NASA update (April 23, 2020):

COMMENT |       EVENT        |       TIG        | ORB |   DV    |   HA    |   HP    |
COMMENT |                    |       GMT        |     |   M/S   |   KM    |   KM    |
COMMENT |                    |                  |     |  (F/S)  |  (NM)   |  (NM)   |
COMMENT =============================================================================
COMMENT
COMMENT  Crew-4 Launch         117:07:52:47.000             0.0     426.4     408.2
COMMENT                                                    (0.0)   (230.2)   (220.4)
COMMENT
COMMENT  Crew-4 Docking        118:01:30:00.000             0.0     426.5     407.8
COMMENT                                                    (0.0)   (230.3)   (220.2)
COMMENT
COMMENT  Crew-3_Undock         120:22:00:00.000             0.0     426.7     407.3
COMMENT                                                    (0.0)   (230.4)   (219.9)
COMMENT
COMMENT =============================================================================
---
SMS ;-). "Understanding a question is half an answer" by Socrates

Online Salo

  • Senior Member
  • *****
  • Posts: 12678
  • Odessa, Ukraine
  • Liked: 5113
  • Likes Given: 3989
Re: Schedule of ISS flight events (part 2)
« Reply #2821 on: 04/26/2022 06:38 pm »
https://www.nasa.gov/multimedia/nasatv/schedule.html#.V9B_0DXTt1o
Quote
Wednesday, April 27
12 a.m. – Coverage of the launch of NASA's SpaceX Crew-4 mission to the International Space Station (Lindgren, Hines, Watkins, Cristoforetti; launch scheduled at 3:52 a.m. EDT; coverage continues through docking at 8:15 p.m. EDT, and hatch opening at approximately 9:45 p.m. EDT) – Kennedy Space Center/Johnson Space Center/Hawthorne, Calif. (All Channels)
5:30 a.m. – NASA's SpaceX Crew-4 mission post-launch news conference (time subject to change) (All Channels)

Thursday, April 28
2:40 a.m. – Coverage of the Welcoming Remarks by NASA's SpaceX Crew-4 astronauts (Lindgren, Hines, Watkins and Cristoforetti) at the International Space Station (All Channels)

Online Salo

  • Senior Member
  • *****
  • Posts: 12678
  • Odessa, Ukraine
  • Liked: 5113
  • Likes Given: 3989
Re: Schedule of ISS flight events (part 2)
« Reply #2822 on: 04/26/2022 06:51 pm »
Completed ISS flight events
UTC time is used in table

