Author Topic: ISS US EVA 83 - 4A Channel IROSA Install - 22 Dec 2022 [Rubio, Cassada]  (Read 30621 times)

Offline cohberg

  • Full Member
  • **
  • Posts: 284
  • Liked: 956
  • Likes Given: 57


ISS US EVA 83 - 4A IROSA Install
IROSA install #4

Scheduled for: December 22nd, 2022 8:30AM EST
Duration: 7 hours
Primary Worksite: P4 Solar Array Truss
EV1 (Red Stripe): Rubio
EV2: Cassada



Updates

Quote from: nasa.gov/multimedia/nasatv/schedule.html#.V9B_0DXTt1o
Coverage of U.S. Spacewalk 83 to Install the ISS Roll Out Solar Array on the Port 4 Truss to Augment Electrical Capability for the 4A Power Channel (Rubio and Cassada; spacewalk is scheduled to begin at approximately 8:30 a.m. EST and will last around 7 hours) – Johnson Space Center (All Channels).

Quote from: Rob Navias - Email (11/24/2022) to "Ben E"
Q: Have EVA crew members been identified yet for U.S. EVA-82 and 83?
A: Cassada and Rubio for the next two

Q: I understand from NASA's TV schedule that the iROSA EVAs have now moved to 3 Dec and NET 19 Dec...
A: We had to wait for the end of a beta angle cutout

Q: Many thanks. Can I also just check: is Cassada still EV1 and Rubio EV2, or will they swap?
A: Cass is EV1 and Rubio is EV2 for the next one and the swap designations for the one after that



Relevant Threads
ISS advanced solar array upgrades (iROSA)



DOUG EVA Movie
https://www.youtube.com/watch?v=bdJOq_j2FOM&t=10s



Early DOUG EVA Steps
Quote from: Produced on 12/13 by CNG - Based on: US_EVA_3A_4A_IROSA_Install_v22
US_EVA_3A_4A_IROSA_Install_EVA2 Reconfig Dialog
2.1 Pre EVA2 Configuration
2.3 EGRESS

