« Reply #2460 on: 08/18/2019 09:51 am »
https://spacenews.com/virgin-orbit-offers-vision-of-responsive-smallsat-constellation-launch/
Quote
What is in the near term for Virgin Orbit is the first orbital launch attempt by its LauncherOne rocket. The company performed a drop test of a LauncherOne test article July 10, the final major test milestone before that first flight later this year.
“There’s a rocket that’s going to launch in two months,” Fuller said.
https://spacenews.com/oneweb-disputes-virgin-orbit-lawsuit-says-launcherone-is-too-expensive/
Quote
Virgin Orbit’s LauncherOne is designed to launch 300 kilograms to a 500-kilometer orbit — enough to potentially carry two OneWeb satellites, depending on the weight of adaptors and supporting equipment.

Offline Salo

  • Senior Member
  • *****
  • Posts: 15492
  • Odessa, Ukraine
  • Liked: 6499
  • Likes Given: 5050
Re: US Launch Schedule
« Reply #2461 on: 08/18/2019 10:33 am »
Launched:
№ – Date - Satellite(s) - Rocket - Launch Site - Time (UTC)

2019
01 - January 11 - Iridium Next Flight 8 (x10) - Falcon 9-068 (B1049.2) - Vandenberg SLC-4E - 15:31:33.492
02 - January 19  - NROL-71: KH-11 17 (Crystal 17, Block 5 #1) [USA-290] - Delta IV-H [D-382] - Vandenberg SLC-6 - 19:10
03 - February 22 - Nusantara Satu (PSN-6 - Pasifik Satelit Nusantara 6), Spaceflight GTO 1: Beresheet (Genesis, SpaceIL Sparrow), S5 (Space Situational Awareness mission) - Falcon 9-069 (B1048.3) - Canaveral SLC-40 - 01:45
04 - March 2 - Dragon v2 (unmanned test) (SpX-DM1)- Falcon 9-070 (B1051.1) - Kennedy LC-39A - 07:49:03
05 - March 16 - WGS-10  [USA-291] - Delta IV-M+(5,4) [D-383] - Canaveral SLC-37 - 00:26:00.122
06 - April 11 - Arabsat 6A - Falcon Heavy-02 (B1052.1, B1055.1, B1053.1) - Kennedy LC-39A - 22:35:00.526
07 - April 17 - Cygnus NG-11 (CRS-11), SASSI2, ThinSat (x66) - Antares 230 - MARS LP-0A - 20:46:11
08 - May 4 - Dragon SpX-17 (CRS-17), OCO-3, STP-H6 - Falcon 9-071 (B1056.1) - Canaveral SLC-40 - 06:48:58
09 - May 24 - Starlink v0.9 (x60) flight 1 - Falcon 9-072 (B1049.3) - Canaveral SLC-40 - 02:30
10 - June 12 - Radarsat C-1, Radarsat С-2, Radarsat С-3 - Falcon 9-073 (B1051.2) - Vandenberg SLC-4E - 14:17:10
11 - June 25 - DSX (SSTE 4, Cygnus, SET 1), FORMOSAT 7A/7B/7C/7D/7E/7F (COSMIC-2A equatorial), GPIM+AFIT SOS, OTB 1, NPSat 1, Oculus-ASR, Prox 1 + LightSail B, E-TBEx A, E-TBEx B, PSat 2, TEPCE 1, TEPCE 2, STP-2: BRICSat 2, FalconSat 7 (FS 7, Peregrine), ELaNa XV: ARMADILLO, CP 9 (LEO), StangSat - Falcon Heavy-03 (B1052.2, B1057.1, B1053.2) - Kennedy LC-39A - 06:30
12 - July 25 - Dragon SpX-18 (CRS-18), IDA-3, RFTSat, NARSSCube2, cubesat - Falcon 9-074 (B1056.2) - Canaveral SLC-40 - 22:01:56.492
13 - August 6 - Amos 17 - Falcon 9-075 (B1047.3) - Canaveral SLC-40 - 23:23:00.538
14 - August 8 - AEHF-5 [USA-292], TDO - Atlas V 551 (AV-083) - Canaveral SLC-41 - 10:13:00.246
15 - August 22 - GPS III SV02 "Magellan" [USA-293] - Delta-IV-M+(4,2) [D-384] - Canaveral SLC-37B - 13:06:00.167

Scheduled:
Date - Satellite(s) - Rocket - Launch Site - Time (UTC)

2019
September 20 - NSLSat 1 - Astra Space - Kodiak
NET September - ICON (Ionospheric Connection Explorer) [Explorer-96 (E-96), Helio-EX-1] - Pegasus XL - CCAFS, Runway 13/31, L-1011 "Stargazer" - 08:05-09:30
H2 - TBD - TBD - Kodiak
H2 - TBD - TBD - Kodiak
H2 - TBD - TBD - Kodiak
H2 - TBD - TBD - Kodiak
NET September 17  October 6 - CST-100 Starliner (unmanned test) (Boe-OFT) - Atlas V N22 (AV-080) - Canaveral SLC-41 (or Early October)
NET October 17 - Starlink v1.0 (x60) flight 1 - Falcon 9 - Canaveral SLC-40
October 21 - Cygnus NG-12 (CRS-12), ELaNa 25: HuskySat 1, SwampSat II - Antares-230 - MARS LP-0A - 18:39
NET  August 19  October - test launch (ballast/dummy payload, cubesats) - LauncherOne - Runway 12/30 Mojave Air and Space Port, Boeing 747 "Cosmic Girl" (or Early Fall)
November 4 - Starlink v1.0 (x60) flight 2 - Falcon 9 - Canaveral SLC-40
November - Anasis II - Falcon 9 - Canaveral SLC-40/Kennedy LC-39A
NET November - ELaNa XX: CACTUS 1, CAPE 3, ExoCube 2, INCA, MicroMAS 2b, MiTEE 1, PICS 1, PICS 2, PolarCube, Q-PACE, RadFxSat 2 (Fox 1E), TechEdSat 7 - LauncherOne - Runway 12/30 Mojave Air and Space Port, Boeing 747 "Cosmic Girl"
NET November - Kacific 1 (JCSat 18) - Falcon 9 - Canaveral SLC-40 (or Q4)
Fall - NROL-129 - Minotaur IV - MARS LA-08 (or Q4)
NET December 4  - Dragon SpX-19 (CRS-19), HISUI, CIRiS, EdgeCube, PTD-1 - Falcon 9 (B1056.3)  - Kennedy LC-39A
NET November 30  December 30 - CST-100 Starliner (manned test) (Boe-CFT) - Atlas V N22 (AV-082) - Canaveral SLC-41
NET December    17   30 - Dragon v2 (manned test) (SpX-DM2) - Falcon 9 (B1058.1) - Kennedy LC-39A (or Early 2020)
NET December - STP-27VP mission: MiniCarb, PAN A, PAN B - LauncherOne -  Runway15/33, Cape Canaveral, Boeing 747 "Cosmic Girl"
NET December - Ignis - LauncherOne - Guam International Airport, Boeing 747 "Cosmic Girl"
Late - TBD - Electron - MARS
Late - Landmapper-HD 1 (Corvus-HD 1) (TBD), Unicorn-2a, Delfi-PQ1 - Vector-R B1003 (inaugural flight) - Kodiak
Late - SiriusXM SXM-7 - Falcon 9 - Canaveral SLC-40

piggybacked:
NET H2 - LDPE-1 - NSSL - TBD
NET December - µHETsat - LauncherOne - Runway 12/30 Mojave Air and Space Port, Boeing 747 "Cosmic Girl"
Late - Hiber - Vector-R - Kodiak (or 2020)

