Re: GSLV F05, INSAT 3DR, SLP, September 8 2016
« Reply #20 on: 08/27/2016 08:39 am »
Planned launch time seems to be 11:22 UTC (04:52 pm IST)
http://www.andhrabhoomi.net/content/state-3945

Offline vyoma

  • Full Member
  • ****
  • Posts: 1878
  • India
  • Liked: 851
  • Likes Given: 124
Re: GSLV F05, INSAT 3DR, SLP, September 8 2016
« Reply #21 on: 08/27/2016 07:47 pm »
http://www.ndtv.com/india-news/isro-to-test-scramjet-engine-on-sunday-1451043

Quote
Earlier Mr Krishnan had said the Indian weather satellite will be launched on August 28 which has now been postponed to September 8.

Queried about the change in launch plan Krishnan said: "While carrying out the tests there was a technical issue found with a satellite component. It has been sorted out now and hence the delay."

He said the GSLV rocket that would carry the weather satellite INSAT-3DR is fully assembled.

The weather satellite will be mounted on to the rocket in three to four days.

Offline worldtimedate

  • Full Member
  • ****
  • Posts: 444
  • Liked: 40
  • Likes Given: 8
Re: GSLV F05, INSAT 3DR, SLP, September 8 2016
« Reply #22 on: 08/30/2016 07:37 pm »
Quote

THIRUVANANTHAPURAM: Buoyed by the success of the ISRO's Sramjet engine test on Sunday, Scientists of Vikram Sarabhai Space Centre (VSSC) and Liquid Propulsion Systems Centre (LPSC) have begun preparations for the launch of GSLV Mark II scheduled for Sep 8.

"Now, the preparations are on for the GSLV Mark II mission on Sept 8 for the launch of INSAT-3DR, an Indian satellite for weather forecast, search and rescue information. It will be the second flight using the indigenously developed cryogenic engine after it was successfully used for the first time to launch GSLV-D5 in 2014," VSSC director K Sivan told TOI.

The indigenous cryogenic engine to be used for GSLV Mark II on Sept 8 will be similar to the one used in GSLV-D5 launch two years back, the scientists said.


Source :
Preparations on for launch of GSLV Mark II

--- [ --- ]
« Last Edit: 08/30/2016 07:40 pm by worldtimedate »

Offline Ohsin

  • Full Member
  • ****
  • Posts: 1469
  • Liked: 1453
  • Likes Given: 2377
Re: GSLV F05, INSAT 3DR, SLP, September 8 2016
« Reply #23 on: 09/01/2016 06:22 pm »
Quote
Sep 01, 2016
GSLV-F05 / INSAT-3DR Mission is scheduled to be launched on Sept 08, 2016 at 16:10 hrs (IST) from SDSC, SHAR, Sriharikota
« Last Edit: 09/01/2016 06:28 pm by Ohsin »
"Well, three cheers to Sharma, but our real baby is INSAT."

Offline worldtimedate

  • Full Member
  • ****
  • Posts: 444
  • Liked: 40
  • Likes Given: 8
Re: GSLV F05, INSAT 3DR, SLP, September 8 2016
« Reply #24 on: 09/01/2016 07:43 pm »
There were conflicting reports in many newspapers about if INSAT 3DR is a 2061 Kg or 2200 Kg Satellite.
But all the misinformation is laid to rest by the ISRO Website INSAT 3DR page.

It is a 2211 Kg Satellite, an increase of odd 100 kg than the satellite launched by GSLV MK II last year.

[/quote]

INSAT-3DR has a lift-off mass of 2211 kg, which includes about 1255 kg of propellant. The propellant carried by INSAT-3DR is mainly required to raise the satellite from the Geosynchronous Transfer Orbit (GTO) to its final Geostationary Orbit and to maintain the satellite in its orbital slot during its life. INSAT-3DR is based on ISRO's two Tonne Class platform (I-2K bus) employing light-weight structural elements like Carbon Fibre Reinforced Plastic (CFRP). The satellite has a solar array generating 1700 Watts of power.