2.4 ---->EV FF Egress Airlock with CIL Bag M
2.5 ---->EV SSRMS Egress Airlock
2.6 WORKSITE PREP
2.7 ---->EV FF Translate to GREEN Hook P1 HR 3652
2.8 ---->EV FF Translate to the Stbd CETA cart, bundle CIL bag to cable bag, and stow on BRT
2.9 ---->EV FF Stow Cable Bag on HR 5107, then retrieve CL Bag and stow on BRT
2.10 ---->EV FF Translate to Mast Canister and stow CL Baa on lower left side of Mod Kit
2.11 ---->EV FF Install Square Scoop onto mounting bracket
2.12 ---->EV FF Retrieve Right Side Cables (Red Barber pole tape) and route towards SAW Connector Panel
2.13 ---->EV FF Retrieve Left Side Cables and route towards SAW Connector Panel
2.14 ---->EV SSRMS Translate to GREEN Hook P1 HR 3651
2.15 ---->EV SSRMS Translate to F SE Tower and retrieve Socket Caddy from CIL Bag T
2.16 RELEASE ANTI-ROTATION DEVICES
2.17 ---->EV SSRMS Translate to C12 release Stop Block Bolt (10 trns), release ARD, drive stop block bolt
2.18 ---->EV SSRMS Translate to C11 release Stop Block Bolt (10 trns), release ARD, drive stop block bolt
2.19 ---->EV SSRMS Translate to CL Bag and Stow Stow Adj Equip Tether with ARDs
2.20 RELEASE ZENITH UPPER IROSA SUPPORT BEAM
2.21 ---->EV SSRMS Translate to FSE Stanchion C and release beam Restraint bolts C4, C3 (8-11 turns)
2.22 ---->EV FF Translate to FSE Stanchion B
2.23 ---->EV FF Release Beam Restraint Bolts C5, C6 (8-11 turns)
2.24 ---->EV SSRMS Translate to Stanchion A and Release Beam Restraint Bolts C7, C8 (8-11 turns)
2.25 ---->EV FF Rotate beam towards stanchion A (Nadir Outboard)
2.26 ---->Both crew tether zenith beam to F SE
2.27 RELEASE NADIR UPPER IROSA SUPPORT BEAM
2.28 ---->EV SSRMS Translate to Stanchion D and Release Beam Restraint bolt C10, C9 (8-11 turns)
2.29 ---->EV FF Translate to Stanchion C
2.30 ---->EV SSRMS Rotate Beam towards Stanchion C (C7 to EV FF)
2.31 ---->EV FF Handstart C7 (2-3 turns), then drive (25-27 turns)
2.32 ---->EV SSRMS Handstart C9, then drive (25-27 turns)
2.33 ---->EV SSRMS Translate to P3 and verify SSRMS APFR settings [9, FF, D, 9]
2.34 ---->EV SSRMS ingress APFR
2.35 ---->EV FF Break torque on C12 (112 turn) with PGT
2.36 ---->EV FF Release bolts C11 (27 turns), get Scoop from CL Bag, then release C12 (51-54 turns)
2.37 ---->EV FF Install Scoop on root beam micro square near C12, 45 deg towards crewmember
2.38 IROSA RELEASE FROM FSE
2.39 ---->EV FF Translate to F SE Grapple Tower and retrieve Scoop + LDTDT from CL Bag T
2.40 ---->EV SSRMS Give SSRMS Go to published IROSA Nadir Position
2.41 ---->EV FF On EV SSRMS GO release C11 (24-26 turns)
2.42 ---->EV FF Install Square Scoop on root beam microsquare near C11, handle zenith
2.43 ---->EV SSRMS Slide IROSA Zenith to release from FSE
2.44 ---->EV FF Give SSRMS Go to maneuver to Lower IROSA Back Off position, then to IROSA Install position
2.45 IROSA INSTALL
2.46 ---->EV FF Socket Swap at CL Bag and relocate EV SSRMS Red hook to HR 5124
2.47 ---->EV FF Translate to left side of mounting bracket
2.48 ---->EV SSRMS Remove Scoop from Root Beam
2.49 ---->EV SSRMS, EV FF Install IROSA onto mounting bracket
2.50 ---->EV SSRMS Give SSRMS GO to R6 Release Position
2.51 ---->EV SSRMS retrieves scoop and passes both scoops + LDTDT to EV FF, stow on CL Bag 2
2.52 ---->EV SSRMS Release R6 (18-20 turns) then egress APFR and reposition to right side of mounting bracket
2.53 ---->EV FF Pivot IROSA to unfolded, EV FF engage right side alignment tab and capture
2.54 ---->EV SSRMS Drive R7, R8 (13 turns) with PGT
2.55 ---->EV FF Retrieve AM S knob then transfer to EV SSRMS
2.56 ---->EV SSRMS Drive R7, R8 with AM S knob
2.57 ---->EV SSRMS Retrieve Cap keeper from CL Bag, transfer to EV FF, receive and stow AM S knob in CL Bag
2.58 ---->EV SSRMS Remove caps J1-J4 then transfer cap keeper back to EV FF stow in CL Bag
2.59 ---->EV SSRMS Tether Swap RED hook on HR 5124
2.60 ---->EV FF Drive Left bolts, then Right bolts M31-38 with PGT
2.61 ---->EV SSRMS Translate to Mounting Bracket
2.62 ---->EV SSRMS Mate Right cables
2.63 ---->EV FF Mate Left cables
2.64 IROSA DEPLOY
2.65 ---->EV FF Position to observe tower magnets snap together during initial deployment near HR 5201
2.66 ---->EV SSRMS Remove Square Scoop from mounting bracket and stow in CL Bag
2.67 ---->EV SSRMS Release R9, R10 (17-20 turns) with PGT
2.68 ---->EV SSRMS, EV FF Monitor array deployment
2.69 RELEASE BTS BOLTS
2.70 ---->EV SSRMS Stow CL Bag in Cable Bag
2.71 ---->EV SSRMS After full deployment, release Blanket Bolts R11, R12 (5-6 turns)
2.72 ---->EV SSRMS Stow Cable Bag on BRT
2.73 ---->EV FF Translate to Port CETA Cart WIF 2
2.74 ---->EV SSRMS Translate to Port CETA Cart, Stow Cable Bag on Port CETA Cart
2.75 CLEANUP
2.76 ---->EV SSRMS Give SSRMS Go to APFR Removal Position
2.77 ---->EV SSRMS Remove APFR from SSRMS, Install APFR in Port CETA Cart WIF 3 [6, PP, F, 6]
2.78 ---->EV SSRMS Inventory Cable Bag and stow on BRT
2.79 ---->EV FF translate to Stanchion A and and hand start 0
2.80 ---->EV FF translate to Stanchion B, drive C5
2.81 ---->EV FF translate to Stanchion A and finish driving C3
2.82 ---->EV FF Translate to Tower HR, Stow CL Bag on BRT
2.83 ---->EV SSRMS Translate to AL, retrieve GREEN Hook from P1 HR 3651
2.84 ---->EV FF Translate to AL, retrieve GREEN Hook from P1 HR 3652
2.85 ---->EV SSRMS Ingress AL
2.86 ---->EV FF Ingress AL
2.87 GET AHEAD, P6 APFR Retrieve
2.88 ---->EV FF Retrieve 55 ft ST from Cable Bag
2.89 ---->EV SSRMS Stow CL Bag in Cable Bag
2.90 ---->EV FF Translate to P6 WIF 17, Retrieve APFR from WIF 17, stow on BRT
2.91 ---->EV SSRMS After full deployment, release Blanket Bolts R11, R12 (5-6 turns)
2.92 ---->EV SSRMS Stow Cable Bag on BRT
2.93 ---->EV FF translate to P4 4A lEA and perform tether swap
2.94 ---->EV FF Translate to Port CETA Cart WIF 2, Install APFR [9, PP, f, 2]
2.95 ---->EV SSRMS Translate to Port CETA Cart, Stow Cable Bag on Port CETA Cart