2020
Early - SAOCOM-1B - Falcon 9 - Vandenberg SLC-4E
Early - test launch - Spinlaunch - Spaceport America (Truth or Consequences, NM)
December 2019  January - GPS III SV03 “Columbus” - Falcon 9 - Canaveral SLC-40
January - AFSPC-12: WFOV (Wide Field of View Testbed missile-warning satellite), ESPA - Atlas V - Canaveral SLC-41
January-February - DARPA Launch Challenge - Vector-R - MARS
January-February - DARPA Launch Challenge - LauncherOne - TBD, Boeing 747 "Cosmic Girl"
January-February - DARPA Launch Challenge - Astra - Kodiak
February 6 - Solar Orbiter (SolO)[LWS-5 Living With a Star mission-5] - Atlas V 411 (AV-0??) - Canaveral SLC-41 - 04:27
NET March 1 - Dragon SpX-20 (CRS-20), Bartolomeo (CEPHFISS) - Falcon 9 - Kennedy LC-39A
March - AEHF-6 - Atlas V 551 (AV-086) - Canaveral SLC-41
NET Q1 - Starling (x8) - LauncherOne - TBD, Boeing 747 "Cosmic Girl"
NET Q1 - Spaceflight - LauncherOne - TBD, Boeing 747 "Cosmic Girl"
NET Q1 - TBD - Firefly Alpha - Vandenberg SLC-2W
NET Q1 - Carbonite 4 (CBNT 4) - Firefly Alpha - Vandenberg SLC-2W
NET Q1 - TBD - Firefly Alpha - Vandenberg SLC-2W
H1 - Starlink v1.0 (x60) flight 3 - Falcon 9 - Canaveral SLC-40
H1 - Starlink v1.0 (x60) flight 4 - Falcon 9 - Canaveral SLC-40
H1 - Starlink v1.0 (x60) flight 5 - Falcon 9 - Canaveral SLC-40
H1 - Starlink v1.0 (x60) flight 6 - Falcon 9 - Canaveral SLC-40
H1 - Starlink v1.0 (x60) flight 7 - Falcon 9 - Canaveral SLC-40
H1 - Starlink v1.0 (x60) flight 8 - Falcon 9 - Canaveral SLC-40
H1 - Starlink v1.0 (x60) flight 9 - Falcon 9 - Canaveral SLC-40
NET December 2019  Q2 - AFSPC-7 (TBD): X-37B OTV-6 - Atlas V 501 (AV-0??) - Canaveral SLC-41
Q2 - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
Q2 - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
April 20 - Cygnus NG-13 (CRS-13) - Antares-230 - MARS LP-0A
April - AFSPC-8: GSSAP 5, GSSAP 6 - Atlas V 401 (AV-085) - Canaveral SLC-41
Mid-May - USCV-1: Dragon v2 - Falcon 9 - Kennedy LC-39A
NET May - GPS III SV04 - Falcon 9 - Canaveral SLC-40
Summer  June - NROL-44: Orion 10 (Mentor 8 ) (TBD) - Delta IV-H [D-385] - Canaveral SLC-37B
Midyear - SiriusXM SXM-8 - Falcon 9 - Canaveral SLC-40
July 17 - Mars robotic science rover, Mars Helicopter Scout, MMO (Mars Micro Orbiter), CubeSats - Atlas V 541 - Canaveral SLC-41 - 13:00-14:40
August - NROL-101 - Atlas V 551 (AV-088) - Canaveral SLC-41
NET August - Dragon v2 SpX-21 (CRS-21), Bishop (NanoRacks Airlock Module) - Falcon 9 - Kennedy LC-39A
July  September - NROL-82: KH-11 18 (Crystal 18, Block 5 #2) (TBD) - Delta IV-H [D-386] - Vandenberg SLC-6
NET September - GPS III SV05 - Falcon 9 - Canaveral SLC-40
NET September - GOES-T - NSSL - Canaveral (or 2021)
Q3 - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
Q3 - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
H2 - Starlink (x60) flight 10 - Falcon 9 - Canaveral SLC-40
H2 - Starlink (x60) flight 11 - Falcon 9 - Canaveral SLC-40
H2 - Starlink (x60) flight 12 - Falcon 9 - Canaveral SLC-40
H2 - Starlink (x60) flight 13 - Falcon 9 - Canaveral SLC-40
H2 - Starlink (x60) flight 14 - Falcon 9 - Canaveral SLC-40
H2 - Starlink (x60) flight 15 - Falcon 9 - Canaveral SLC-40
H2 - Starlink (x60) flight 16 - Falcon 9 - Canaveral SLC-40
Q4 - Turksat 5A - Falcon 9 - Canaveral SLC-40
Q4 - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
Q4 - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
October - CST-100 Starliner/Dragon v2 (commercial) - Atlas V N22/Falcon 9 - Canaveral SLC-41/Kennedy LC-39A
Mid-November - USCV-2: CST-100 Starliner - Atlas V N22 - Canaveral SLC-41
November - Jason-CS A (Sentinel-6A) - Falcon 9 - Vandenberg SLC-4E
NET November - SARah-1, TBD - Falcon 9 - Vandenberg SLC-4E
NET November - Smallsat Rideshare Mission 1 - Falcon 9 - Vandenberg SLC-4E (or Q1 2021)
Fall - AFSPC-44 - Falcon Heavy-04 - Kennedy LC-39A
December - CDARS (Cooperative Data and Rescue Services) - TBD - TBD
Late - Dragon v2 SpX-22 (CRS-22) - Falcon 9 - Kennedy LC-39A
Late - TBD - Terran-1 - Canaveral SLC-16
Late - ARTEMIS - LauncherOne - Cornwall Spaceport (UK), Boeing 747 "Cosmic Girl"
TBD - STP-3: STPSat-6, small satellite (x6) - Atlas V 551 - Canaveral SLC-41 (or 2021)
TBD - HyspIRI (Hyperspectral Infrared Imager) [Earth Systematic Mission] - NLSP-I - Vandenberg/Kodiak
NET Q1  TBD - NROL-111 - Minotaur I - MARS LP-0B (or Late 2019)
TBD - Open Cosmos sat - Vector-RE1 - Kodiak/Vandenberg/MARS
TBD - Spaceflight - Vector-RE1 - Kodiak/Vandenberg/MARS
TBD - Open Cosmos sat - Vector-RE1 - Kodiak/Vandenberg/MARS
TBD - York Space Systems - Vector-H - Kodiak/Vandenberg/MARS
TBD - York Space Systems - Vector-H - Kodiak/Vandenberg/MARS
TBD - York Space Systems - Vector-H - Kodiak/Vandenberg/MARS
TBD - TBD - Intrepid-1 - Kennedy LC-39C

piggybacked:
Midyear - HAKUTO-R Lunar Lander - Falcon 9 - Canaveral SLC-40
H2 - Astranis comsat - TBD - TBD
October - CougSat-1 - TBD - TBD
TBD - LDPE-2 - NSSL - TBD (or 2021)
TBD - Gunsmoke-J - TBD - TBD
TBD - Gunsmoke-G - TBD - TBD
TBD - TROPICS (Time-Resolved Observations of Precipitation structure and storm Intensity with a Constellation of Smallsats) - TBD - TBD
TBD - ORS-8 - TBD - TBD

