Author Topic: US EVA 93 - May 01, 2025 (~12:00 UTC) [McClain & Ayers]  (Read 17130 times)

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 12704
  • CETI Alpha V
  • Liked: 9078
  • Likes Given: 5740
Re: US EVA 93 - May 01, 2025 (~12:00 UTC) [McClain & Ayers]
« Reply #40 on: 05/01/2025 12:04 pm »
EV-1 & 2 now inside Crew Lock section.
To boldly go where no human has gone before !

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 7488
  • near hangar 18
  • Liked: 4990
  • Likes Given: 1638
Re: US EVA 93 - May 01, 2025 (~12:00 UTC) [McClain & Ayers]
« Reply #41 on: 05/01/2025 12:07 pm »
25 minutes behind on the timeline
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 7488
  • near hangar 18
  • Liked: 4990
  • Likes Given: 1638
Re: US EVA 93 - May 01, 2025 (~12:00 UTC) [McClain & Ayers]
« Reply #42 on: 05/01/2025 12:08 pm »
hatch closed
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Yellowstone10

Hatch closure.

Offline Yellowstone10

Crew is hot-miked. Onishi and Kim are starting to walk them through depressurization procedures.

Offline Yellowstone10

I think the silver thing Kim is sticking to the wall there is a pressure gauge - suppose it makes sense that you'd want to make sure the pressure in the equipment lock doesn't move!

Offline Yellowstone10

Around 8 psi in the crew lock, per the commentator.

Offline Yellowstone10

Crew lock is now at 5 psi - pausing depress for leak checks.
« Last Edit: 05/01/2025 12:27 pm by Yellowstone10 »

Offline Yellowstone10

McClain reports a 2-4 mm slit in the RTV on her glove (right index finger) during the initial glove check.

Ground teams are having her turn on her HECA so they can take a look.
« Last Edit: 05/01/2025 12:31 pm by Yellowstone10 »

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 7488
  • near hangar 18
  • Liked: 4990
  • Likes Given: 1638
Re: US EVA 93 - May 01, 2025 (~12:00 UTC) [McClain & Ayers]
« Reply #49 on: 05/01/2025 12:30 pm »
McClain reports a 2-4 mm slit in the RTV on her glove during the initial glove check.

That had to occur while she was in the crew lock...
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Yellowstone10

HECA views of McClain's glove, although it's hard for me to tell what's reflection vs. what might be a slit through to the white fabric.

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 7488
  • near hangar 18
  • Liked: 4990
  • Likes Given: 1638
Re: US EVA 93 - May 01, 2025 (~12:00 UTC) [McClain & Ayers]
« Reply #51 on: 05/01/2025 12:39 pm »
the prospect of another EVA ending before it begins...
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Yellowstone10

Go to continue - no additional checks needed now, but McClain's been told to keep an eye on it.

Offline Yellowstone10

Down to 3 psi.

Offline Yellowstone10

EV crew is switching comms from Kim and Onishi over to ground IV Marcos Berrios.

Calling down initial tether configurations.
« Last Edit: 05/01/2025 12:50 pm by Yellowstone10 »

Offline Yellowstone10

Pressure is now falling below 50 millibar (Jonathan McDowell's EVA start metric - about 0.7 psi).
« Last Edit: 05/01/2025 12:58 pm by Yellowstone10 »

Offline Yellowstone10

Berrios mentions by way of reminder that there are 4 extended Ku outages of 20-40 minutes during the EVA during which they will not have video or HECA coverage, with the first starting in about 30 mintues. S-band remains go for audio comms during those periods.

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 7488
  • near hangar 18
  • Liked: 4990
  • Likes Given: 1638
Re: US EVA 93 - May 01, 2025 (~12:00 UTC) [McClain & Ayers]
« Reply #57 on: 05/01/2025 01:02 pm »
repeating my earlier report that there will be no TDRS 275/Z Ku coverage.  There will be S band so there will be audio.  25-30 minute gaps cannot be blamed on 275/Z which is a gap filler between W and E coverage--gaps are usually 10-12 minutes.  DoD is hogging one of the two...
« Last Edit: 05/01/2025 01:06 pm by Targeteer »
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Yellowstone10

Pressure less than 0.5 psi - go to proceed with hatch ops. (ISS Mimic is reading 8.9 torr.)

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 7488
  • near hangar 18
  • Liked: 4990
  • Likes Given: 1638
Re: US EVA 93 - May 01, 2025 (~12:00 UTC) [McClain & Ayers]
« Reply #59 on: 05/01/2025 01:05 pm »
Why all the "data reviews"?  These are not normal
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Tags:
 

Advertisement NovaTech
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1