‎‏‏‎ ‎‎‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎  ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎  ‎‏‏‎ ‎‎‏‏‎ ‎‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎  ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎‎‏‏‎ ‎‏‏‎ ‎  Like‎‏‏‎ ‎‏‏‎ ‎ Quote
« Last Edit: 12/21/2022 05:04 pm by cohberg »

Offline Ben E

  • Full Member
  • ****
  • Posts: 1156
  • Liked: 115
  • Likes Given: 17
Re: ISS US EVA 83 - 4A IROSA Install
« Reply #1 on: 11/25/2022 08:57 am »
For this EVA, Rubio is EV1 and Cassada is EV2.
« Last Edit: 11/25/2022 08:58 am by Ben E »

Offline Galactic Penguin SST

Looks like this EVA is also going to be delayed to freed up the SSRMS for Soyuz MS-22 exterior inspections.

https://twitter.com/sciguyspace/status/1603763970208301056
Astronomy & spaceflight geek penguin. In a relationship w/ Space Shuttle Discovery.

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
MCC-H confirmed during Friday evening DPC that the EVA Monday is postponed while program analyzes the Soyuz leak.  The plan for Sunday is being reworked to reflect the postponement.
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline eeergo

EVA is now planned for Wednesdat, Dec 21st.
-DaviD-

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
December 19, 2022
MEDIA ADVISORY M22-185
NASA to Air Live Coverage of US Spacewalk for Solar Array Installation

NASA astronauts aboard the International Space Station will conduct a spacewalk on Wednesday, Dec. 21, to install a rollout solar array to increase electrical power in support of operations and scientific research. The spacewalk is scheduled to begin at 7:45 a.m. EST and last about seven hours.

The agency will provide live coverage of the spacewalk beginning at 6:30 a.m. on NASA Television, the app, and the agency’s website.

Expedition 68 Flight Engineers Frank Rubio and Josh Cassada will exit the station’s Quest airlock to install an International Space Station Roll-Out Solar Array (iROSA) to augment power generation for the 4A power channel on the station’s port truss.

Rubio will serve as extravehicular crew member 1 (EV 1) and will wear a suit with red stripes. Cassada will serve as extravehicular crew member 2 (EV 2) and will wear an unmarked suit. The spacewalk will be the third in both Cassada and Rubio’s careers.

If more time is needed to complete the iROSA installation, a second spacewalk may be conducted on Tuesday, Dec. 27.

This will be the fourth iROSA installed on station out of a total six planned for installation. Overall, the iROSAs will increase power generation capability by up to 30%, increasing the station’s total available power from 160 kilowatts to up to 215 kilowatts.

The iROSA arrived at the space station Nov. 27, following a launch aboard the agency’s 26th SpaceX Dragon commercial resupply mission Nov. 26.

Cassada and Rubio are in the midst of a science mission living and working aboard the microgravity laboratory to advance scientific knowledge and demonstrate new technologies for future human and robotic exploration missions, including NASA’s Artemis missions to the Moon.

Get breaking news, images and features from the space station on Instagram, Facebook, and Twitter.

Learn more about the International Space Station and its crew at:

https://www.nasa.gov/station
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
Go for O2 mask doffing.  Comm checks in work.
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
Go for airlock repress
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
ISLE CO2 purge protocol underway.  SG-1 is being privatized, not normal, so there is something NASA doesn't want broadcast...
« Last Edit: 12/21/2022 09:17 am by Targeteer »
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
Comms back and crew has been instructed to perform some POST EVA procedures...
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
crew has been instructed to photograph the water absorbing HAPs which can only be done if the crew isn't wearing their helmets... Other steps sound like the crew is no longer in the space suits...
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
the CO2 cannisters have been removed
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
crew requested pre-breathe configuration remain in place overnight.  Sounding more like the EVA is off...
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 54665
  • UK
    • Plan 28
  • Liked: 90988
  • Likes Given: 42079

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
EVA back out complete.  Crew will be replanning the rest of the day.  EVA is definitely cancelled/delayed.
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
Will NASA provide an update when coverage was supposed to start at 0630?
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
coverage announcement is up so we'll see what NASA says in 5 minutes
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
I'm guessing a "physiological issue"...
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
Frank is back on comms and joked about it being nice to talk to CAPCOM
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 6908
  • near hangar 18
  • Liked: 4369
  • Likes Given: 1435
Late Orbital debris conjunction caused the scrub, PDAM using Progress planning in progress.  Debris part of a Russian Fregat upper stage that is apparently rarely tracked--in a high inclination/Molniya orbit?
« Last Edit: 12/21/2022 10:43 am by Targeteer »
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Tags:
 

Advertisement NovaTech
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1