2021
Early - ViaSat-3 Americas - Falcon Heavy - Kennedy LC-39A
NET February - GPS III SV06 - Falcon 9 - Canaveral SLC-40 (or NLT June 2021)
March - SBIRS-GEO 5 - Atlas V 411 - Canaveral SLC-41
March - CST-100 Starliner/Dragon v2 (commercial) - Atlas V N22/Falcon 9 - Canaveral SLC-41/Kennedy LC-39A
NET Q1 - first launch - OmegA - Kennedy LC-39B
H1 - Cygnus NG-14 (CRS-14) - Antares-230 - MARS LP-0A
April - Peregrine 1 (Astrobotic’s Lunar Lander), CubeRover - Vulcan-Centaur 522 (first launch) - Canaveral SLC-41 (or NET June)
April - STP-4 - NSSL - Canaveral
April - IXPE (Imaging X-ray Polarimetry Explorer) [SMEX-14] - Falcon 9 - Kennedy LC-39A
Mid-May - USCV-3: Dragon v2 - Falcon 9 - Kennedy LC-39A
Spring - AFSPC-52 - Falcon Heavy - Kennedy LC-39A
Midyear - ViaSat-3 EMEA-1 - Atlas V 551 - Canaveral SLC-41 (or 2021-2022)
Midyear - GPS III SV07 - NSSL - Canaveral
July - DART (Double Asteroid Redirection Test) - Falcon 9 - Vandenberg SLC-4E
July-August - ASLON-45 spacelift mission - Vector - MARS
August - second launch - Vulcan-Centaur - TBD
August - CST-100 Starliner/Dragon v2 (commercial) - Atlas V N22/Falcon 9 - Canaveral SLC-41/Kennedy LC-39A
September - Dream Chaser Cargo System 1st flight (SNC-1) - Vulcan Centaur 542 (second launch) - Canaveral SLC-41
September - SWOT (Surface Water Ocean Topography) [Earth Systematic Mission] - Falcon 9 - Vandenberg SLC-4E (or April 2022)
NLT September - SARah-2, SARah-3 - Falcon 9 - Vandenberg SLC-4E
Q3 - Dragon v2 SpX-23 (CRS-23) - Falcon 9 - Kennedy LC-39A
Q3 - Spaceflight mission - Terran-1 - TBD
Q4 - Dragon v2 SpX-24 (CRS-24) - Falcon 9 - Kennedy LC-39A
October 16 - Lucy [Discovery 13] - Atlas V 401 - Canaveral SLC-41
Mid-November - USCV-4: CST-100 Starliner - Atlas V N22 - Canaveral SLC-41
November - Landsat 9 - Atlas V 401 - Vandenberg SLC-3E (or December 15, 2020)
December - NROL-85: Intruder 13A / 13B (TBD) - Falcon 9 - Canaveral SLC-40
December - NROL-87 - Falcon 9 - Vandenberg SLC-4E
Late - Orion: Artemis 1 (EM-1 DRO Tactical DRM), NEA Scout, Lunar Flashlight, BioSentinel, Skyfire, Lunar IceCube, LunaH-Map, CuSP (CuSPP+), EQUULEUS, OMOTENASHI, ArgoMoon, Cislunar Explorer A (CEA), Cislunar Explorer B (CEB), CU-E3 (Colorado University Earth Escape Explorer), Miles - SLS Block I/iCPS - Kennedy LC-39B (or 2022)
Late - Inmarsat 6B - Falcon Heavy - Kennedy LC-39A
Late - GPS III SV08 - NSSL - Canaveral
Late - TBD - Firefly Beta - Vandenberg SLC-2W (or 2022)
TBD - Turksat 5B - Falcon 9 - Canaveral SLC-40
TBD - WorldView Legion sat (xTBD) - Falcon 9 - Canaveral SLC-40
TBD - WorldView Legion sat (xTBD) - Falcon 9 - Vandenberg SLC-4E
TBD - XBASE: B330 on ISS - Vulcan-Centaur 564 - Canaveral SLC-41
TBD - inaugural flight - Super Heavy/Starship - Kennedy LC-39A (or 2022)
TBD - inaugural flight - New Glenn - Canaveral SLC-36B
TBD - mu Space Corp Geo Comsat - New Glenn  - Canaveral SLC-36B
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48 (or 2022)
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48 (or 2022)
TBD - TBD - Phantom Express (XS-P) - Canaveral SLC-48 (or 2022)
TBD - Open Cosmos sat - Vector-RE1 - Kodiak/Vandenberg/MARS
TBD - York Space Systems - Vector-H - Kodiak/Vandenberg/MARS
TBD - York Space Systems - Vector-H - Kodiak/Vandenberg/MARS
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - TBD - Firefly Alpha - Vandenberg SLC-2W / Canaveral SLC-20
TBD - Telesat LEO Vantage (xTBD) - Terran-1 - Canaveral SLC-16 (or 2022)

piggybacked:
Early - GTOSat - NSSL - Canaveral
July - Peregrine 1 (Astrobotic’s Lunar Lander), CubeRover - Atlas V (TBD) - Canaveral SLC-41 (TBD)
July - Nova-C (Intuitive Machines Lunar Lander) - Falcon 9 - Canaveral SLC-40
Midyear - HAKUTO-R Lunar Rover - Falcon 9 - Canaveral SLC-40
TBD - XL-1 (Masten Space Systems Lunar Lander) - NSSL - Canaveral
TBD - CLOUD (x3) (Cloud Observation for Updraft Determination) (Earth Venture 2 Candidate) - NLSP-I
 - Vandenberg
TBD - ARCSTONE (Earth Venture 2 Candidate) - NLSP-I - Canaveral
TBD - Ovzon-3 - Falcon Heavy - Kennedy LC-39A
TBD - KPLO (Korea Pathfinder Lunar Orbiter) - Falcon 9 - Canaveral SLC-40

2022
January - Solar Sentinals - NLSP-I - Canaveral
March - NROL-107: SILENTBARKER - Atlas V - Canaveral SLC-41
Q1 - Smallsat Rideshare Mission 2 - Falcon 9 - Vandenberg SLC-4E
H1 - Cygnus NG-15 (CRS-15) - Antares-230 - MARS LP-0A
Mid-May - USCV-5: Dragon v2 - Falcon 9 - Kennedy LC-39A
Midyear - Orion: Artemis 2 (EM-2 Crew to Cis-lunar NRHO) - SLS Block I/iCPS - Kennedy LC-39B (or April 2023)
August 18 - PACE (Plankton, Aerosol, Cloud, ocean Ecosystem) - TBD - Vandenberg
August    6   20 - Psyche [Discovery 14], EscaPADE (Escape and Plasma Acceleration and Dynamics Explorers) [SIMPLEx program candidate] - NLSP-I - Canaveral
NET August - SBIRS-GEO 6 - Atlas V 411 - Canaveral SLC-41  (or October 2021-September 2022)
NET August - PUNCH-NFI [SMEX 15A], PUNCH-WFI1 [SMEX 15B], PUNCH-WFI2 [SMEX 15C], PUNCH-WFI3 [SMEX 15D], TRACERS A [SMEX 16A], TRACERS B [SMEX 16] - NLSP-II - TBD
September - Gateway PPE - NSSL - Canaveral
Q3 - AFSPC-67, LDPE-3 - NSSL - TBD
Q3 - Dragon v2 SpX-25 (CRS-25) - Falcon 9 - Kennedy LC-39A
NET Q4 2021  H2 - NROL-91: Orion 12 (Mentor 10) (TBD) - Delta IV-H [D-387] - Vandenberg SLC-6
NET December  H2 - NROL-68: Orion 11 (Mentor 9) (TBD) - Delta IV-H [D-388] - Canaveral SLC-37B
Q4 - Dragon v2 SpX-26 (CRS-26) - Falcon 9 - Kennedy LC-39A
Mid-November - USCV-6: CST-100 Starliner - Atlas V N22 - Canaveral SLC-41
Late - Eutelsat comsat - New Glenn  - Canaveral SLC-36B
Late - ASBM (Arctic Satellite Broadband Mission) (x2) - Falcon 9 - Canaveral SLC-40
TBD - JCSat comsat - New Glenn - Canaveral SLC-36B (or 2023)
TBD - Dream Chaser Cargo System (SNC-2) - Vulcan Centaur 542 - Canaveral SLC-41
TBD - ACE (Aerosol-Cloud-Ecosystems) [Earth Systematic Mission] - NLSP-I - Vandenberg
TBD - Open Cosmos sat - Vector-RE1 - Kodiak/Vandenberg/MARS
TBD - York Space Systems - Vector-H - Kodiak/Vandenberg/MARS
TBD - second launch - OmegA - Kennedy LC-39B
TBD - Mid-Sized Moon Lander - NSSL - Canaveral
TBD - GPS III SV09 - NSSL - Canaveral
TBD - GPS III SV10 - NSSL - Canaveral
TBD - mu Space LEO satellite - Terran-1 - Canaveral SLC-16
TBD - Restore-L - NSSL - Vandenberg

piggybacked:
NET Q4 - LDPE-4 - NSSL - TBD
TBD - Janus [SIMPLEx program candidate] - TBD - TBD
TBD - Lunar Trailblazer [SIMPLEx program candidate] - TBD - TBD

