Author Topic: FAILURE: GSLV Mk II F10 - EOS-03 (aka GISAT-1) - SLP - 12 August 2021  (Read 59890 times)

Offline zubenelgenubi

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 8827
  • Arc to Arcturus, then Spike to Spica
  • Sometimes it feels like Trantor in the time of Hari Seldon
  • Liked: 5310
  • Likes Given: 47737
Re: GSLV Mk II F10 - EOS-03 (aka GISAT-1) - SLP - 18 April 2021
« Reply #80 on: 03/27/2021 03:14 pm »
The PMO intervened because pressure came from Washington.
What quotable evidence do you have to suggest this?
Support your local planetarium! (COVID-panic and forward: Now more than ever.)
My current avatar is saying "i wants to go uppies!"

Offline TheVarun

  • Full Member
  • **
  • Posts: 214
  • CANADA
  • Liked: 33
  • Likes Given: 145
Re: GSLV Mk II F10 - EOS-03 (aka GISAT-1) - SLP - 18 April 2021
« Reply #81 on: 04/09/2021 06:09 pm »
https://timesofindia.indiatimes.com/india/voltage-issue-further-delays-launch-of-gisat-1/articleshow/81993758.cms

Quote
“The satellite has some voltage fluctuation issue which is delaying the launch," one scientist in the know told TOI.


  Not very clear whether the launch is going to be delayed past April 18th. Possible.

« Last Edit: 04/10/2021 01:04 am by zubenelgenubi »

Offline zubenelgenubi

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 8827
  • Arc to Arcturus, then Spike to Spica
  • Sometimes it feels like Trantor in the time of Hari Seldon
  • Liked: 5310
  • Likes Given: 47737
More from:
https://timesofindia.indiatimes.com/india/voltage-issue-further-delays-launch-of-gisat-1/articleshow/81993758.cms
Quote
"We are working on the problem and the launch should happen in the last week of this month [April], or may even get pushed to May," a scientist said.
« Last Edit: 04/10/2021 01:11 am by zubenelgenubi »
Support your local planetarium! (COVID-panic and forward: Now more than ever.)
My current avatar is saying "i wants to go uppies!"

Offline input~2

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 6732
  • Liked: 1480
  • Likes Given: 554

Offline input~2

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 6732
  • Liked: 1480
  • Likes Given: 554

Offline chetan_chpd

  • Full Member
  • *
  • Posts: 154
  • Please visit: https://chetanaerospace.blogspot.com
  • Pune
  • Liked: 42
  • Likes Given: 38
Re: GSLV Mk II F10 - EOS-03 (aka GISAT-1) - SLP - May 2021
« Reply #85 on: 04/30/2021 07:16 am »
More delay to be expected for this launch due to the pandemic

https://react.etvbharat.com/telugu/andhra-pradesh/city/nellore/works-suspension-in-shar-due-to-corona-virus/ap20210427101859457

it seems that only ISRO is affected by COVID-19...all other space agencies/ companies are actually going faster than usual

 its really frustrating :'( :'( :'(
« Last Edit: 04/30/2021 07:22 am by chetan_chpd »

Offline K210

  • Full Member
  • ****
  • Posts: 582
  • Liked: 232
  • Likes Given: 18
Re: GSLV Mk II F10 - EOS-03 (aka GISAT-1) - SLP - May 2021
« Reply #86 on: 05/06/2021 01:16 pm »
Given recent covid outbreak and possible countrywide lockdown this launch is likely to be pushed back at least a month if not several
« Last Edit: 05/06/2021 01:16 pm by K210 »

Offline otter

  • Full Member
  • ****
  • Posts: 568
  • Belarus
  • Liked: 506
  • Likes Given: 41
Re: GSLV Mk II F10 - EOS-03 (aka GISAT-1) - SLP - May 2021
« Reply #87 on: 05/13/2021 06:46 am »
https://www.indiatvnews.com/news/india/geo-imaging-satellite-gisat1-launch-further-delayed-704095

India's Geo Imaging Satellite GISAT-1 launch further delayed
India TV News Desk | May 12, 2021 12:28 IST

Quote
/.../
Further, with the demand for oxygen shooting up from the hospitals to save Covid-19 patients, the Indian space agency's rocket may not be getting oxygen to power itself for some time to come thereby delaying its space missions.