2022
January 7 - removing STP-H8 experiment package from the SpaceX Dragon CRS-24 trunk for installation on the Japanese Kibo Exposed Facility by SSRMS and JEMRMS
January 10 - removing the ASIM payload from the Starboard Deck and install it at the Nadir Columbus platform by SSRMS and SPDM Dexter
January 11 - removing the STP-H7 external payload from the SpX-24 Dragon trunk and installing it at the Columbus Starboard Deck X-Axis (SDX) worksite by SSRMS
January 12  18:24:00 - ISS orbit's reboost by Progress MS-18 engines (dt=395.4 s, dV= +0.73 m/s, dH= +1.2 km)
January 19  12:17:31-19:28:56 - spacewalk (ISS Russian EVA-51) from MIM2 Poisk Module (cables connections between MLM-U Nauka and UM Prichal) [Shkaplerov, Dubrov]
January 23  15:40 - Dragon v2 (SpX-24) undocking (from Harmony PMA 3 / IDA 3)
January 24  20:18 / 21:05 - Dragon v2 (SpX-24) deorbit (dt=439 s) and splashdown
January 26  12:00 - release of satellites FEES 2 and ELaNa 38: GASPACS from #NRCSD22
January 26  12:10 - release of satellite ELaNa 38: PATCOOL from #NRCSD22
January 26  13:30 - release of satellite ELaNa 38: DAILI from #NRCSD22
January 26  13:40 - release of satellites ELaNa 38: TARGIT from #NRCSD22
February 3  08:55 - release of satellites Light-1 from J-SSOD#20
February 3  10:30 - release of satellites GT-1 from J-SSOD#20
February 8  07:56:00 - ISS orbit's reboost by Progress MS-18 engines (dt=142.3 s, dV= +0.26 m/s, dH= +0.45 km)
February 15  04:25:39.528 - Progress MS-19 (80P) launch
February 17  07:03:20 - Progress MS-19 (80P) docking (to MIM2 Poisk)
February 19  17:40:07.300 - Cygnus "S.S. Piers Sellers" (NG-17) launch
February 21  09:44 / 12:02 - Cygnus "S.S. Piers Sellers" (NG-17) capture and berthing (to Unity nadir) by SSRMS
February 26  01:22:00 - ISS orbit's reboost by Progress MS-18 engines (dt= 541.4 s, dV= +0.8 m/s, dH= +1.3 km)
March 11  19:35:00 - ISS orbit's reboost by Progress MS-18 engines (dt= 320.07 s, dV= +0.52 m/s, dH= +0.85 km)
March 15  12:12-19:06 - spacewalk (ISS U.S. EVA-79) from Quest airlock (iROSA 3A power channel prep) [Barron, Chari]
March 18  15:55:18.451 / 19:12:06 - Soyuz MS-21 "S.P. Korolev" (67S) launch and docking (to UM Prichal) [Exp 67: Artemyev, Matveev, Korsakov]
March 23  12:32-19:26 - spacewalk (ISS U.S. EVA-80) from Quest airlock (Radiator Beam Valve Modules Jumper) [Chari, Maurer]
March 24  09:00 - release of satellite IHI-Sat from J-SSOD#21
March 24  12:10 - release of satellite Kitsune from J-SSOD#21
March 30  07:21:03 - Soyuz MS-19 (65S) undocking (from MIM1 Rassvet) [Exp 66: Shkaplerov, Dubrov, Vande Hei]
March 30  10:34:13  / 11:02:09 - Soyuz MS-19 (65S) deorbit (dt= 279 s, dV= -128 m/s) and dividing on compartments [Exp 66: Shkaplerov, Dubrov, Vande Hei]
March 30  11:05:09 / 11:13:42 / 11:28:04 - Soyuz MS-19 (65S) reentered the atmosphere, main chute deploy and landing [Exp 66: Shkaplerov, Dubrov, Vande Hei]
April 8  15:17:12 - Crew Dragon Endeavour [C206 Flight #3] launch [AX-1: López-Alegría, Connor, Pathy, Stibbe]
April 9  12:29 - Crew Dragon Endeavour [C206 Flight #3] docking (to Harmony PMA 3 / IDA 3) [AX-1: López-Alegría, Connor, Pathy, Stibbe]
April 18  15:00-21:37 - spacewalk (ISS Russian EVA-52) (ERA preparation) [Artemyev, Matveev]
April 23  13:25 - predetermined Debris Avoidance Maneuvre by Progress MS-18 engines (dt= 623 s, dV= +1.0 m/s, dH= +1.8 km)
April 25  01:10 - Crew Dragon Endeavour [C206 Flight #3] undocking (from Harmony PMA 3 / IDA 3) [AX-1: López-Alegría, Connor, Pathy, Stibbe]
April 25  16:16 - Crew Dragon Endeavour [C206 Flight #3]  deorbit (dt=540 s, dV= -60 m/s)  [AX-1: López-Alegría, Connor, Pathy, Stibbe]
April 25  17:06 - Crew Dragon Endeavour [C206 Flight #3] splashdown [AX-1: López-Alegría, Connor, Pathy, Stibbe]
April 27  07:52:55 - Crew Dragon Freedom [C212 Flight #1] (Crew-4/USCV-4) launch [Exp 67/68: Lindgren, Hines, Cristoforetti, Watkins]
April 27  23:37:49 - Crew Dragon Freedom [C212 Flight #1] (Crew-4/USCV-4) docking (to Harmony PMA 3 / IDA 3) [Exp 67/68: Lindgren, Hines, Cristoforetti, Watkins]
April 28  14:58:34-22:41 - spacewalk (ISS Russian EVA-53) (ERA preparation) [Artemyev, Matveev]