2023
January 1-17 - Europa Clipper (Orbiter) - SLS Block I/iCPS - Kennedy LC-39B (or 2025)
January - JPSS-2, LOFTID (Low Earth Orbit Flight Test of an Inflatable Decelerator) - Atlas V 401 - Vandenberg SLC-3E
Q1 - Smallsat Rideshare Mission 3 - Falcon 9 - Vandenberg SLC-4E
H1 - Cygnus NG-16 (CRS-16) - Antares-230 - MARS LP-0A
Mid-May - USCV-7: Dragon v2 - Falcon 9 - Kennedy LC-39A
Q3 - Dragon v2 SpX-27 (CRS-27) - Falcon 9 - Kennedy LC-39A
H2  January 2024 - NROL-70 - Delta IV-H [D-389] - Canaveral SLC-37B
Q4 - Dragon v2 SpX-28 (CRS-28) - Falcon 9 - Kennedy LC-39A
Mid-November - USCV-8: CST-100 Starliner - Atlas V N22 /Vulcan-Centaur - Canaveral SLC-41
NET November - WGS-11 - NSSL - Canaveral
TBD - Dream Chaser Cargo System (SNC-3) - Vulcan Centaur 542 - Canaveral SLC-41
TBD - Manned Circumlunar Mission - Super Heavy/Starship - Kennedy LC-39A/Boca Chica
TBD - GEO-CAPE (Geostationary Coastal and Air Pollution Events) [Earth Systematic Mission] -  NLSP-I - Canaveral
TBD - NG-OPIR-Polar 1 - Falcon-9/Vulcan Centaur - Canaveral SLC 40/41
TBD - NG-OPIR-GEO 1 - Falcon-9/Vulcan Centaur - Canaveral SLC 40/41
TBD - TBD - Vulcan-ACES - TBD
TBD - Open Cosmos sat - Vector-RE1 - Kodiak/Vandenberg/MARS
TBD - Blue Moon mission - New Glenn - Canaveral SLC-36B (or 2024)
TBD - SPHEREx (Spectro-Photometer for the History of the Universe, Epoch of Reionization and Ices Explorer) - TBD - TBD
TBD - NTS-3: NTS-3A (Navigational Test Satellite-3) - Vulcan-Centaur/Falcon 9 - Vandenberg SLC-3E/4E

piggybacked:
TBD - LDPE-5 - NSSL - TBD
TBD - LDPE-6 - NSSL - TBD
TBD - LDPE-7 - NSSL - TBD

2024
H1 - Cygnus NG-17 (CRS-17) - Antares-230 - MARS LP-0A
Mid-May - USCV-9: Dragon v2 - Falcon 9 - Kennedy LC-39A
Midyear - TDRS-4G-1 (Next Gen Earth Relay 1) - NSSL - Canaveral
Midyear - TDRS-4G-2 (Next Gen Earth Relay 2) - NSSL - Canaveral
Q3 - Dragon v2 SpX-29 (CRS-29) - Falcon 9 - Kennedy LC-39A
Q4 - Dragon v2 SpX-30 (CRS-30) - Falcon 9 - Kennedy LC-39A
NET October - DYNAMIC (Dynamical Neutral Atmosphere-Ionosphere Coupling) [STP-05 - Solar-Terrestrial Probes-05] - NLSP-II - Canaveral
Mid-November - USCV-10: CST-100 Starliner - Atlas V N22 /Vulcan-Centaur - Canaveral SLC-41
December - GOES-U - NSSL - Canaveral (or Q4)
Late - IMAP (Interstellar Mapping and Acceleration Probe) [STP-05 - Solar-Terrestrial Probes-05], SWFO-L1 (Space Weather Forward Observatory L1 mission) -  TBD - TBD
TBD - LOP-G Hab - NSSL - Canaveral
TBD - Lander modules (to Gateway) - NSSL - Canaveral
TBD - Orion: Artemis 3 (EM-3 Crew to Gateway with landing on Moon) - SLS Block I/iCPS - Kennedy LC-39B
TBD - Logistics Resupply, Robotic Arm (Gateway) - NSSL - Canaveral
TBD - Dream Chaser Cargo System (SNC-4) - Vulcan Centaur 542 - Canaveral SLC-41
TBD - Gateway Logistics/ARM - NSSL - Canaveral
TBD - Large-Sized Moon Lander - NSSL - Canaveral
TBD - TBD - OmegA Heavy - Kennedy LC-39B

2025
Early - Orion: Artemis 4 (crew launch to Gateway, landing on the lunar surface) - SLS Block IB/EUS - Kennedy LC-39B
H1 - Cygnus NG-18 (CRS-18) - Antares-230 - MARS LP-0A
Mid-May - USCV-11: Dragon v2 - Falcon 9 - Kennedy LC-39A
September - WFIRST-AFTA (Wide Field Infrared Survey Telescope - Astrophysics Focused Telescope Assets) [Astrophysics Decadal Mission Astro-1] - Vulcan-ACES 564/Falcon Heavy - Canaveral
Q3 - Dragon v2 SpX-31 (CRS-31) - Falcon 9 - Kennedy LC-39A
Q4 - Dragon v2 SpX-32 (CRS-32) - Falcon 9 - Kennedy LC-39A
Mid-November - USCV-12: CST-100 Starliner - Atlas V N22 /Vulcan-Centaur - Canaveral SLC-41
TBD - Dream Chaser Cargo System (SNC-5) - Vulcan Centaur 542 - Canaveral SLC-41

2026
H1 - Cygnus NG-19 (CRS-19) - Antares-230 - MARS LP-0A
Mid-May - USCV-13: Dragon v2 - Falcon 9 - Kennedy LC-39A
Q3 - JPSS-3 (PFO) - NLSP II - Vandenberg
Q3 - Dragon v2 SpX-33 (CRS-33) - Falcon 9 - Kennedy LC-39A
Q4 - Dragon v2 SpX-34 (CRS-34) - Falcon 9 - Kennedy LC-39A
Mid-November - USCV-14: CST-100 Starliner - Atlas V N22/Vulcan-Centaur - Canaveral SLC-41
TBD - Dream Chaser Cargo System (SNC-6) - Vulcan Centaur 542 - Canaveral SLC-41
TBD - Orion: Artemis 5 (crew launch to Gateway, landing on the lunar surface) - SLS Block IB/EUS II - Kennedy LC-39B
TBD - Logistics Resupply (Gateway) - NSSL - Canaveral
TBD - Artemis 6 (crew launch to Gateway, landing on the lunar surface)  - SLS Block IB/EUS - Kennedy LC-39B
TBD - Sample Fetch Rover, Earth Return Orbiter [Mars Sample Return (MSR)] - SLS Block 1B - Kennedy LC-39B
TBD - Lunar Sample Return - TBD - Canaveral
TBD - Advanced Exploration Moon Lander - TBD - Canaveral
TBD - GPS IIIF-01 (SV11) - NSSL - Canaveral
TBD - Dragonfly [New Frontiers-4] - NLSP-II - TBD

2027
H1 - Cygnus NG-20 (CRS-20) - Antares-230 - MARS LP-0A
Mid-May - USCV-15: Dragon v2 - Falcon 9 - Kennedy LC-39A
Q3 - Dragon v2 SpX-35 (CRS-35) - Falcon 9 - Kennedy LC-39A
Q4 - Dragon v2 SpX-36 (CRS-36) - Falcon 9 - Kennedy LC-39A
Mid-November - USCV-16: CST-100 Starliner - Atlas V N22/Vulcan-Centaur - Canaveral SLC-41
TBD - Dream Chaser Cargo System (SNC-7) - Vulcan Centaur 542 - Canaveral SLC-41
TBD - Orion: Artemis 7 (crew launch to Gateway, landing on the lunar surface) - SLS Block IB/EUS - Kennedy LC-39B

2028
H1 - Cygnus NG-21 (CRS-21) - Antares-230 - MARS LP-0A
Mid-May - USCV-17: Dragon v2 - Falcon 9 - Kennedy LC-39A
Q3 - Dragon v2 SpX-37 (CRS-37) - Falcon 9 - Kennedy LC-39A
Q4 - Dragon v2 SpX-38 (CRS-380) - Falcon 9 - Kennedy LC-39A
Mid-November - USCV-18: CST-100 Starliner - Atlas V N22/Vulcan-Centaur - Canaveral SLC-41
TBD - Dream Chaser Cargo System (SNC-8 ) - Vulcan Centaur 542 - Canaveral SLC-41
TBD - DST: Artemis-8 (EM-8 Cargo to Cis-lunar NRHO)- SLS Block IB/EUS - Kennedy LC-39B (or 2029)

