Author Topic: ISS U.S. EVA-51 - June 14, 2018  (Read 18016 times)

Offline Rondaz

  • Full Member
  • **
  • Posts: 248
  • Liked: 58
  • Likes Given: 103
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #20 on: 06/08/2018 02:20 PM »
ISS Daily Summary Report – 6/07/2018

Extravehicular Activity (EVA) Preparations: Today the crew continued configuring EVA tools and equipment needed during the upcoming US EVA #51 Node 2 External Wireless Communications (EWC) planned for June 14th.  They charged GoPro batteries, performed a Rechargeable EVA Battery Assembly (REBA) checkout, and reviewed detailed procedures in the EVA Briefing Package.  A procedures conference with ground-based EVA specialists completed today’s EVA activities.

Offline Rondaz

  • Full Member
  • **
  • Posts: 248
  • Liked: 58
  • Likes Given: 103
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #21 on: 06/11/2018 02:24 PM »
ISS Daily Summary Report – 6/08/2018

Extravehicular Activity (EVA) Preparations: Today the crew performed a Simplified Aid for EVA Rescue (SAFER) gas check, swapped out EVA GoPro camera equipment, and set up the EVA GoPro camera for EVA.  The crew continued configuring EVA tools and equipment needed during the upcoming US EVA #51 Node 2 External Wireless Communications (EWC) planned for 14th.

Offline Rondaz

  • Full Member
  • **
  • Posts: 248
  • Liked: 58
  • Likes Given: 103
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #22 on: 06/12/2018 09:41 PM »
ISS Daily Summary Report – 6/11/2018

Extravehicular Activity (EVA) Preparations: In preparation for this week’s US EVA #51 Node 2 External Wireless Communications (EWC), the crew used computer-aided simulations to review EVA procedures via Dynamic Onboard Ubiquitous Graphics (DOUG).  Later in the day, the crew participated in an EVA procedures conference to review their DOUG session and EVA procedures with ground specialists.

Mobile Servicing System (MSS) Operations: Robotics specialists conducted a Mobile Transporter (MT) Translation from Work Site (WS)4 to WS3 this afternoon and maneuvered the Space Station Remote Manipulator System (SSRMS) to stow the Special Purpose Dexterous Manipulator (SPDM) on the

Mobile Base System (MBS)-2.  Once complete, they grappled the Node 2 (N2) Power Data Grapple Fixture (PDGF) with SSRMS.  These activities put the MSS in the required configuration to support Thursday’s US EVA #51 Node 2 External Wireless Communications (EWC).

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 3871
  • near hangar 18
  • Liked: 982
  • Likes Given: 478
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #23 on: 06/14/2018 06:29 AM »
Crew is awake with Serena reporting the ham radio has been powered down in Columbus
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 3871
  • near hangar 18
  • Liked: 982
  • Likes Given: 478
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #24 on: 06/14/2018 06:37 AM »
crew will clear Houston to come on board with video "once everyone is dressed..."  :)
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 3871
  • near hangar 18
  • Liked: 982
  • Likes Given: 478
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #25 on: 06/14/2018 06:53 AM »
Houston cleared onboard with video.  ISS Streaming feed is showing the WVS feed, currently color bars, as usual
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline Targeteer

  • Senior Member
  • *****
  • Posts: 3871
  • near hangar 18
  • Liked: 982
  • Likes Given: 478
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #26 on: 06/14/2018 07:53 AM »
Depress initiated
Best quote heard during an inspection, "I was unaware that I was the only one who was aware."

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1570
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #27 on: 06/14/2018 10:22 AM »
For reminder, today's activities…
3 main tasks:
- Installation of brackets and two high-definition cameras near an IDA "International Docking Adapter" at the end of Node-2 Harmony module.
-Swap out of a HD camera assembly on the starboard truss of the station.
-Close an aperture door on an external environmental imaging experiment (CATS) outside the Kibo module.
« Last Edit: 06/14/2018 10:42 AM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1570
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #28 on: 06/14/2018 10:26 AM »
And today's spacewalkers:

- EV-1 Ricky Arnold (this will be his 5th EVA) will wear a suit bearing red stripes

- EV-2 Drew Feustel (9th EVA) will have no stripes on his suit.

« Last Edit: 06/14/2018 10:32 AM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1570
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #29 on: 06/14/2018 10:30 AM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1570
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #30 on: 06/14/2018 10:31 AM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1570
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #31 on: 06/14/2018 10:34 AM »
« Last Edit: 06/14/2018 10:35 AM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1570
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #32 on: 06/14/2018 10:37 AM »
"Mobile Work Station" installation on Drew's EMU.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1570
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #33 on: 06/14/2018 10:39 AM »
Ground IV capcom: Andreas Mogensen
ISS capcom: Tracy Caldwell Dyson
« Last Edit: 06/14/2018 10:41 AM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1570
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #34 on: 06/14/2018 10:40 AM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1570
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #35 on: 06/14/2018 10:44 AM »
Keith Johnson, is the U.S. spacewalk officer for this US EVA.

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1570
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #36 on: 06/14/2018 10:46 AM »
MetOx installation...
« Last Edit: 06/14/2018 10:48 AM by centaurinasa »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1570
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #37 on: 06/14/2018 10:51 AM »

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1570
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #38 on: 06/14/2018 10:56 AM »
MCC-H timeline update: "Go for depress at 11.31 UTC"

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 4905
  • PARIS
  • Liked: 2898
  • Likes Given: 1570
Re: ISS U.S. EVA-51 - June 14, 2018
« Reply #39 on: 06/14/2018 11:05 AM »
SAFER 18: EV-1
SAFER 13: EV-2

Tags: