Tower and retrieve Socket Caddy from CIL Bag T2.16 RELEASE ANTI-ROTATION DEVICES2.17 ---->EV SSRMS Translate to C12 release Stop Block Bolt (10 trns), release ARD, drive stop block bolt2.18 ---->EV SSRMS Translate to C11 release Stop Block Bolt (10 trns), release ARD, drive stop block bolt2.19 ---->EV SSRMS Translate to CL Bag and Stow Stow Adj Equip Tether with ARDs2.20 RELEASE ZENITH UPPER IROSA SUPPORT BEAM2.21 ---->EV SSRMS Translate to FSE Stanchion C and release beam Restraint bolts C4, C3 (8-11 turns)2.22 ---->EV FF Translate to FSE Stanchion B2.23 ---->EV FF Release Beam Restraint Bolts C5, C6 (8-11 turns)2.24 ---->EV SSRMS Translate to Stanchion A and Release Beam Restraint Bolts C7, C8 (8-11 turns)2.25 ---->EV FF Rotate beam towards stanchion A (Nadir Outboard)2.26 ---->Both crew tether zenith beam to F SE2.27 RELEASE NADIR UPPER IROSA SUPPORT BEAM2.28 ---->EV SSRMS Translate to Stanchion D and Release Beam Restraint bolt C10, C9 (8-11 turns)2.29 ---->EV FF Translate to Stanchion C2.30 ---->EV SSRMS Rotate Beam towards Stanchion C (C7 to EV FF)2.31 ---->EV FF Handstart C7 (2-3 turns), then drive (25-27 turns)2.32 ---->EV SSRMS Handstart C9, then drive (25-27 turns)2.33 ---->EV SSRMS Translate to P3 and verify SSRMS APFR settings [9, FF, D, 9]2.34 ---->EV SSRMS ingress APFR2.35 ---->EV FF Break torque on C12 (112 turn) with PGT2.36 ---->EV FF Release bolts C11 (27 turns), get Scoop from CL Bag, then release C12 (51-54 turns)2.37 ---->EV FF Install Scoop on root beam micro square near C12, 45 deg towards crewmember2.38 IROSA RELEASE FROM FSE2.39 ---->EV FF Translate to F SE Grapple Tower and retrieve Scoop + LDTDT from CL Bag T2.40 ---->EV SSRMS Give SSRMS Go to published IROSA Nadir Position2.41 ---->EV FF On EV SSRMS GO release C11 (24-26 turns)2.42 ---->EV FF Install Square Scoop on root beam microsquare near C11, handle zenith2.43 ---->EV SSRMS Slide IROSA Zenith to release from FSE2.44 ---->EV FF Give SSRMS Go to maneuver to Lower IROSA Back Off position, then to IROSA Install position2.45 IROSA INSTALL2.46 ---->EV FF Socket Swap at CL Bag and relocate EV SSRMS Red hook to HR 51242.47 ---->EV FF Translate to left side of mounting bracket2.48 ---->EV SSRMS Remove Scoop from Root Beam2.49 ---->EV SSRMS, EV FF Install IROSA onto mounting bracket2.50 ---->EV SSRMS Give SSRMS GO to R6 Release Position2.51 ---->EV SSRMS retrieves scoop and passes both scoops + LDTDT to EV FF, stow on CL Bag 22.52 ---->EV SSRMS Release R6 (18-20 turns) then egress APFR and reposition to right side of mounting bracket2.53 ---->EV FF Pivot IROSA to unfolded, EV FF engage right side alignment tab and capture2.54 ---->EV SSRMS Drive R7, R8 (13 turns) with PGT2.55 ---->EV FF Retrieve AM S knob then transfer to EV SSRMS2.56 ---->EV SSRMS Drive R7, R8 with AM S knob2.57 ---->EV SSRMS Retrieve Cap keeper from CL Bag, transfer to EV FF, receive and stow AM S knob in CL Bag2.58 ---->EV SSRMS Remove caps J1-J4 then transfer cap keeper back to EV FF stow in CL Bag2.59 ---->EV SSRMS Tether Swap RED hook on HR 51242.60 ---->EV FF Drive Left bolts, then Right bolts M31-38 with PGT2.61 ---->EV SSRMS Translate to Mounting Bracket2.62 ---->EV SSRMS Mate Right cables2.63 ---->EV FF Mate Left cables2.64 IROSA DEPLOY2.65 ---->EV FF Position to observe tower magnets snap together during initial deployment near HR 52012.66 ---->EV SSRMS Remove Square Scoop from mounting bracket and stow in CL Bag2.67 ---->EV SSRMS Release R9, R10 (17-20 turns) with PGT2.68 ---->EV SSRMS, EV FF Monitor array deployment2.69 RELEASE BTS BOLTS2.70 ---->EV SSRMS Stow CL Bag in Cable Bag2.71 ---->EV SSRMS After full deployment, release Blanket Bolts R11, R12 (5-6 turns)2.72 ---->EV SSRMS Stow Cable Bag on BRT2.73 ---->EV FF Translate to Port CETA Cart WIF 22.74 ---->EV SSRMS Translate to Port CETA Cart, Stow Cable Bag on Port CETA Cart2.75 CLEANUP2.76 ---->EV SSRMS Give SSRMS Go to APFR Removal Position2.77 ---->EV SSRMS Remove APFR from SSRMS, Install APFR in Port CETA Cart WIF 3 [6, PP, F, 6]2.78 ---->EV SSRMS Inventory Cable Bag and stow on BRT2.79 ---->EV FF translate to Stanchion A and and hand start 02.80 ---->EV FF translate to Stanchion B, drive C52.81 ---->EV FF translate to Stanchion A and finish driving C32.82 ---->EV FF Translate to Tower HR, Stow CL Bag on BRT2.83 ---->EV SSRMS Translate to AL, retrieve GREEN Hook from P1 HR 36512.84 ---->EV FF Translate to AL, retrieve GREEN Hook from P1 HR 36522.85 ---->EV SSRMS Ingress AL2.86 ---->EV FF Ingress AL2.87 GET AHEAD, P6 APFR Retrieve2.88 ---->EV FF Retrieve 55 ft ST from Cable Bag2.89 ---->EV SSRMS Stow CL Bag in Cable Bag2.90 ---->EV FF Translate to P6 WIF 17, Retrieve APFR from WIF 17, stow on BRT2.91 ---->EV SSRMS After full deployment, release Blanket Bolts R11, R12 (5-6 turns)2.92 ---->EV SSRMS Stow Cable Bag on BRT2.93 ---->EV FF translate to P4 4A lEA and perform tether swap2.94 ---->EV FF Translate to Port CETA Cart WIF 2, Install APFR [9, PP, f, 2]2.95 ---->EV SSRMS Translate to Port CETA Cart, Stow Cable Bag on Port CETA Cart