2029
TBD - Orion: Artemis-9 (EM-9 Crew to Cis-lunar NRHO) - SLS Block II - Kennedy LC-39B

2030
TBD - Orion: Artemis-10 (EM-10 Crew to Cis-lunar NRHO) - SLS Block II - Kennedy LC-39B
TBD - Landsat 10 - NLSP-II - Vandenberg (or Late 2020s)

2031
Q3 - JPSS-4 (PFO) - NLSP-II - Vandenberg

Acronyms:
AFSPC-#     - Air Force Space Command-#
DRO            - Distant Retrograde Orbit
DSG            - Deep Space Gateway
DST             - Deep Space Transport
EELV           - Evolved Expendable Launch Vehicle program
EM-#          - Exploration Mission-#   
ESPA          - EELV Secondary Payload Adapter
LDPE-#      -  Long Duration Propulsive ESPA
LOP-G         - Lunar Orbital Platform – Gateway
LOP-G Hab  - LOP-G Habitation module
NFI              - Narrow Field Imager
NG-OPIR     - Next-Generation Overhead Persistent InfraRed
NLSP-I        - NASA Launch Services Program I
NLSP-II       - NASA Launch Services Program II
NRHO          - Near-Rectilinear Halo Orbit
NSSL           - National Security Space Launch program
PPE             - Power and Propulsion Element of LOP-G
PUNCH        - Polarimeter to Unify the Corona and Heliosphere
SBIRS          - Space Based Infrared System
SIMPLEx      - Small Innovative Missions for Planetary Exploration
STP-#          - Solar-Terrestrial Probes-#
TRACERS     - Tandem Reconnection and Cusp Electrodynamics Reconnaissance Satellites
USCV-#       - US Crew Vehicle-#
WFI             - Wide Field Imager

Statistics (active):
Antares           - 10 (WI - 10)
Atlas V            - 80 (СС - 65; Va - 15)
Delta IV          - 40 (СС - 32; Va - 8 )
Falcon 9         - 74 (СС - 59; Va - 15)
Falcon Heavy - 3 (CC - 3)
Minotaur        - 17 (СС - 1; Va - 7; WI - 7; Kd - 2)
Minotaur-C    - 11 (Va - 11)
Pegasus        - 43 (СС - 6; Va - 21; WI - 6; Ed - 5; Kw - 4; Ga - 1)

CC - Cape Canaveral Air Force Station; Ed - Edwards AFB; Kw - Kwajalein Island; Va - Vandenberg AFB; WI - Wallops Flight Facility; Ga - Base Aerea de Gando

Changes on August 18th
Changes on August 19th
Changes on August 20th
Changes on August 21st
Changes on August 22nd
Changes on August 23rd
Changes on August 24th
Changes on August 25th
« Last Edit: 08/25/2019 08:32 pm by Salo »

Offline Salo

  • Senior Member
  • *****
  • Posts: 15492
  • Odessa, Ukraine
  • Liked: 6499
  • Likes Given: 5050
Re: US Launch Schedule
« Reply #2462 on: 08/18/2019 11:11 am »
Unclear:
Date - Satellite(s) - Rocket - Launch Site - Time (UTC)