Current schedule of ISS flight events
UTC time is used in table

2022
NET April 30  22:00:00 / TBD  May    4   5  05:05 - Crew Dragon Endurance [C210 Flight #1] (Crew-3/USCV-3) undocking (from Harmony PMA 2 / IDA 2) and splashdown [Exp 66: Chari, Marshburn, Barron, Maurer]
  NET   May    1   5   6  TBD / 04:37 - Crew Dragon Endurance [C210 Flight #1] (Crew-3/USCV-3) deorbit and splashdown
May    7   19 - spacewalk (ISS Russian EVA-54) (ERA testing) [Artemyev,    Cristoforetti    Matveev]
May    7   19 - release of satellites YuZGU-55 №5 (Radioscaf RS-10), YuZGU-55 №6 (Radioscaf RS-11), YuZGU-55 №7 (Radioscaf RS-12), YuZGU-55 №8 (Radioscaf RS-13), YuZGU-55 №9 (Radioscaf RS-14) during ISS Russian EVA-54
May 19  22:54:36 - CST-100 Starliner (Boe-OFT 2) un-crewed launch
May 20 - CST-100 Starliner (Boe-OFT 2) un-crewed docking (to Harmony PMA 2 / IDA 2)
NET May 24    25   - CST-100 Starliner (Boe-OFT 2) un-crewed undocking (from Harmony PMA 2 / IDA 2) (or May 28)
NET May 24    25   - CST-100 Starliner (Boe-OFT 2) un-crewed deorbit and landing (or May 28)
May - Cygnus "S.S. Piers Sellers" (NG-17) unberthing (from Unity nadir) and releasing by SSRMS
NET May - Cygnus "S.S. Piers Sellers" (NG-17) deorbit and reentered the atmosphere
June 1 - Progress MS-18 (79P) undocking (from Zvezda)
June 1 - Progress MS-18 (79P) deorbit and reentered the atmosphere
NET Early June - Crew Dragon Freedom [C212 Flight #1] (Crew-4/USCV-4) undocking (from Harmony PMA-3 / IDA 3) and docking (to Harmony PMA-2 / IDA 2) [Exp 67/68: Lindgren, Hines, Cristoforetti, Watkins]
June 3  09:33 - Progress MS-20 (81P) launch and docking (to Zvezda)
June 3  ~15:30 - Progress MS-20 (81P) docking (to Zvezda)
June 7  15:25 - Dragon v2 (SpX-25) launch [iROSA 3A, iROSA 4A in trunk]
June 8 - Dragon v2 (SpX-25) docking (to Harmony PMA 3 / IDA 3)
June 20    July   - spacewalk (ISS Russian EVA-55) [transfer of the airlock from Rassvet to MLM-U Nauka by the ERA] [Artemyev, Matveev] (or August-September)
NET June - release of satellites Binar-2, Binar-3, Binar-4
NET June - release of satellites ELaNa 45: ARKSat-1, BeaverCube, CapSat-1, CLICK A, D3, JAGSAT, petitSat
NET June - release of satellite IOD-3 AMBER (Canada) from Bishop
NET June - release of CSA's satellites from Bishop: Ex-Alta 2, ORCA2Sat, Manitoba SAT-1, CubeSat NB, Killick-1, AuroraSat, WU-NACCP, DUCS, NEUDOSE, ESSENCE, SpudNik-1, CHIRad-Sat, UdeSat, IDRSat, YukonSat
NET June - release of satellite TUMnanoSAT from J-SSOD
NET June - release of satellite STARS-Me2 from J-SSOD
NET Early July - Dragon v2 (SpX-25) undocking (from Harmony PMA 3 / IDA 3)
NET Early July - Dragon v2 (SpX-25) splashdown
July 15 - spacewalk (ISS Russian EVA-56) [transfer of the radiation heat exchanger from Rassvet to MLM-U Nauka  by the ERA] [Artemyev, Matveev] (or August-September)
July 17 - spacewalk (ISS Russian EVA-57) [installation and connection airlock and radiation heat exchanger on MLM-U Nauka] [Artemyev, Matveev] (or August-September)
August 10 - spacewalk (ISS Russian EVA-58) [mounting a platform fastening large-sized objects on MLM-U Nauka] [Artemyev, Matveev] (or September)
August 12    November   - spacewalk (ISS Russian EVA-59)  [Artemyev, Matveev]
NLT August 12    -September   - release of satellites YuZGU-55 №11 (Radioscaf RS-16), YuZGU-55 №12 (Radioscaf RS-17), Tsiolkovsky-Ryazan 1 и Tsiolkovsky-Ryazan 2 during ISS Russian EVA
August 15 - Cygnus (NG-18) launch
August 17 - Cygnus (NG-18) capture and berthing (to Unity nadir) by SSRMS
August - spacewalk (ISS U.S. EVA-81) from Quest airlock
August - spacewalk (ISS U.S. EVA-82) from Quest airlock
NET August - release of satellite PearlAfricaSat-1
September 1 - Crew Dragon (Crew-5/USCV-5) launch [Exp 68/69: Mann, Cassada, Kikina, Wakata]
September 2 - Crew Dragon (Crew-5/USCV-5) docking (to Harmony PMA 3 / IDA 3) [Exp 68/69: Mann, Cassada, Kikina, Wakata]
Early September - Crew Dragon Freedom [C212 Flight #1] (Crew-4/USCV-4) undocking (from Harmony PMA 2 / IDA 2) and splashdown [Exp 67/68: Lindgren, Hines, Cristoforetti, Watkins]
September 21  13:54 / ~17:25 - Soyuz MS-22 (68S) launch and docking (to MIM1 Rassvet) [Exp 68: Prokopyev, Petelin, Rubio]
September 30 - Soyuz MS-21 "S.P. Korolev" (67S) undocking (from UM Prichal) and landing [Exp 67: Artemyev, Matveev, Korsakov]
NET September - Crew Dragon (Crew-5/USCV-5) undocking (from Harmony PMA-3 / IDA 3) and docking (to Harmony PMA-2 / IDA 2) [Exp 68/69: Mann, Cassada, Kikina, Wakata]
NET H2 - HTV-X1 launch
NET H2 - HTV-X1 capture and berthing (to Harmony nadir) by SSRMS
NET H2 - HTV-X1 unberthing (from Harmony nadir) and releasing by SSRMS
NET H2 - HTV-X1 deorbit and reentered the atmosphere
Q4 - release of satellites Binar-5, Binar-6, Binar-7
October 26  00:19 - Progress MS-21 (82P) launch
October 28 - Progress MS-21 (82P)  docking (to ISS)
October - Dragon v2 (SpX-26) launch [iROSA 1A, iROSA 3B in trunk]
October - Dragon v2 (SpX-26) docking (to Harmony PMA 3 / IDA 3)
NET October - Cygnus (NG-18) unberthing (from Unity nadir) and releasing by SSRMS
NET October - Cygnus (NG-18) deorbit and reentered the atmosphere
November 23 - Progress MS-20 (81P) undocking (from Zvezda)
NET November 23 - Progress MS-20 (81P) deorbit and reentered the atmosphere
November - Dragon v2 (SpX-26) undocking (from Harmony PMA 3 / IDA 3)
November - Dragon v2 (SpX-26) splashdown
November - spacewalk (ISS U.S. EVA-83) from Quest airlock
November - spacewalk (ISS U.S. EVA-84) from Quest airlock
  H2   Late - CST-100 Starliner (Boe-CFT) launch [Wilmore, Fincke]
  H2   Late - CST-100 Starliner (Boe-CFT) docking (to Harmony PMA 3 / IDA 3) [Wilmore, Fincke]
  H2   Late - CST-100 Starliner (Boe-CFT) crewed undocking (from Harmony PMA 3 / IDA 3) and landing [Wilmore, Fincke]
TBD - release of satellites Alpha, ARKSAT-1, BeaverCube, CaNOP, EagleSat-2, Stratus from Bishop
TBD - release of satellites Surya Satellite-1 (SS-1) (Indonesia), love satellite, Dream Sat 01, TUMnanoSAT from J-SSOD
TBD - release of satellite LORIS (Canada)
TBD - release of satellites Fly Your Satellite! 2: EIRSAT-1, UoS3
TBD - release of satellites MR-SAT (M-SAT 1, Nanosat 8A), MRS-SAT (M-SAT 1, Nanosat 8B) (USA) from SSIKLOPS
TBD - release of satellites Iskra-5, ТNS-0 №3, SamSat-QB50, SamSat-M, SamSat-1, FEFU university sat, SiriusSat-3, Parus-MGTU during ISS Russian EVA