The ISRO Propulsion Complex (IPRC) at Mahendragiri in Tamil Nadu is supplying oxygen to hospitals to save Covid-19 patients.

The satellite and the rocket (Geosynchronous Satellite Launch Vehicle - F10 (GSLV-F10) are ready at the rocket launch centre in Sriharikota.
/.../


Offline zubenelgenubi

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 8827
  • Arc to Arcturus, then Spike to Spica
  • Sometimes it feels like Trantor in the time of Hari Seldon
  • Liked: 5310
  • Likes Given: 47737
« Last Edit: 07/10/2021 04:57 pm by zubenelgenubi »
Support your local planetarium! (COVID-panic and forward: Now more than ever.)
My current avatar is saying "i wants to go uppies!"

Offline input~2

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 6732
  • Liked: 1480
  • Likes Given: 554
A1897/21 - GSLV-F10 ROCKET LAUNCH FM SHAR RANGE,SRIHARIKOTA WILL TAKE
PLACE AS PER FLW DETAILS.THE LAUNCH WILL BE ON ANY ONE
OF THE DAY DRG THIS PERIOD.ACTUAL DATE OF LAUNCH WILL BE
INTIMATED AT LEAST 24HR IN ADVANCE THRU A SEPARATE NOTAM.
LAUNCH PAD COORD:1343.2N08013.8E
NO FLT IS PERMITTED OVER THE DNG ZONES.
DNG ZONE-1:IS A CIRCLE OF 10NM AROUND THE LAUNCHER.
DNG ZONE-2:IS AN AREA BOUNDED BY FLW COORD:
1.1205N08450E 2.1250N08500E 3.1220N08620E 4.1135N08610E
DNG ZONE-3:IS AN AREA BOUNDED BY FLW COORD:
1.1055N08835E 2.1140N08845E 3.1105N09030E 4.1025N09020E
DNG ZONE-4:IS AN AREA BOUNDED BY FLW COORD:
1.0810N09510E 2.0935N09510E 3.0935N09605E 4.0810N09605E
ALL COORD ARE IN DEG AND MIN
ROUTES AFFECTED IN CHENNAI FIR
N571, P761, N877, P762, Q11, V9, V4, W20, Q23, Q24
CLOSURES/ALTN ROUTING FOR OVERFLYING
1.N571 NOT AVBL BTN IDASO-BIKEN
 ALTN:IDASO-DCT-1059N08520E-DCT-BIKEN
2.P761 NOT AVBL BTN IDASO-DUMAR
 ALTN:IDASO-DCT-1320N08450E-DUMAR
3.N877 NOT AVBL BTN DUMAR-LAGOG
 ALTN:MANPU-DUMAR-LEGIN-LAGOG
4.P762 NOT AVBL BTN XOKRO-PPB
 ALTN:ELSAR-DCT-0955N09021E-DCT-PPB
5.Q11 NOT AVBL BTN GURAS-MMV
 ALTN:GURAS-A465-MMV
6.W20/Q24 NOT AVBL BTN MMV-KAMGU
 ALTN:MMV-RAMDO-KAMGU
DEP FM CHENNAI MAY FPL AS FLW:
W20/Q24 NOT AVBL BTN MMV-KAMGU
 ALTN:MMV-DOHIA-MM610-RAMDO-KAMGU
ARR TO CHENNAI MAY FPL AS FLW:
1)Q11 NOT AVBL BTN GURAS-MMV
 ALTN:GURAS-A465-MMV
2)Q23 NOT AVBL BTN RINTO-MMV
 ALTN:ISPUL-GURAS-MMV
3)V9 NOT AVBL BTN GUNRI-MMV
 ALTN:GUNRI-GURAS-MMV
 4)V4 NOT AVBL BTN BOPRI-MMV
 ALTN:BOPRI-GURAS-MMV
FLW SID/STAR NOT AVBL:
SID NOT AVBL:DOHIA DEP FOR W20/Q24
STAR NOT AVBL:RUPKU ARR. GND - UNL