2020 - BlackSky Global (x 10+) - TBD - TBD (or PSLV)
NET 2020 - AFSPC-9 - Atlas V/Falcon 9 - Canaveral
NET 2020 - AFSPC-10 - Atlas V/Falcon 9 - Canaveral
NET 2020 - OneWeb  (x1-3) - LauncherOne - TBD, Boeing 747 "Cosmic Girl"
NET 2020 - OneWeb  (x1-3) - LauncherOne - TBD, Boeing 747 "Cosmic Girl"
NET 2020 - OneWeb  (x1-3) - LauncherOne - TBD, Boeing 747 "Cosmic Girl"
NET 2020 - OneWeb  (x1-3) - LauncherOne - TBD, Boeing 747 "Cosmic Girl"
Late 2021 - OptiSARTM Optical (x4), OptiSARTM Radar (x4) - TBD - TBD
2021 - NSTP-Sat - TBD - TBD
NET 2021 - Lunar Bullet - NEPTUNE N3 - open-ocean location off the California coast/KSC
NET 2021 - 30+ CubeSats, tubesats - NEPTUNE N5 - open-ocean location off the California coast/KSC
NET 2021 - 27 CubeSats, tubesats (Ballistic Lunar Transfer) - NEPTUNE N5 - open-ocean location off the California coast/KSC
NET 2021 - Starlink deployment  (many launches) - Falcon 9 - Canaveral SLC-40
NET 2021 - OneWeb (xTBD) - New Glenn - Vandenberg (or Ariane 62)
NET 2021 - OneWeb (xTBD) - New Glenn - Vandenberg (or Ariane 62)
NET 2021 - OneWeb (xTBD) - New Glenn - Vandenberg (or Ariane 62)
NET 2021 - OneWeb (xTBD) - New Glenn - Vandenberg (or Ariane 62)
NET 2021 - OneWeb (xTBD) - New Glenn - Vandenberg (or Ariane 62)
NET 2021 - BlackSky Global (x 14) partner satellite - TBD - TBD (or PSLV)
NET 2021 - WorldView Legion sat 2 - NSSL - Vandenberg
NET 2021 - MEV-3 - Falcon 9 - Canaveral (or Ariane/Proton)
NET 2021 - MEV-4 - Falcon 9 - Canaveral (or Ariane/Proton)
NET 2021 - MEV-5 - Falcon 9 - Canaveral (or Ariane/Proton)
NET 2021 - MEV-6 - Falcon 9 - Canaveral (or Ariane/Proton)
NET 2021 - MEV-7 - Falcon 9 - Canaveral (or Ariane/Proton)
NET 2021 - MEV-8 - Falcon 9 - Canaveral (or Ariane/Proton)
NET 2021 - MEV-9 - Falcon 9 - Canaveral (or Ariane/Proton)
NET 2021 - MEV-10 - Falcon 9 - Canaveral (or Ariane/Proton)
Q3 2022 - Helio-SMEX-1 - NLSP-II - TBD
Q4 2022 - ASCENDS (Active Sensing of CO2 Emissions over Nights, Days, and Seasons) [Earth Systematic Mission] - NLSP-II - Vandenberg
NET 2022 - Telesat LEO Vantage constellation multi-lanch agreement - New Glenn - Canaveral/vandenberg
NET 2022 - OptiSARTM Optical (x4), OptiSARTM Radar (x4) - TBD - TBD
NET 2022 - Cargo Mars Mission - Super Heavy/Starship - Kennedy LC-39A/Boca Chica
NET 2022 - Cargo Mars Mission - Super Heavy/Starship - Kennedy LC-39A/Boca Chica
NET 2022 - GPS III SV09 - NSSL - Canaveral
NET 2022 - GPS III SV10 - NSSL - Canaveral
NET 2022 - B330 - Vulcan-Centaur 564 - Canaveral SLC-41
2022-2023 - WSF-M 1 - NLSP-II - Vandenberg
Mid-2023 - Astro EX-2 - NLSP-II - TBD
Mid-2023 - ESDS-01 - NLSP-II - TBD
Mid-2023 - Helio-EX-2 - NLSP-II - Canaveral
2023 - Axiom Space’s module - Falcon Heavy - Kennedy LC-39A
NET 2023-2025 - GRACE-II [Earth Systematic Missions Candidate] - NLSP-II - Vandenberg
Mid-2024 - New Frontiers 4 - NLSP-II - TBD
August 15, 2024 - CAESAR (Comet Astrobiology Exploration Sample Return) [New Frontiers-4 candidate] - NLSP-II - TBD
Late 2024 - NEOCam (Near-Earth Object Camera) - NLSP-II - Canaveral (with IMAP)
NET 2024 - NG-OPIR-Polar 2 - Falcon-9/Vulcan Centaur - Canaveral SLC 40/41
NET 2024 - NG-OPIR-GEO 2 - Falcon-9/Vulcan Centaur - Canaveral SLC 40/41
NET 2024 - Cargo Mars Mission - Super Heavy/Starship - Kennedy LC-39A/Boca Chica
NET 2024 - Cargo Mars Mission - Super Heavy/Starship - Kennedy LC-39A/Boca Chica
NET 2024 - Manned Mars Mission - Super Heavy/Starship - Kennedy LC-39A/Boca Chica
NET 2024 - Manned Mars Mission - Super Heavy/Starship - Kennedy LC-39A/Boca Chica
NET 2024 - Japan cis-lunar cargo ship - Falcon Heavy - Kennedy LC-39A
NET 2024 - ESPRIT module (LOP-G) - Falcon Heavy - Kennedy LC-39A
Mid-2025 - STP-06 - NLSP-II - TBD
Mid-2025 - ESDS-02 - NLSP-II - TBD
Mid-2025 - EVM-3 - NLSP-II - TBD
Mid-2025 - Helio-EX-3 - NLSP-II - TBD
Q4 2025 - Europa Lander - SLS Block IB - Kennedy LC-39B
NET 2025 - AEHF-7 - Vulcan-Centaur/Falcon 9 - Canaveral
NET 2025 - AEHF-8 - Vulcan-Centaur/Falcon 9 - Canaveral
NET 2025 - TDRS-4G-3 (Next Gen Earth Relay 3) - NSSL - Canaveral
NET 2025 - TDRS-4G-4 (Next Gen Earth Relay 4) - NSSL - Canaveral
H2 2025-2026 - HOVER (Hyperspectral Observer for Venus Reconnaissance) [Discovery 15 candidate] - TBD - TBD (or H2 2028-2029)
H2 2025-2026 - VERITAS (Venus geophysical orbiter) [Discovery 15 candidate] - TBD - TBD (or H2 2028-2029)
H2 2025-2026 - MAGIC (Callisto geophysical mission) [Discovery 15 candidate] - TBD - TBD (or H2 2028-2029)
H2 2025-2026 - Chimera (Centaur flyby) [Discovery 15 candidate] - TBD - TBD (or H2 2028-2029)
H2 2025-2026 - FOSSIL (Fragments from the Origins of the Solar System and our Interstellar Locale) [Discovery 15 candidate] - TBD - TBD (or H2 2028-2029)
H2 2025-2026 - MANTIS (Main-belt Asteroid and NEO Tour with Imaging and Spectroscopy) [Discovery 15 candidate] - TBD - TBD (or H2 2028-2029)
H2 2025-2026 - Io Volcano Observer [Discovery 15 candidate] - TBD - TBD (or H2 2028-2029)
H2 2025-2026 - COMPASS (Climate Orbiter for Mars Polar Atmospheric and Subsurface Science) [Discovery 15 candidate] - TBD - TBD (or H2 2028-2029)
H2 2025-2026 - ISOCHRON (Inner Solar System Chronology) (lunar sample return) [Discovery 15 candidate] - TBD - TBD (or H2 2028-2029)
H2 2025-2026 - Moon Diver (study a lunar cave) [Discovery 15 candidate] - TBD - TBD (or H2 2028-2029)
H2 2025-2026 - NanoSWARM (lunar swirls) [Discovery 15 candidate] - TBD - TBD (or H2 2028-2029)
H2 2025-2026 - DAVINCI (Deep Atmosphere Venus Investigation of Noble gases, Chemistry, and Imaging) [Discovery 15 candidate] - TBD - TBD (or H2 2028-2029)
April 15 - May 5, 2026 - Trident (Trident Triton flyby) [Discovery 15 candidate] - Atlas V 401 - Canaveral SLC-41
Mid-2026- Astro-SMEX-2 - NLSP-II - TBD
NET 2026- WSF-M 2 - NLSP-II - Vandenberg
2026-2034 - GPS IIIF-02 (SV12) - NSSL - Canaveral
2026-2034 - GPS IIIF-03 (SV13) - NSSL - Canaveral
2026-2034 - GPS IIIF-04 (SV14) - NSSL - Canaveral
2026-2034 - GPS IIIF-05 (SV15) - NSSL - Canaveral
2026-2034 - GPS IIIF-06 (SV16) - NSSL - Canaveral
2026-2034 - GPS IIIF-07 (SV17) - NSSL - Canaveral
2026-2034 - GPS IIIF-08 (SV18) - NSSL - Canaveral
2026-2034 - GPS IIIF-09 (SV19) - NSSL - Canaveral
2026-2034 - GPS IIIF-10 (SV20) - NSSL - Canaveral
2026-2034 - GPS IIIF-11 (SV21) - NSSL - Canaveral
2026-2034 - GPS IIIF-12 (SV22) - NSSL - Canaveral
2026-2034 - GPS IIIF-13 (SV23) - NSSL - Canaveral
2026-2034 - GPS IIIF-14 (SV24) - NSSL - Canaveral
2026-2034 - GPS IIIF-15 (SV25) - NSSL - Canaveral
2026-2034 - GPS IIIF-16 (SV26) - NSSL - Canaveral
2026-2034 - GPS IIIF-17 (SV27) - NSSL - Canaveral
2026-2034 - GPS IIIF-18 (SV28) - NSSL - Canaveral
2026-2034 - GPS IIIF-19 (SV29) - NSSL - Canaveral
2026-2034 - GPS IIIF-20 (SV30) - NSSL - Canaveral
2026-2034 - GPS IIIF-21 (SV31) - NSSL - Canaveral
2026-2034 - GPS IIIF-22 (SV32) - NSSL - Canaveral
Mid-2027 - ESDS-03 - NLSP-II - TBD
Mid-2028 - Astro EX-3 - NLSP-II - TBD
Mid-2028 - ESDS-04 - NLSP-II - TBD
Mid-2028 - Discovery 16 - NLSP-II - TBD
Mid-2028 - New Frontiers 5 - NLSP-II - TBD
2028 - Mars Mission - NLSP-II - TBD
Q2 2029 - Lunar Geophysical Network [New Frontiers-5 candidate] - NLSP-II - TBD
Q2 2029 - Io Probe [New Frontiers-5 candidate] - NLSP-II - TBD
Q2 2029 - VICI (Venus In-Situ Composition Investigations) [New Frontiers-5 candidate] - NLSP-II - TBD
Q2 2029 - ELSAH (Enceladus Life Signatures and Habitability) [New Frontiers-5 candidate] - NLSP-II - TBD
Mid-2029 - EVM-4 - NLSP-II - TBD
Mid-2029 - Helio-SMEX-2 - NLSP-II - TBD
Late 2020s - NG-OPIR-GEO 3 - Falcon-9/Vulcan Centaur - Canaveral SLC 40/41
Late 2020s - NeMO (New Mars Orbiter) - Falcon 9/Atlas V 411 - Canaveral SLC 40/41
Late 2020s - Mars orbiter - NLSP-II - TBD
2020s - WSF‐E - NLSP-II - Vandenberg
2020s - WSF‐G - NLSP-II - Canaveral
January 2030 - Areostationary Relay Satellite-1 - NLSP-II - Canaveral
Mid-2030 - ESDS-05 - NLSP-II - TBD
Mid-2030 - HST Disposal (Hubble Space Telescope Disposal Mission) - NLSP-II - TBD
Mid-2030 - Discovery 17 - NLSP-II - TBD
NET 2030 - 3D Winds (Demo) [Earth Systematic Missions Candidate] - NLSP-II - Vandenberg
NET 2030 - GACM (Global Atmosphere Composition Mission) [Earth Systematic Missions Candidate] - NLSP-II - Vandenberg
NET 2030 - LIST (Lidar Surface Topography) [Earth Systematic Missions Candidate] - NLSP-II - Vandenberg
NET 2030 - PATH (Precision and All-Weather Temperature and Humidity) [Earth Systematic Missions Candidate] - NLSP-II - Vandenberg
NET 2030 - SCLP (Snow and Cold Land Processes) [Earth Systematic Missions Candidate] - NLSP-II - Vandenberg
NET October 2031 - GPS III-32 - NSSL - Canaveral
Q2 2032  - New Frontiers-6 - NLSP-II - TBD
Mid-2032 - ESDS-06 - NLSP-II - TBD
Mid-2032 - EVM-5 - NLSP-II - TBD
Mid-2032  - Helio-EX-4 - NLSP-II - TBD
2032 - MEDICI (Magnetosphere Energetics, Dynamics, and Ionospheric Coupling Investigation) [STP-07] - NLSP-II - Canaveral
February 2033 - Areostationary Relay Satellite-2 - NLSP-II - Canaveral
Mid-2033 - Astro EX-4 - NLSP-II - TBD
Mid-2033 - ESDS-07 - NLSP-II - TBD
Mid-2033 - LWS-7 - NLSP-II - TBD
Mid-2033 - Astro-2 - NLSP-II - TBD
Mid-2033 - Astro-3 - NLSP-II - TBD
Mid-2034 - Astro-SMEX-4 - NLSP-II - TBD
Mid-2035 - Helio-SMEX-3 - NLSP-II - TBD
2035 - Origins Space Telescope (Far IR Surveyor) [Astro-2/ Astro2020 candidate] - NLSP-II - TBD
2035 - HabEx (Habitable Exoplanet Imaging Mission) [Astro-2/ Astro2020 candidate] - NLSP-II - TBD
2035 - Lynx (X-Ray Surveyor) [Astro-2/ Astro2020 candidate] - NLSP-II - TBD
Mid-2036 - ESDS-08 - NLSP-II - TBD
Mid-2036 - EVM-6 - NLSP-II - TBD
2036 - JPSS-5 (PFO) - NLSP-II - Vandenberg
2036 - Astro-4 - NLSP-II - TBD
Mid-2037 - STP-08 - NLSP-II - TBD (or Mid-2039)
Mid-2039 - ESDS-09 - NLSP-II - TBD
Mid-2039 - Astro-5 - NLSP-II - TBD
2039 - LUVOIR (Large Ultraviolet/Optical/Infrared Surveyor - large 16-meter space telescope) [Astro-2/  Astro2020 candidate] - SLS - Kennedy LC-39B
2030s - Landsat 11 - NLSP-II - Vandenberg
2030s - Interstellar Probe - TBD - TBD
Mid-2041 - EVM-7 - NLSP-II - TBD
2041 - JPSS-6 (PFO) - NLSP-II - Vandenberg
Mid-2042 - STP-09 - NLSP-II - TBD
Mid-2042 - Astro-6 - NLSP-II - TBD
NET 2043 - LWS-8 - NLSP-II - TBD
2046 - JPSS-7 (PFO) - NLSP-II - TBD
2050s - JPSS-8 (PFO) - NLSP-II - Vandenberg
2050s - JPSS-9 (PFO) - NLSP-II - Vandenberg
2050s - JPSS-10 (PFO) - NLSP-II - Vandenberg
2069 - interstellar mission - TBD - TBD
TBD - WGS-12 - NSSL - Canaveral
TBD - SBSS FO 1 - NSSL/Minotaur - TBD
TBD - SBSS FO 2 - NSSL/Minotaur - TBD
TBD - SBSS FO 3 - NSSL/Minotaur - TBD
TBD - SBSS FO 4 - NSSL/Minotaur - TBD
TBD - SBSS FO 5 - NSSL/Minotaur - TBD