2023
January 10 - Dragon v2 (SpX-27) launch
January 11 - Dragon v2 (SpX-27)  docking (to Harmony PMA 3 / IDA 3)
NET Early - Crew Dragon launch [AX-2: Whitson, Shoffner, Cruise, Liman] (or NLT Spring)
NET Early - Crew Dragon docking (to Harmony PMA 2 / IDA 2) [AX-2: Whitson, Shoffner, Cruise, Liman] (or NLT Spring 2023)
NET Early - Crew Dragon undocking (from Harmony PMA 2 / IDA 2) and landing / splashdown [AX-2: Whitson, Shoffner, Cruise, Liman] (or NLT Spring 2023)
NET Early February - Dragon v2 (SpX-27) undocking (from Harmony PMA 3 / IDA 3)
NET Early February - Dragon v2 (SpX-27) splashdown
NET February 20 - Progress MS-19 (80P) undocking (from MIM2 Poisk)
NET February 20 - Progress MS-19 (80P) deorbit and reentered the atmosphere
February - Progress MS-22 (83P) launch and docking (to Zvezda)
February    April    - Cygnus (NG-19) launch
February    April   - Cygnus (NG-19) capture and berthing (to Unity nadir) by SSRMS
NET    Early   February - Dream Chaser Cargo System (SS-1) launch (or April)
NET    Early   February - Dream Chaser Cargo System  (SS-1) capture and berthing (to Harmony nadir) by SSRMS (or April)
NET March 20 - Soyuz MS-23 (69S) launch and docking (to UM Prichal) [Exp 69: Kononenko, Chub, Fediaev]
March 28 - Soyuz MS-22 (68S) undocking (from MIM1 Rassvet) and landing [Exp 68: Prokopyev, Petelin, Rubio]
March - Crew Dragon (Crew-5/USCV-5) undocking (from Harmony PMA 2 / IDA 2) and docking (to Harmony PMA 3 / IDA 3) [Exp 68/69: Mann, Cassada, Kikina, Wakata]
March - Crew Dragon (Crew-6/USCV-6) launch and docking (to Harmony PMA 2 / IDA 2) [Exp 69/70: Bowen, Hoburg, Furukawa, cosmonaut]
NET March - Crew Dragon (Crew-5/USCV-5) undocking (from Harmony PMA 3 / IDA 3) and landing [Exp 68/69: Mann, Cassada, Kikina, Wakata]
NET    Early   March - Dream Chaser Cargo System (SS-1) unberthing (from Harmony nadir) and releasing by SSRMS (or May)
NET    Early   March - Dream Chaser Cargo System (SS-1) deorbit and landing on LLF (or May)
NET H1 - Crew Dragon launch [AX-3]
NET H1 - Crew Dragon docking (to Harmony PMA 3 / IDA 3) [AX-3]
NET H1 - Crew Dragon undocking (from Harmony PMA 3 / IDA 3) and splashdown [AX-3]
April - Crew Dragon (Crew-6/USCV-6) undocking (from Harmony PMA 2 / IDA 2) and docking (to Harmony PMA 3 / IDA 3) [Exp 69/70: Bowen, Hoburg, astronaut  Furukawa, cosmonaut]
NET April    June   - Cygnus (NG-19) unberthing (from Unity nadir) and releasing by SSRMS
NET April    June   - Cygnus (NG-19) deorbit and reentered the atmosphere
NET April - HTV-X2 launch
NET April - HTV-X2 capture and berthing (to Harmony nadir) by SSRMS
June 5 - Dragon v2 (SpX-28) launch
June 6 - Dragon v2 (SpX-28)  docking (to Harmony PMA 3 / IDA 3)
June 30 - Progress MS-21 (82P) undocking (from ISS)
NET June 30 - Progress MS-21 (82P) deorbit and reentered the atmosphere
NET June - HTV-X2 unberthing (from Harmony nadir) and releasing by SSRMS
NET June - HTV-X2 deorbit and reentered the atmosphere
NET Early July - Dragon v2 (SpX-28) undocking (from Harmony PMA 3 / IDA 3)
NET Early July - Dragon v2 (SpX-28) splashdown
NET July - Progress MS-23 (84P) launch and docking (to ISS)
NET August - Progress MS-22 (83P) undocking (from Zvezda)
NET August - Progress MS-22 (83P) deorbit and reentered the atmosphere
Late September - Soyuz MS-24 (70S) launch and docking (to MIM1 Rassvet) [Exp 70: Skvortsov, Platonov, Borisov]
September - CST-100 Starliner-1 (Crew-1/USCV-7) launch and docking (to Harmony PMA 2 / IDA 2) [astronaut NASA, astronaut NASA, cosmonaut, astronaut]
September - Crew Dragon (Crew-6/USCV-6) undocking (from Harmony PMA 3 / IDA 3) and landing [Exp 69/70: Bowen, Hoburg, Furukawa, cosmonaut]
September - CST-100 Starliner-1  (Crew-1/USCV-7) undocking (from Harmony PMA 2 / IDA 2) and docking (to Harmony PMA 3 / IDA 3) [astronaut NASA, astronaut NASA, cosmonaut, astronaut]
H2 - Cygnus (NG-20) launch
H2 - Cygnus (NG-20) capture and berthing (to Unity nadir) by SSRMS
H2 - Cygnus (NG-20) unberthing (from Unity nadir) and releasing by SSRMS
H2 - Cygnus (NG-20) deorbit and reentered the atmosphere
NET H2 - Crew Dragon launch [AX-4]
NET H2 - Crew Dragon docking (to Harmony PMA 2 / IDA 2) [AX-4]
NET H2 - Crew Dragon undocking (from Harmony PMA 2 / IDA 2) and landing / splashdown [AX-4]
Early October - Soyuz MS-23 (69S) undocking (from UM Prichal) and landing [Exp 69: Kononenko, Chub, Fediaev]
October 20 - Dragon v2 (SpX-29) launch
October 21 - Dragon v2 (SpX-29)  docking (to Harmony PMA 3 / IDA 3)
NET Late November - Dragon v2 (SpX-29) undocking (from Harmony PMA 3 / IDA 3)
NET Late November - Dragon v2 (SpX-29) splashdown
Late - Soyuz MS-25 (71S) launch and docking (to UM Prichal) [TBD, TBD, TBD]
Late - spacewalk (ISS Russian EVA) [cosmonaut RF, space tourist]
Late - Soyuz MS-25 (71S) undocking (from UM Prichal) and landing [TBD, TBD, TBD]
TBD - Dream Chaser Cargo System (SS-2) launch (or 2024)
TBD - Dream Chaser Cargo System (SS-2) capture and berthing (to Harmony nadir) by SSRMS (or 2024)
TBD - Dream Chaser Cargo System (SS-2) unberthing (from Harmony nadir) and releasing by SSRMS (or 2024)
TBD - Dream Chaser Cargo System (SS-2) deorbit and landing on LLF (or 2024)

