Our team just nailed the stage separation test of Vikram-1. The ultra-low shock pneumatic separation system we developed in-house worked like a charm, smoothly separating Stage 2 from Stage 3 — in another boost to our journey to orbit!
May 21, 2025This milestone underscores our steadfast dedication to world-class quality and global aerospace standards at every step of designing, manufacturing, and powering our space vehicles.
Jun 5, 2025Our Avionics modules are ready for lift-off! 🚀The suite of in-house developed modules were tested on every signal path for the minutest glitch. They've now been promoted from the lab bench to launch rail — ready to run Vikram-1 autonomously to orbit!