GSLV-F05 / INSAT-3DR Mission is scheduled to be launched on Sept 08, 2016 at 16:10 hrs (IST) from SDSC, SHAR, Sriharikota.

[/quote]

Source :
INSAT-3DR

--- [ --- ]

Offline Ohsin

  • Full Member
  • ****
  • Posts: 1469
  • Liked: 1453
  • Likes Given: 2377
Re: GSLV F05, INSAT 3DR, SLP, September 8, 2016 (10:40 UTC)
« Reply #25 on: 09/02/2016 08:18 am »
Brochure is out.
"Well, three cheers to Sharma, but our real baby is INSAT."

Offline Ohsin

  • Full Member
  • ****
  • Posts: 1469
  • Liked: 1453
  • Likes Given: 2377
Re: GSLV F05, INSAT 3DR, SLP, September 8, 2016 (10:40 UTC)
« Reply #26 on: 09/02/2016 11:49 am »
On its way  ;D
"Well, three cheers to Sharma, but our real baby is INSAT."

Offline isro-watch

  • Member
  • Full Member
  • ***
  • Posts: 336
  • Liked: 23
  • Likes Given: 5
Re: GSLV F05, INSAT 3DR, SLP, September 8, 2016 (10:40 UTC)
« Reply #27 on: 09/02/2016 12:57 pm »
Is there any specific reason why the GSLV is moved to the pad a full 5-6 days before the launch ?

Offline vineethgk

  • Full Member
  • ****
  • Posts: 892
  • India
  • Liked: 187
  • Likes Given: 262
Re: GSLV F05, INSAT 3DR, SLP, September 8, 2016 (10:40 UTC)
« Reply #28 on: 09/02/2016 01:19 pm »
Is there any specific reason why the GSLV is moved to the pad a full 5-6 days before the launch ?
Isn't that the usual time frame, approx?

EDIT: Feeling a bit jittery though, in light of the SpaceX incident yesterday.. Space is hard...
« Last Edit: 09/02/2016 01:24 pm by vineethgk »

Offline Stan Black

  • Senior Member
  • *****
  • Posts: 3132
  • Liked: 377
  • Likes Given: 230
Re: GSLV F05, INSAT 3DR, SLP, September 8, 2016 (10:40 UTC)
« Reply #29 on: 09/02/2016 07:01 pm »
On its way  ;D

I see it is pedestal I.

Offline kanaka

  • Member
  • Posts: 91
  • Liked: 4
  • Likes Given: 0
Re: GSLV F05, INSAT 3DR, SLP, September 8 2016
« Reply #30 on: 09/03/2016 02:00 am »
There were conflicting reports in many newspapers about if INSAT 3DR is a 2061 Kg or 2200 Kg Satellite.
But all the misinformation is laid to rest by the ISRO Website INSAT 3DR page.

It is a 2211 Kg Satellite, an increase of odd 100 kg than the satellite launched by GSLV MK II last year.


INSAT-3DR has a lift-off mass of 2211 kg, which includes about 1255 kg of propellant. The propellant carried by INSAT-3DR is mainly required to raise the satellite from the Geosynchronous Transfer Orbit (GTO) to its final Geostationary Orbit and to maintain the satellite in its orbital slot during its life. INSAT-3DR is based on ISRO's two Tonne Class platform (I-2K bus) employing light-weight structural elements like Carbon Fibre Reinforced Plastic (CFRP). The satellite has a solar array generating 1700 Watts of power.

GSLV-F05 / INSAT-3DR Mission is scheduled to be launched on Sept 08, 2016 at 16:10 hrs (IST) from SDSC, SHAR, Sriharikota.

