Author Topic: PSLV-CA C55 - TeLEOS 2 / Lumelite-4 / POEM 2 - FLP - 22 April 2023 (08:50 UTC)  (Read 23024 times)

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #20 on: 04/22/2023 08:30 am »
First stage integration.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #21 on: 04/22/2023 08:31 am »
Payload integration.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #22 on: 04/22/2023 08:35 am »
T-15 minutes. Launch authorisation given.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Galactic Penguin SST

Note the launch time is reported on the LCC net as 14:20 IST = 08:50 UTC.
Astronomy & spaceflight geek penguin. In a relationship w/ Space Shuttle Discovery. Current Priority: Chasing the Chinese Spaceflight Wonder Egg & A Certain Chinese Mars Rover

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #24 on: 04/22/2023 08:39 am »
Crowd watching launch.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #25 on: 04/22/2023 08:40 am »
T-10 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #26 on: 04/22/2023 08:42 am »
T-8 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #27 on: 04/22/2023 08:44 am »
T-6 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #28 on: 04/22/2023 08:46 am »
T-4 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #29 on: 04/22/2023 08:47 am »
T-3 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #30 on: 04/22/2023 08:48 am »
T-2 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #31 on: 04/22/2023 08:49 am »
T-1 minute.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #32 on: 04/22/2023 08:50 am »
Liftoff!
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 47467
  • UK
    • Plan 28
  • Liked: 80355
  • Likes Given: 36343
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #33 on: 04/22/2023 08:51 am »
https://twitter.com/nasaspaceflight/status/1649697285704495109

Quote
ISRO's PSLV-C55 launches TeLEOS-2 and Lumelite-4 from the First Launch Pad (FLP) at the Satish Dhawan Space Centre (SDSC).

Overview:
nasaspaceflight.com/2023/04/isro-tů

Livestream:
youtube.com/watch?v=AeF7Opů

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #34 on: 04/22/2023 08:51 am »
T+1 minute.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 47467
  • UK
    • Plan 28
  • Liked: 80355
  • Likes Given: 36343
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #35 on: 04/22/2023 08:52 am »
Few more liftoff shots

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #36 on: 04/22/2023 08:52 am »
T+2 minutes. First stage separation.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #37 on: 04/22/2023 08:54 am »
T+3 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 38662
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 31838
  • Likes Given: 7825
Re: PSLV-CA C55 - TeLEOS 2 - FLP - 22 April 2023 (08:50 UTC)
« Reply #38 on: 04/22/2023 08:55 am »
Fairing separation.

T+4 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 47467
  • UK
    • Plan 28
  • Liked: 80355
  • Likes Given: 36343

Tags:
 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1