2200-0230, 11 AUG 22:00 2021
UNTIL 11 SEP 02:30 2021
. CREATED: 30 JUL 16:51 2021

Offline TheVarun

  • Full Member
  • **
  • Posts: 214
  • CANADA
  • Liked: 33
  • Likes Given: 145
 It's on the ISRO  website( August 12th launch)

https://www.isro.gov.in/launcher/gslv-f10-eos-03

Offline TheVarun

  • Full Member
  • **
  • Posts: 214
  • CANADA
  • Liked: 33
  • Likes Given: 145
^  And the brochure now comes up in the above link   https://www.isro.gov.in/gslv-f10-eos-03/gslv-f10-eos-03-brochure

Offline K210

  • Full Member
  • ****
  • Posts: 582
  • Liked: 232
  • Likes Given: 18
Screenshots of brochure + brochure pdf attached

Source: https://www.isro.gov.in/gslv-f10-eos-03/gslv-f10-eos-03-brochure


Offline K210

  • Full Member
  • ****
  • Posts: 582
  • Liked: 232
  • Likes Given: 18
Some tidbits about this launch:

Payload:

Name: GISAT-1 (EOS-3)
Mass: 2268kg
Orbit: 170km x ~36000km
Bus: I2K
Resolution: 50 metres in visible and infrared bands
Time from project start to launch: 9 years

Launch Vehicle:

Mission number: F10
Overall flight of GSLV: 14th
Flight of Mk-2 Variant: 8th
Current GTO capability: ~2.45 ton
Current LEO capablity: ~6 tons
Vehicle configuration: S139+4L40H (GS1) + L42 (GS2) + C15 (GS3)

4M ogive heatshield made out of lightweight composite materials will be flying for the first time in this mission. This will be needed for the launch of NISAR in 2023.
« Last Edit: 08/11/2021 03:03 pm by K210 »

Offline TheGazingHorizon

  • Member
  • Posts: 5
  • Liked: 4
  • Likes Given: 8
https://twitter.com/isro/status/1423623114244513796?s=20

First stage of GSLV-F10 on its Mobile launch pedestal.
« Last Edit: 08/11/2021 10:33 am by TheGazingHorizon »

Offline TheGazingHorizon

  • Member
  • Posts: 5
  • Liked: 4
  • Likes Given: 8
https://twitter.com/isro/status/1425039193839788037?s=20

First image: GSLV-F10 carrying EOS-03 on its way to the launch pad.

https://twitter.com/isro/status/1425224030135545857?s=20

Second image: GSLV-F10 on the second launch pad with night sky.
« Last Edit: 08/11/2021 10:33 am by TheGazingHorizon »

Offline TheGazingHorizon

  • Member
  • Posts: 5
  • Liked: 4
  • Likes Given: 8
ISRO twitter updates for propellants loading operations of GSLV-F10 at the second launch pad.

Filling of the oxidizer for the second stage (GS2) of GSLV-F10 completed
https://twitter.com/isro/status/1425262233718648833?s=20

Filling of propellant for the second stage (GS2) of GSLV-F10 completed.
https://twitter.com/isro/status/1425294788195020802?s=20

Filling of propellant for the liquid strap-ons (L40) of GSLV-F10 completed
https://twitter.com/isro/status/1425341658325872654?s=20

Filling of oxidizer for the liquid strap-ons (L40) of GSLV-F10 commenced
https://twitter.com/isro/status/1425399776657362947?s=20
« Last Edit: 08/11/2021 10:45 am by TheGazingHorizon »

Offline starbase

  • Full Member
  • ***
  • Posts: 336
  • Liked: 287
  • Likes Given: 83
Official Webcast:

bit.ly/SpaceLaunchCalendar ☆ bit.ly/SpaceEventCalendar

Offline William Graham

  • Senior Member
  • *****
  • Posts: 4182
  • Liked: 235
  • Likes Given: 109
T-1 minute

Tags:
 

Advertisement NovaTech
Advertisement SkyTale Software GmbH
Advertisement Northrop Grumman
Advertisement
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0