2024
NET January - Progress MS-23 (84P) undocking (from ISS)
NET January - Progress MS-23 (84P) deorbit and reentered the atmosphere
March - Crew Dragon (Crew-7/USCV-8) launch and docking (to Harmony PMA 2 / IDA 2) [astronaut, astronaut, astronaut, Hansen]
March - CST-100 Starliner-1 (Crew-1/USCV-7) undocking (from Harmony PMA 3 / IDA 3) and landing [astronaut NASA, astronaut NASA, cosmonaut, astronaut]
NET Mid-March - Soyuz MS-26 (72S) launch and docking (to UM Prichal) [Exp 71: Ovchinin, Mikaev, Grebyonkin]
NET Late March - Soyuz MS-24 (70S) undocking (from MIM1 Rassvet) and landing [Exp 70: Skvortsov, Platonov, Borisov]
April - Cygnus (NG-21) launch
April - Cygnus (NG-21) capture and berthing (to Unity nadir) by SSRMS
NET April - Crew Dragon (Crew-7/USCV-8) undocking (from Harmony PMA 2 / IDA 2) and docking (to Harmony PMA 3 / IDA 3) [astronaut, astronaut, astronaut, Hansen]
NET June - Cygnus (NG-21) unberthing (from Unity nadir) and releasing by SSRMS
NET June - Cygnus (NG-21) deorbit and reentered the atmosphere
NET Late September - Soyuz MS-27 (73S) launch and docking (to MIM1 Rassvet) [Exp 72: Ryzhikov, Zubritsky, Gorbunov]
H2 - Cygnus (NG-22) launch
H2 - Cygnus (NG-22) capture and berthing (to Unity nadir) by SSRMS
H2 - Cygnus (NG-22) unberthing (from Unity nadir) and releasing by SSRMS
H2 - Cygnus (NG-22) deorbit and reentered the atmosphere
NET Early October - Soyuz MS-26 (72S) undocking (from UM Prichal) and landing [Exp 71: Ovchinin, Mikaev, Grebyonkin]
October - Crew Dragon (Crew-7/USCV-8) undocking (from Harmony PMA 3 / IDA 3) and landing [astronaut, astronaut, astronaut, Hansen]
TBD - Dream Chaser Cargo System (SS-3) launch
TBD - Dream Chaser Cargo System (SS-3) capture and berthing (to Harmony nadir) by SSRMS
TBD - Dream Chaser Cargo System (SS-3) unberthing (from Harmony nadir) and releasing by SSRMS
TBD - Dream Chaser Cargo System (SS-3) deorbit and landing on LLF

