Jonny Kim@JonnyKimUSAT+183 (2.26.24): No "i" in team. So much of what we do is support each other. Which is why we train so much in helping each other suit up before an EVA. When we say we put our lives in each other's hands, we mean it. That means being meticulous with each connection, following checklists, and backing each other up.
Astronauts Prep for May Spacewalk Amid Human Research and Crew DepartureApril 15, 2025Two NASA astronauts are preparing their spacesuits for a spacewalk planned for the beginning of May to ready the International Space Station for a new rollout solar array. In the meantime, the rest of the Expedition 72 crew on Tuesday kept up its ongoing vision, respiratory, and circulatory system research ahead of this weekend’s crew departure.Flight Engineers Anne McClain and Nichole Ayers have been tapped by mission managers to exit the orbital outpost’s Quest airlock on May 1 for a spacewalk and work six-and-half hours in the vacuum of space. The NASA duo will install a modification kit on the port side of the station’s truss structure enabling the future installation of the orbiting lab’s seventh rollout solar array. They will also relocate an antenna that communicates with approaching and departing commercial crew and cargo spacecraft. McClain will be going on her third spacewalk and Ayers will be conducting her first spacewalk.McClain and Ayers spent Tuesday inside Quest adjusting the spacesuits ensuring the helmets, boots, and arm and leg assemblies they will wear fit together. Next, the pair powered up and checked the functionality of suit components such as glove heaters, data recorders, cameras, and helmet lights. Finally, McClain and Ayers began collecting and configuring the tools they will use during the upcoming maintenance spacewalk.[...]
The NASA duo will install a modification kit on the port side of the station’s truss structure enabling the future installation of the orbiting lab’s seventh rollout solar array. They will also relocate an antenna that communicates with approaching and departing commercial crew and cargo spacecraft.
3 EGRESS4 ---->EV1 egress Airlock and recieve Strut Bag from EV25 ---->EV2 egress and receive Strut Bag from EV1, Stow on BRT6 ---->EV1 Retrieve Cable Bag from AIL, stow on BRT7 ---->EV1 and EV2 translate to lEA (EV2 Leads)8 STOW CABLE AND STRUT BAG ON lEA9 ---->EV2 Translate to outboard, non-radiator side of lEA, stow strut bag on lEA corner10 ---->EV1 Stow Cable Bag on lEA Inboard non-radiator corner11 APFR/WIFEX BUNDLE SETUP12 ---->EV1 Translate to Stbd CETA Cart WIF0113 ----> Stow WIFEX/APRF on BRT, Translate to P4 WIF 2514 ---->EV1 Install WIFEX/APFR in WIF 25 (6, G, 5) APFR to (12, TT, F, 12)15 RIGHT UPPER STRUT TO MOUNTING BRACKET16 ---->EV2 Open Strut Bag, Retrieve Mounting Bracket and Right Upper Strut17 ---->EV2 align Right Upper Strut L7 to Mounting Bracket Right Side, drive M13, M1418 LEFT UPPER STRUT TO CENTER PAD19 ---->EV2 retrieve Left Upper Strut, align Upper Left Strut L2 to Center Pad L2, drive M1720 ---->EV2 drive M15, then M16 to torque, then M15 to torque21 TORQUE RIGHT UPPER STRUT TO MOUNTING BRACKET22 ---->EV2 PGT[B3,CW2,30.5] Drive M13, M14 to torque and tend PGT to Strut Bag23 ---->EV2 Translate to