[/quote]

Source :
INSAT-3DR

--- [ --- ]
[/quote]


India should think alternative ways of propelling the satellite so as to reduce flight mass. Japan has utilized eon propulsion system. Indian too can think of in such direction for cruising the bird on space.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 40101
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 34022
  • Likes Given: 11465
Re: GSLV F05, INSAT 3DR, SLP, September 8, 2016 (10:40 UTC)
« Reply #31 on: 09/03/2016 05:49 am »
GSAT 4 launched in 2010 had ion propulsion, but it failed to reach orbit. ISRO is working on using ion propulsion for its future satellites.

http://www.business-standard.com/article/technology/isro-to-use-electric-propulsion-on-satellites-to-carry-more-transponders-116011000356_1.html
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline vyoma

  • Full Member
  • ****
  • Posts: 1878
  • India
  • Liked: 851
  • Likes Given: 124
Re: GSLV F05, INSAT 3DR, SLP, September 8, 2016 (10:40 UTC)
« Reply #32 on: 09/03/2016 06:09 am »
Information about ISRO's ion thrusters can be found here: https://forum.nasaspaceflight.com/index.php?topic=33770.0

GSAT-19E would be having ion thrusters for satellite station keeping. It would be launched aboard LVM3-D1 by the end of this year.

Offline c.hazra200

  • Member
  • Posts: 8
  • Liked: 1
  • Likes Given: 0
Re: GSLV F05, INSAT 3DR, SLP, September 8, 2016 (10:40 UTC)
« Reply #33 on: 09/03/2016 01:48 pm »
There were conflicting reports in many newspapers about if INSAT 3DR is a 2061 Kg or 2200 Kg Satellite.
But all the misinformation is laid to rest by the ISRO Website INSAT 3DR page.

It is a 2211 Kg Satellite, an increase of odd 100 kg than the satellite launched by GSLV MK II last year.


It seems an increase of odd 100 kg payload capacity has an effect in vehicle's guidance error margin - targeted inclination of 20.61° for GSLV F5  Vs  19.3° inclination achieved by GSLV D5/GSAT-14 mission. If you see past GSLV missions you can clearly observe gradual increase of inclination with increase of vehicle's payload capacity .
« Last Edit: 09/03/2016 01:56 pm by c.hazra200 »

Offline sanjaykumar

  • Member
  • Posts: 97
  • USA
  • Liked: 21
  • Likes Given: 9
Re: GSLV F05, INSAT 3DR, SLP, September 8, 2016 (10:40 UTC)
« Reply #34 on: 09/05/2016 10:09 pm »
http://www.isro.gov.in/update/05-sep-2016/mission-readiness-review-mrr-committee-and-launch-authorization-board-lab-have


Mission Readiness Review (MRR) committee and Launch Authorization Board (LAB) have cleared the 29 hr countdown starting at 11.10 hr IST on Wednsday,September 7, 2016 and the launch of GSLV-F05/INSAT-3DR Mission for Thursday , September 8, 2016 at 16.10 hr