2025
NET Late March - Soyuz MS-27 (73S) undocking (from MIM1 Rassvet) and landing [Exp 72: Ryzhikov, Zubritsky, Gorbunov]

Acronyms:
ASIM         - Atmosphere-Space Interaction Monitor
AX-#         - Axiom space mission to  ISS
J-SSOD      - JEM Small Satellite Orbital Deployer
LLF           - Launch and Landing Facility on Merritt Island, Florida
MLM-U      - Multipurpose Laboratory Module - Upgrade
NEM         - Science and Power Module
NRCSD      - Nanoracks CubeSat Deployer
PCM         - Post-Certification Mission (Boeing)
SSIKLOPS  - Space Station Integrated Kinetic Launcher for Orbital Payload Systems
UM           - Node Module
USCV        - US Crew Vehicle

Changes on April 26th
Changes on April 27th
Changes on April 28th
Changes on April 29th
Changes on May 2nd
Changes on May 3rd
Changes on May 4th
« Last Edit: 11/20/2022 05:03 pm by Salo »

Offline vp.

  • Full Member
  • *
  • Posts: 193
  • France
  • Liked: 62
  • Likes Given: 7
Re: Schedule of ISS flight events (part 2)
« Reply #2823 on: 04/26/2022 07:15 pm »
NET May 1 - Crew Dragon Endurance [C210 Flight #1] (Crew-3/USCV-3) deorbit and splashdown
NASA announced that the rotation should last 5 days.