Cable Bag, get IROSA Cables and Stow on Mounting bracket24 UPPER TRIANGLE TO MAST CANISTER25 ---->EV1 Ingress APFR, Install Center Pad on Mast Canister, Drive M5-M826 INSTALL RIGHT LOWER STRUT27 ---->EV1 Egress APFR, reposition to lEA Keel Pin/A-Frame28 ---->EV2 Translate to WIFEX APFR, WIFEX [6, G, 1] APFR [12, PP, C, 12]29 ---->EV1 Ingress APFR, Verify Access, Release Mounting Bracket RET30 ---->EV1 Recieve Right Mid Strut from EV231 ---->EV1 Recieve Right Lower Strut from EV2, clevis toward EV132 ----> EV2 Translate to Left SABB spherical Bearing, Drive M1933 ---->EV1 Align Lower Strut L6 with Mounting Bracket L6, Drive M2034 ---->EV2 Torque M1935 ---->EV1 Torque M2036 ---->EV1 Install Lower Strut Grounding PIP Pin to Mounting Bracket Grounding Block37 INSTALL RIGHT MID STRUT38 ---->EV2 Translate to Side Pad location on Right side of Mast Canister39 ---->EV1 Retrieve Mid Strut from BRT, extend Side Pad, tend towards Mast Canister40 ---->EV2 Install Side Pad on Mast Canister, Drive M9-M1241 ---->EV1 align Mid Strut L5 to Upper Strut L5, Start Bolt M2442 ---->EV2 drive M9-12 to torque43 ---->EV1 drive M24, stow PGT44 ---->EV1 install Mid Strut PIP Pin to Grounding Block45 INSTALL LEFT LOWER STRUT46 ---->EV2 Translate to Strut bag, Retrieve left Mid Strut47 ---->EV1 Recieve Left Mid Strut from EV248 ---->EV1 Recieve Left Lower Strut from EV2, clevis toward EV149 ---->EV2 Translate to APFR adjust [12, PP, H, 12]50 ---->EV2 Translate to Left SABB spherical Bearing, Drive M2151 ---->EV1 Align Lower Strut Clevis with Mounting Bracket L5, Drive 2252 ---->EV2 Drive M21 to Torque53 ---->EV1 Drive M22 to torque, install PIP Pin into Block on Mounting Bracket54 INSTALL LEFT MID STRUT55 ---->EV2 Translate to Left Side Pad installation location56 ---->EV1 Retrieve Left Mid strut from BRT, extend Side Pad, tend towards Mast Canister57 ---->EV2 Install Side Pad on Mast Canister, Drive M1-M458 ---->EV1 align Mid Strut L6 to Upper Strut L6, Start Bolt M2859 ---->EV2 drive M1-4 to torque60 ---->EV1 drive M28 to torque, stow PGT61 ---->EV1 install Mid Strut Grounding PIP Pin to Mounting Bracket Grounding block62 LEFT MID STRUT COLLAR63 ---->EV2 Adjust body position to reach Mid Strut Collar, drive M29 and M30 to Torque64 ---->EV2 Set PGT to MTR and stow65 STRUT BAG CLEANUP66 ---->EV1 Egress APFR and stow PGT and Torque wrench inside strut bag67 ---->EV1 Stow strut bag inside cable bag68 ---->EV2 Translate to Right Mid Strut69 RIGHT MID STRUT COLLAR70 ---->EV2 drive M26, M25 PGT [B7, CW2, 30.5] to torque and stow, set PGT to RCW and final torque71 ---->EV2 Set PGT to MTR and stow72 MID STRUTS MLI73 ---->EV1 EV2 Install Mid Strut MLI74 IROSA CABLE ROUTING75 ---->EV1 Route Left IROSA cables towards Left SAW connector panel76 ---->EV2 Route Right IROSA cables towards Right SAW connector panel77 APFR/WIFEX RELOCATE78 ---->EV1 Translate to APFR, retrieve and stow on BRT79 ---->EV1 Translate to P3 WIF 10, install APFR [12, PP, H, 12]80 ---->EV2 Translate to WIFEX and stow on BRT81 C2V2 BOOM82 ---->EV2 Translate inboard to P3 aft C2V2 Boom83 ---->EV1 Translate outboard to P3 Aft C2V2 Boom84 ---->EV2 Release Wire Ties Securing Cable Bundle to HR 382985 ---->(OPTIONAL) EV2 temp stow WIFEX with AET on HR 3829 or