piggybacked:
TBD - CryoCube 2 (CC-2) - TBD - TBD
TBD - GNS BEE 1, GNS BEE 2, GNS BEE 3, GNS BEE 4 (Global Network of Swarms) - TBD - TBD
TBD - SABOR - TBD - TBD
TBD - Polaris (Persistent Tactical Communications) - TBD - TBD
TBD - Gunsmoke-L - TBD - TBD

Acronyms:
Astro-#           - Astro decadal mission
Astro EX-#      - Astrophysics Explorer Mission
Astro-SMEX-#  - Astrophysics Small Explorer Mission
DST                - Deep Space Transport
EELV               - Evolved Expendable Launch Vehicle
ESDS-#           - Earth Science Decadal Survey Mission
EVM-#             - Earth Venture Mission
Helio-EX-#       - Heliophysics Explorer Mission -
Helio-SMEX-#   - Heliophysics Small Explorer Mission
LWS-#             - Living With a Star mission
NG-OPIR           - Next-Generation Overhead Persistent InfraRed
NSSL               - National Security Space Launch program
SBIRS              - Space Based Infrared System
STP-#             - Solar-Terrestrial Probes
WSF‐G #         - Weather Satellite Follow-on Geostationary
WSF‐E #         - Weather Satellite Follow-on Electro-Optical / Infrared (EO/IR)
WSF‐M #         - Weather System Follow‐On Microwave

Changes on August 18th
« Last Edit: 08/18/2019 02:49 pm by Salo »

Offline scr00chy

  • Full Member
  • ****
  • Posts: 1249
  • Czechia
    • ElonX.net
  • Liked: 1756
  • Likes Given: 2053
Re: US Launch Schedule
« Reply #2463 on: 08/19/2019 03:18 pm »
Peter McGrath, Boeing, at AIAA Prop & Energy Forum: Starliner Orbital Flight Test scheduled for October, pad abort test at White Sands “more than likely” to follow a short time after OFT.

https://twitter.com/StephenClark1/status/1163469999547277312

Offline Salo

  • Senior Member
  • *****
  • Posts: 15492
  • Odessa, Ukraine
  • Liked: 6499
  • Likes Given: 5050

Offline Salo

  • Senior Member
  • *****
  • Posts: 15492
  • Odessa, Ukraine
  • Liked: 6499
  • Likes Given: 5050
Re: US Launch Schedule
« Reply #2465 on: 08/20/2019 05:24 pm »
https://www.ulalaunch.com/missions/delta-iv-gps-iii-sv-2/
Quote
Aug 20 16:31
Launch Readiness Review completed
...
Thursday's launch is scheduled for 9:00:30 a.m. EDT (1300:30 UTC) from Space Launch Complex-37 at Cape Canaveral Air Force Station, Florida. The available window extends to 9:27 a.m., a duration of 26 minutes and 30 seconds.

Offline zubenelgenubi

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 14627
  • Arc to Arcturus, then Spike to Spica
  • Sometimes it feels like Trantor in the time of Hari Seldon
  • Liked: 9644
  • Likes Given: 99423
Re: US Launch Schedule
« Reply #2466 on: 08/20/2019 07:40 pm »
Cross-post; GPS III SV03 launching in January 2020:
https://twitter.com/emrekelly/status/1163897322872459267

Quote
Update from SMC: #SpaceX Falcon 9 now slated to launch GPS III SV03 in January. Eastern Range.

(📷: @LockheedMartin)
« Last Edit: 08/20/2019 07:41 pm by zubenelgenubi »
Support your local planetarium! (COVID-panic and forward: Now more than ever.) My current avatar is saying "i wants to go uppies!" Yes, there are God-given rights. Do you wish to gainsay the Declaration of Independence?

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 10903
  • US
  • Liked: 15243
  • Likes Given: 6766
Re: US Launch Schedule
« Reply #2467 on: 08/20/2019 08:01 pm »
https://twitter.com/StephenClark1/status/1163898898253041664
Quote
2/2 After Thursday’s Delta 4-Medium swan song, ULA plans two Delta 4-Heavy missions next year, both for the NRO. First up is NROL-44 from Cape Canaveral in June 2020, followed by NROL-82 from Vandenberg AFB in September 2020.

Offline PM3

  • Full Member
  • ****
  • Posts: 1709
  • Germany
  • Liked: 2179
  • Likes Given: 1537
Re: US Launch Schedule
« Reply #2468 on: 08/20/2019 11:26 pm »
2021
April - first launch - Vulcan-Centaur - TBD
July - Peregrine 1 (Astrobotic’s Lunar Lander), CubeRover - Atlas V (TBD) - Canaveral SLC-41 (TBD)

It looks like Peregrine 1 will go on the first Vulcan: It will be the "first of two certification flights", and the two first Vulcan flights will be the certification flights (source). The July target for Peregrine is more up-to-date than the April target for Vulcan, so I guess the latter one slips to July.

There will be additional payloads besides Peregrine, see https://forum.nasaspaceflight.com/index.php?topic=47773.msg1981261#msg1981261.