Offline Conexion Espacial

  • Senior Member
  • *****
  • Posts: 2081
  • Liked: 3168
  • Likes Given: 2275
Re: Schedule of ISS flight events (part 2)
« Reply #2824 on: 04/27/2022 01:53 am »
NET May 1 - Crew Dragon Endurance [C210 Flight #1] (Crew-3/USCV-3) deorbit and splashdown
NASA announced that the rotation should last 5 days.
Via: SpaceFlightNow

Quote

The flight plan calls for handover of at least five days between the new Crew-4 astronauts and the outgoing Crew-3 astronauts, who are tentatively scheduled to depart the station around May 4, targeting a splashdown off the coast of Florida around May 5, wrapping up their nearly six-month mission.
« Last Edit: 04/27/2022 02:12 am by zubenelgenubi »
I publish information in Spanish about space and rockets.
www.x.com/conexionspacial

Online Salo

  • Senior Member
  • *****
  • Posts: 12678
  • Odessa, Ukraine
  • Liked: 5113
  • Likes Given: 3989

Online Salo

  • Senior Member
  • *****
  • Posts: 12678
  • Odessa, Ukraine
  • Liked: 5113
  • Likes Given: 3989
Re: Schedule of ISS flight events (part 2)
« Reply #2826 on: 04/27/2022 05:05 am »
https://www.nasa.gov/content/upcoming-elana-cubesat-launches
Quote
ELaNa 45
9 Cubesat Missions Scheduled to be deployed

    BeaverCube – Massachusetts Institute of Technology, Cambridge, Mass.
    CapSat-1 – The Weiss School, Palm Beach Gardens, Fla.
    CLICK A – NASA’s Ames Research Center, Mountain View, Calif.
    D3 – Embry-Riddle Aeronautical University, Daytona Beach, Fla.
    JAGSAT – University of South Alabama, Mobile, Ala.

Offline Conexion Espacial

  • Senior Member
  • *****
  • Posts: 2081
  • Liked: 3168
  • Likes Given: 2275
Re: Schedule of ISS flight events (part 2)
« Reply #2827 on: 04/27/2022 01:29 pm »
May 20 - CST-100 Starliner (Boe-OFT 2) un-crewed docking (to Harmony PMA 2 / IDA 2)
May 25 - CST-100 Starliner (Boe-OFT 2) un-crewed undocking (from Harmony PMA 2 / IDA 2)
May 25 - CST-100 Starliner (Boe-OFT 2) un-crewed deorbit and landing
https://twitter.com/jeff_foust/status/1519255307087720448
I publish information in Spanish about space and rockets.
www.x.com/conexionspacial

Online Salo

  • Senior Member
  • *****
  • Posts: 12678
  • Odessa, Ukraine
  • Liked: 5113
  • Likes Given: 3989
Re: Schedule of ISS flight events (part 2)
« Reply #2828 on: 04/27/2022 01:32 pm »
https://twitter.com/cbs_spacenews/status/1519223067993468928?cxt=HHwWgMCj5ZjVrpUqAAAA
Quote
William Harwood @cbs_spacenews
F9/Crew-4: LIFTOFF! At 3:52:55am EDT (0752 UTC)

Offline zubenelgenubi

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 12416
  • Arc to Arcturus, then Spike to Spica
  • Sometimes it feels like Trantor in the time of Hari Seldon
  • Liked: 8337
  • Likes Given: 82164
Re: Schedule of ISS flight events (part 2)
« Reply #2829 on: 04/28/2022 12:27 am »
Crew-4 docking at 23:37:49 UTC
Corrected minutes.
« Last Edit: 04/28/2022 01:57 pm by zubenelgenubi »
Support your local planetarium! (COVID-panic and forward: Now more than ever.) My current avatar is saying "i wants to go uppies!" Yes, there are God-given rights. Do you wish to gainsay the Declaration of Independence?

Offline centaurinasa

  • Senior Member
  • *****
  • Posts: 12403
  • CETI Alpha V
  • Liked: 8846
  • Likes Given: 5416
Re: Schedule of ISS flight events (part 2)
« Reply #2830 on: 04/28/2022 01:29 am »
ISS configuration after Crew 4 arrival.
To boldly go where no human has gone before !

Online Salo

  • Senior Member
  • *****
  • Posts: 12678
  • Odessa, Ukraine
  • Liked: 5113
  • Likes Given: 3989

Online Salo

  • Senior Member
  • *****
  • Posts: 12678
  • Odessa, Ukraine
  • Liked: 5113
  • Likes Given: 3989
Re: Schedule of ISS flight events (part 2)
« Reply #2832 on: 04/28/2022 03:56 pm »
http://www.launchphotography.com/Launch_Viewing_Guide.html
Quote
And a Falcon 9 from pad 39A will launch the CRS-25 resupply mission to the ISS on June 7 around 11:15am EDT.