Install in WIF 2586 ---->EV2 RET to and Release C2V2 Stantchtion from WIF, Hold Inboard87 ---->EV1 Install WIFEX in WIF 17 [3,A,1]88 ---->EV2 Install C2V2 in WIFEX89 ---->Re-coil Cables and Secure in Wire Tie on HR 382990 CLEANUP/INGRESS91 ---->EV2 Retrieve Cable Bag from [EA stow on BRT92 ---->EV1 Translate to Airlock93 ---->EV2 Translate to Airlock94 ---->EV2 Open Hatch Thermal Cover95 ---->EV2 Ingress Airlock Stow Cable Bag in Airlock96 ---->EV1 Ingress Airlock, Close Thermal Cover
3 EGRESS2.3 P6 DDCU JUMPER SETUP (EV2)2.4 ---->EV2 Remove P6 DDCU Jumper and Cannon Connector Tool from Cable Bag2.5 ---->EV2 Translate to P6 HR 53082.6 ---->EV2 Tether to Dummy Caps J158 J1572.7 ---->EV2 Install Canon Connector Tool, rot 90 deg and Remove Caps2.8 ---->EV2 Mate New Jumper Connectors to J157 and J158 (rot 90 deg to hard stop)2.9 ---->EV2 Translate to Cable bag2.10 ---->EV2 Stow Dummy Caps and Cannon Connector Tool2.11 P4 MMOD Cover Bolt Release2.12 ---->EV Translate to P4 MMOD Cover Bolt 3, BRT to HR 51252.13 ---->EV Press inward on MMOD Cover, Inspect Reaction, Inspect Bolt 32.14 ---->EV PGT [B2, CCW2, 30.5] Release and report torque Bolt 3 (2 turns)2.15 ----> [IF BOLT 3 FULLY BACKED OUT]2.16 ->EV Translate to Bolt 4, Inspect, reset torque, release and report (2 turns)2.17 ---->[ELSE]2.18 ->EV Translate to Bolt 4. Inspect, reset torque, release and report torque (9 turns)2.19 ---->EV Translate to Bolt 1, Inspect, reset torque, release and report (2 turns)2.20 ---->EV Translate to Bolt 2, Inspect, reset torque, release and report (2 turns)2.21 P4 4A ORU TORQUE RESET2.22 ---->EV Translate to P4 4A lEA2.23 ---->EV Reset Torque on PFCS: H3, H4, Ratchet Release, PGT [A6, CW2, 30.5] Drive2.24 ---->EV Reset Torque on DC SU: H2, Ratchet Release, PGT [A6, CW2, 30.5] Drive2.25 ---->EV Reset Torque on DDCU: H1, H2, Ratchet Release, PGT [A6, CW2, 30.5] Drive2.26 ---->EV Reset Torque on BCDU 4A1: H1, H2, Ratchet Release, PGT [A6, CW2, 30.5] Drive2.27 P4 2A ORU TORQUE RESET2.28 ---->EV Translate to P4 lEA, PGT [A6, CW2, 30.5]2.29 ---->EV Reset Torque on BCDU 2A1: H1, H2, Ratchet Release, PGT Drive2.30 ---->EV Reset Torque on BCDU 2A2: H1, H2, Ratchet Release, PGT Drive2.31 ---->EV Reset Torque on BCDU 2A3: H1, H2, Ratchet Release, PGT Drive2.32 ---->EV Reset Torque on DDCU: H1, H2, Ratchet Release, PGT Drive2.33 ---->EV Reset Torque on DC SU: H1, H2, Ratchet Release, PGT Drive2.34 ---->EV Reset Torque on PFCS: H3, H4, Ratchet Release, PGT Drive2.35 FHRC STRUT TIE-BACK2.36 ---->EV Translate to Port FHRC in Bay 122.37 ---->EV Remove Nadir Launch Support Strut, Release Nadir Strut Bolt PGT [B7, CCW2, 30.5]2.38 ---->EV Rotate Strut Outboard, Use Wire Tie to Secure around BAXS2.39 ---->EV Reposition to Zenith Support Strut2.40 ---->EV Remove Zenith Launch Support Strut, Release Zenith Strut Bolt PGT [B7, CCW2, 30.5]2.41 ---->EV Rotate Strut Outboard, Use Wire Tie to Secure around BAXS-2.42 ---->EV Egress Truss
EV1 (Red Stripe):Anne McClainEMU #3003EV2:Nichole AyersEMU #3015
Thursday, April 242 p.m. | News conference on U.S. spacewalk 93 at the International Space Station. Stream on YouTubeEditor’s Note: We are experiencing technical difficulties. A recording of this event will be shared here once available.