Quote
August - second launch - Vulcan-Centaur - TBD
September - Dream Chaser Cargo System 1st flight (SNC-1) - Vulcan Centaur 542 - Canaveral SLC-41

Same as above: Dream Chaser's first flight will be Vulcan's "second certification flight" (source), and thus the second Vulcan flight.

Quote
2022
August 6 - Psyche [Discovery 14], EscaPADE (Escape and Plasma Acceleration and Dynamics Explorers) [SIMPLEx program candidate] - NLSP-I - Canaveral

Whyever, this slips by two weeks to 20 August. See countdown clock at psyche.asu.edu or this source, which is some months newer than the source for the August 6 date.

« Last Edit: 08/20/2019 11:31 pm by PM3 »
"Never, never be afraid of the truth." -- Jim Bridenstine

Offline Salo

  • Senior Member
  • *****
  • Posts: 15492
  • Odessa, Ukraine
  • Liked: 6499
  • Likes Given: 5050
Re: US Launch Schedule
« Reply #2469 on: 08/21/2019 04:15 am »
https://ria.ru/20190821/1557724380.html
Google translate:
Quote
MOSCOW, Aug 21 - RIA News. The launch to the International Space Station (ISS) of the American Boeing-developed Starliner unmanned vehicle was postponed from September 17 to October 6, and the manned one from November 30 to December 30, a source in the rocket and space industry told RIA Novosti.

Offline Salo

  • Senior Member
  • *****
  • Posts: 15492
  • Odessa, Ukraine
  • Liked: 6499
  • Likes Given: 5050
Re: US Launch Schedule
« Reply #2470 on: 08/21/2019 01:07 pm »
https://spaceflightnow.com/2019/08/20/astrobotic-lunar-lander-to-launch-on-ulas-first-vulcan-rocket/
Quote
Thornton said Monday that the Peregrine’s first mission is scheduled for launch in June 2021. ULA has been targeting April 2021 for the first launch of the Vulcan Centaur rocket. It was not immediately clear which schedule target was most up to date.
“We’re on schedule for summer 2021,” Thornton said Monday. “We are, right now, ordering long-lead items. We are finishing our integrated avionics unit and flight computer. We’re also getting ready to build our structural test model, as well as gearing up for our critical design review toward the end of this year.

Offline PM3

  • Full Member
  • ****
  • Posts: 1709
  • Germany
  • Liked: 2179
  • Likes Given: 1537
Re: US Launch Schedule
« Reply #2471 on: 08/22/2019 03:29 am »
2021
NET Q4 - NROL-91: Orion 12 (Mentor 10) (TBD) - Delta IV-H [D-387] - Vandenberg SLC-6

2022
NET December - NROL-68: Orion 11 (Mentor 9) (TBD) - Delta IV-H [D-388] - Canaveral SLC-37B

2024
January - NROL-70 - Delta IV-H [D-389] - Canaveral SLC-37B

Caleb Henry now gives a surprisingly different schedule for these launches:

NROL-91 in second half of 2022
NROL-70 in second half of 2022
NROL-68 in second half of 2023

https://spacenews.com/ulas-delta-4-heavy-down-to-final-five-missions/
"Never, never be afraid of the truth." -- Jim Bridenstine

Offline Salo

  • Senior Member
  • *****
  • Posts: 15492
  • Odessa, Ukraine
  • Liked: 6499
  • Likes Given: 5050

Offline SMS

  • Regular
  • Senior Member
  • *****
  • Posts: 3450
    • Astronauts & their spaceflights
  • Liked: 2438
  • Likes Given: 255
---
SMS ;-). "The most striking product of the human mind is mathematics" - Paul Davies

Offline Newton_V

  • Full Member
  • ****
  • Posts: 898
  • United States
  • Liked: 921
  • Likes Given: 135
Re: US Launch Schedule
« Reply #2474 on: 08/22/2019 08:26 pm »

Caleb Henry now gives a surprisingly different schedule for these launches:

NROL-91 in second half of 2022
NROL-70 in second half of 2022
NROL-68 in second half of 2023

70 is the last of those 3

Offline SMS

  • Regular
  • Senior Member
  • *****
  • Posts: 3450
    • Astronauts & their spaceflights
  • Liked: 2438
  • Likes Given: 255
Re: US Launch Schedule
« Reply #2475 on: 08/23/2019 05:46 pm »
https://ria.ru/20190822/1557767203.html
Google translate:
Quote
MOSCOW, Aug 22 - RIA News. The launch to the International Space Station of the first American ship Crew Dragon with the crew, previously planned for December 17, is scheduled for December 30, RIA Novosti was told in a source in the rocket and space industry.
---
SMS ;-). "The most striking product of the human mind is mathematics" - Paul Davies

Offline PM3

  • Full Member
  • ****
  • Posts: 1709
  • Germany
  • Liked: 2179
  • Likes Given: 1537
Re: US Launch Schedule
« Reply #2476 on: 08/23/2019 06:21 pm »
https://ria.ru/20190821/1557724380.html
Google translate:
Quote
MOSCOW, Aug 21 - RIA News. The launch to the International Space Station (ISS) of the American Boeing-developed Starliner unmanned vehicle was postponed from September 17 to October 6, and the manned one from November 30 to December 30, a source in the rocket and space industry told RIA Novosti.

https://ria.ru/20190822/1557767203.html
Google translate:
Quote
MOSCOW, Aug 22 - RIA News. The launch to the International Space Station of the first American ship Crew Dragon with the crew, previously planned for December 17, is scheduled for December 30, RIA Novosti was told in a source in the rocket and space industry.

Sure, two crew launches from the Cape on the same day.  ::)

What RIA is publishing here are - as always - just random "working dates" of NASA project planning, not real launch dates.
"Never, never be afraid of the truth." -- Jim Bridenstine

Offline SMS

  • Regular
  • Senior Member
  • *****
  • Posts: 3450
    • Astronauts & their spaceflights
  • Liked: 2438
  • Likes Given: 255
Re: US Launch Schedule
« Reply #2477 on: 08/23/2019 07:11 pm »
more from the same url:

"According to the current plan, the Crew Dragon ship for the first time with the crew should go to the ISS on December 30," the source said. He explained that this date is preliminary and further delay in launch is not ruled out."
---
SMS ;-). "The most striking product of the human mind is mathematics" - Paul Davies

Offline zubenelgenubi

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 14627
  • Arc to Arcturus, then Spike to Spica
  • Sometimes it feels like Trantor in the time of Hari Seldon
  • Liked: 9644
  • Likes Given: 99423
Re: US Launch Schedule
« Reply #2478 on: 08/25/2019 12:38 am »
Cross-posts; already updated here:
Re: launch quarter of OTV-6, from SFN Launch Schedule, updated August 23:
second quarter 2020

Re: launch month of GPS III SV04, from SFN Launch Schedule, updated August 23:
May 2020
« Last Edit: 08/25/2019 01:56 am by zubenelgenubi »
Support your local planetarium! (COVID-panic and forward: Now more than ever.) My current avatar is saying "i wants to go uppies!" Yes, there are God-given rights. Do you wish to gainsay the Declaration of Independence?

Offline Salo

  • Senior Member
  • *****
  • Posts: 15492
  • Odessa, Ukraine
  • Liked: 6499
  • Likes Given: 5050
Re: US Launch Schedule
« Reply #2479 on: 08/25/2019 08:29 pm »
https://twitter.com/pbdes/status/1165007573600202752
Quote
Startup telecom satellite operator @OvzonAB moves launch of its 500-kg @Maxar GEO satellite, to @Arianespace @ArianeGroup Ariane 5 from @SpaceX Falcon Heavy; writes down advance payments to @northropgrumman for earlier satellite design.

https://www.ovzon.com/en/interim-report-january-june-2019/
Quote
CEO statement

Important customer agreements and financing of Ovzon 3

During the second quarter, we continued to develop the company according to plan. The last bit of funding for Ovzon 3 is in place and Maxar, our satellite provider, has started the project to build the satellite. As for the launch of the satellite, we have recently contracted Arianespace to launch our satellite in 2021 and we have thus left the preliminary agreements we had.

 

Advertisement NovaTech
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0