Offline input~2

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 6849
  • Liked: 1581
  • Likes Given: 568
Re: GSLV F05, INSAT 3DR, SLP, September 8, 2016 (10:40 UTC)
« Reply #35 on: 09/06/2016 02:55 am »
A1866/16 -  GSLV-F05 ROCKET LAUNCH FROM SHAR RANGE, SRIHARIKOTA WILL TAKE PLACE AS PER FLW DETAILS. THE LAUNCH WILL BE ON ANY ONE OF THE DAY DURING THIS PERIOD. ACTUAL DATE OF LAUNCH WILL BE INTIMATED 24HRS IN ADVANCE THROUGH A SEPERATE NOTAM. LAUNCH PAD COORD: 13 43.2 N   080 13.8 E NO FLT IS PERMITTED OVER THE DNG ZONE. A. DANGER ZONE -1 IS A CIRCLE OF 10NM AROUND THE LAUNCHER B. DANGER ZONE -2 IS A RECTANGULAR AREA BOUNDED BY: 1150N 08515E 1235N 08525E 1215N 08625E 1130N 08615E C. DANGER ZONE -3 IS A RECTANGULAR AREA BOUNDED BY: 1035N 08915E 1115N 08925E 1100N 09005E 1020N 08955E D. DANGER ZONE -4 IS A RECTANGULAR AREA BOUNDED BY: 0750N 09515E 0930N 09515E 0930N 09605E 0750N 09605E ROUTES AFFECTED IN CHENNAI FIR ARE: N571, P761, N877, W20, A465, P762, L510, P628, L645, Q10, Q11, Q23, Q24, V3, V4, V9 ? V11 CLOSURE/ALTERNATE ROUTINGS: 1)    N571 NOT AVBL BTN DORAM AND BIKEN ALTN ROUTE: DORAM-DCT-MMV VOR-DCT AVGIR-DCT BIKEN-N571 (BIDIRECTIONAL) 2)    P761 NOT AVBL MMV VOR AND PPB VOR ALTN ROUTE: MMV VOR- DCT- AVGIR-DCT-BIKEN-DCT- PT B 0943N 08935E - DCT- PPB VOR (BIDIRECTIONAL) 3)    N877 NOT AVBL BTN LAGOG AND ORARA ALTN ROUTE: LAGOG-DCT-POINT Z 1200N 08951E-DCT-ORARA (BIDIRECTIONAL) 4)    W20 NOT AVBL BTN MMV VOR AND BODEL //PART 1 OF 2 PARTS//. BTN 1000-1400, 08 SEP 10:00 2016 UNTIL 26 SEP 14:00 2016. CREATED: 02 SEP 09:37 2016

Offline seshagirib

  • Full Member
  • ***
  • Posts: 328
  • terra firma
  • Liked: 25
  • Likes Given: 39
Re: GSLV F05, INSAT 3DR, SLP, September 8, 2016 (10:40 UTC)
« Reply #36 on: 09/06/2016 07:04 am »
http://www.isro.gov.in/update/05-sep-2016/mission-readiness-review-mrr-committee-and-launch-authorization-board-lab-have


Mission Readiness Review (MRR) committee and Launch Authorization Board (LAB) have cleared the 29 hr countdown starting at 11.10 hr IST on Wednsday,September 7, 2016 and the launch of GSLV-F05/INSAT-3DR Mission for Thursday , September 8, 2016 at 16.10 hr

IIRC , PSLV coutdown = 48 hrs.

Count down of GSLV (~29 hrs ) << PSLV count down (~48 hrs).

Is this because the GSLV has one less stage ?
astronaut on space ship earth

Offline seshagirib

  • Full Member
  • ***
  • Posts: 328
  • terra firma
  • Liked: 25
  • Likes Given: 39
Re: GSLV F05, INSAT 3DR, SLP, September 8, 2016 (10:40 UTC)
« Reply #37 on: 09/07/2016 06:35 am »
http://www.isro.gov.in/update/07-sep-2016/29-hr-countdown-operation-of-gslv-f05-insat-3dr-mission-has-started-1110-hr-ist


Quote
Sep 07, 2016    The 29 hr countdown operation of GSLV-F05/INSAT-3DR Mission has started at 11:10 hr IST on Wednesday, September 7, 2016


« Last Edit: 09/07/2016 06:38 am by seshagirib »
astronaut on space ship earth

Offline sanjaykumar

  • Member
  • Posts: 97
  • USA
  • Liked: 21
  • Likes Given: 9
Re: GSLV F05, INSAT 3DR, SLP, September 8, 2016 (10:40 UTC)
« Reply #38 on: 09/07/2016 08:03 am »

http://www.isro.gov.in/update/07-sep-2016/preparations-second-stage-gs2-propellant-filling-operation-are-under-progress

Preparations for Second stage (GS2) propellant filling operation are under progress





Offline sanjaykumar

  • Member
  • Posts: 97
  • USA
  • Liked: 21
  • Likes Given: 9

Tags:
 

Advertisement NovaTech
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0