Online Salo

  • Senior Member
  • *****
  • Posts: 12678
  • Odessa, Ukraine
  • Liked: 5113
  • Likes Given: 3989
Re: Schedule of ISS flight events (part 2)
« Reply #2833 on: 05/02/2022 10:36 am »
https://twitter.com/KathyLueders/status/1520886571976830980?cxt=HHwWiMC5pe-Ro5sqAAAA
Quote
Kathy Lueders @KathyLueders
During a planning call Sunday, Mission Control in Houston told @Space_Station
 astronauts that #Crew3 continues to target undocking from station NET 5:05pm ET Wed, May 4. We’ll continue to monitor weather & adjust the return as needed for a safe crew recovery after splashdown.

Online Salo

  • Senior Member
  • *****
  • Posts: 12678
  • Odessa, Ukraine
  • Liked: 5113
  • Likes Given: 3989
Re: Schedule of ISS flight events (part 2)
« Reply #2834 on: 05/02/2022 11:18 am »
https://tass.ru/kosmos/14530107
Google translate:
Quote
MOSCOW, May 1. /TASS/. Russian cosmonauts will go out into outer space five times this summer, according to the Russian Space magazine (the official publication of Roscosmos).

According to the material, extravehicular activities under the Russian program will take place on June 20, July 15 and 17, and August 10 and 12. It is expected that in July and August, cosmonauts Oleg Artemyev, who is also a TASS special correspondent in orbit, and Denis Matveev will go into outer space. Who will perform extravehicular activity in June is not indicated in the materials.

In total, seven spacewalks are planned for the duration of the expedition of Artemiev, Matveev and his colleague Sergei Korsakov. There have been two so far. Korsakov has no extravehicular activity planned, despite this, he is ready for such work. In addition, he was trained to work with the ERA manipulator.

Online Salo

  • Senior Member
  • *****
  • Posts: 12678
  • Odessa, Ukraine
  • Liked: 5113
  • Likes Given: 3989
Re: Schedule of ISS flight events (part 2)
« Reply #2835 on: 05/02/2022 07:06 pm »
https://spacenews.com/first-dream-chaser-vehicle-takes-shape/
Quote
“Then we ship it to the Kennedy Space Center for integration onto the Vulcan rocket,” he said, with a launch tentatively planned for February. However, Kavandi said in her remarks at the AIAA conference that the launch was planned “about a year from now.”

That launch will be the first in a series of cargo missions to the International Space Station under a NASA Commercial Resupply Services 2 contract awarded in 2016. Sierra Space is looking beyond cargo missions and is starting work on a crewed version of Dream Chaser that could launch as soon as 2026.

Online Salo

  • Senior Member
  • *****
  • Posts: 12678
  • Odessa, Ukraine
  • Liked: 5113
  • Likes Given: 3989
Re: Schedule of ISS flight events (part 2)
« Reply #2836 on: 05/03/2022 09:22 pm »
https://twitter.com/KathyLueders/status/1521550540597075969?cxt=HHwWgoC9gfeJ0Z0qAAAA
Quote
Kathy Lueders @KathyLueders
Teams from @NASA & @SpaceX now are targeting #Crew3 undocking at 1:05am Thurs, May 5 from @Space_Station. Splashdown off of Florida’s coast is planned about 12:37am Fri, May 6. The new undocking time allows for shorter phasing & more time to review the latest forecast info.

Online Salo

  • Senior Member
  • *****
  • Posts: 12678
  • Odessa, Ukraine
  • Liked: 5113
  • Likes Given: 3989

Offline Joachim

  • Full Member
  • ****
  • Posts: 583
  • Mainz, Germany
    • SPACEFACTS
  • Liked: 479
  • Likes Given: 525
Re: Schedule of ISS flight events (part 2)
« Reply #2838 on: 05/04/2022 11:30 am »
Are you sure with
" NET   May    1   5   6  16:37 - Crew Dragon Endurance [C210 Flight #1] (Crew-3/USCV-3) deorbit and splashdown"

If I calculate correct 12:37AM EDT is 04:47 UTC

Offline SMS

  • Regular
  • Senior Member
  • *****
  • Posts: 3243
    • Astronauts & their spaceflights
  • Liked: 2201
  • Likes Given: 249
Re: Schedule of ISS flight events (part 2)
« Reply #2839 on: 05/04/2022 03:19 pm »
Are you sure with
" NET   May    1   5   6  16:37 - Crew Dragon Endurance [C210 Flight #1] (Crew-3/USCV-3) deorbit and splashdown"

If I calculate correct 12:37AM EDT is 04:47 UTC

Correct is 04:37 UTC.
---
SMS ;-). "Understanding a question is half an answer" by Socrates

Tags:
 

Advertisement NovaTech
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0