Note, the SCS guide petals can be manually removed after docking to increase the passageway clearance. Section 3.11.1 provides more information on petal removal capability
3.11.1 IVA TRANSFER CORRIDOR AND AIDSThe Block 0 NDS design has SCS docking alignment petals that are fixed and cannot fold back into a stowage position for mated operations. With the SCS petals fixed in the deployed position, the NDS assembly provides an IVA transfer corridor diameter of ~27 inches as shown in Figure 3.3.2-1. The deployed petal clearance of ~27 inches (685 mm) has been evaluated as suitable for IVA Crew and Cargo Transfer Bag/Locker transfer. After the NDS is hard mated and pressurized, the SCS petals can be manually removed by an IVA crewmember to enlarge the transfer corridor diameter up to ~32 inches. However, the SCS alignment petals must be re-installed prior to vehicle undocking.
Gateway will use NDS (an implementation of IDSS), and NDS has pedals that can be manually removed. However 0.8 m is when the pedals are already removed. With the pedals still in place, the passage has a clear diameter of 0.685 m.https://ntrs.nasa.gov/citations/20110011626QuoteNote, the SCS guide petals can be manually removed after docking to increase the passageway clearance. Section 3.11.1 provides more information on petal removal capabilityQuote3.11.1 IVA TRANSFER CORRIDOR AND AIDSThe Block 0 NDS design has SCS docking alignment petals that are fixed and cannot fold back into a stowage position for mated operations. With the SCS petals fixed in the deployed position, the NDS assembly provides an IVA transfer corridor diameter of ~27 inches as shown in Figure 3.3.2-1. The deployed petal clearance of ~27 inches (685 mm) has been evaluated as suitable for IVA Crew and Cargo Transfer Bag/Locker transfer. After the NDS is hard mated and pressurized, the SCS petals can be manually removed by an IVA crewmember to enlarge the transfer corridor diameter up to ~32 inches. However, the SCS alignment petals must be re-installed prior to vehicle undocking.
Do the petals need to be there for undocking, or just need to be reinstalled for the next docking? Thing of emergency evacuation requirements.