Hmm....zero updates from ISRO at T-5 days? This is a first for them since a few years ago....
Now the satellite has to be dismounted from the Polar Satellite Launch Vehicle-27 rocket and moved back to its testing location where it will be rectified.
"We are planning to launch the satellite by the end of this month. The replacement transmitter is getting ready and will be brought from our centre in Bangalore," M.Y.S. Prasad, director, Satish Dhawan Space Centre (SDSC), told IANS
Do we know what the window is for the 15th? Around 13:00 UTC I'm guessing?
The Indian space agency is hoping to mate the country's fourth regional navigation satellite around March 19, after replacing a faulty transmitter on Monday, said a senior official."The new transmitter is expected to be fixed in the satellite and tested. Then the fully assembled satellite will be mated with the rocket," M.Y.S. Prasad, director of Satish Dhawan Space Centre (SDSC) told IANS over phone.The transmitter from Isro Satellite Centre, located in Bangalore and that is part of Indian Space Research Organisation (Isro), reached SDSC on Sunday.After mating the satellite with the rocket, a full system check would be carried out and then the rocket launch date would be fixed.
http://gadgets.ndtv.com/science/news/isros-fourth-navigation-satellite-to-be-mated-with-rocket-this-week-670964QuoteThe Indian space agency is hoping to mate the country's fourth regional navigation satellite around March 19, after replacing a faulty transmitter on Monday, said a senior official."The new transmitter is expected to be fixed in the satellite and tested. Then the fully assembled satellite will be mated with the rocket," M.Y.S. Prasad, director of Satish Dhawan Space Centre (SDSC) told IANS over phone.The transmitter from Isro Satellite Centre, located in Bangalore and that is part of Indian Space Research Organisation (Isro), reached SDSC on Sunday.After mating the satellite with the rocket, a full system check would be carried out and then the rocket launch date would be fixed.
IRNSS-1D to fly on March 28The rescheduled navigation satellite IRNSS-1D will now be launched on March 28, ISRO Chairman A.S. Kirankumar said on Monday.
"The rocket - Polar Satellite Launch Vehicle-PSLV-XL - has been moved to the launch pad or the umbilical tower. The rocket will be fixed to the umbilical tower,"
The 59 and half hour count-down of PSLV-C27/IRNSS-1D Mission has started at 05:49 hr IST on Thursday, March 26, 2015
26-03-2015PSLV-C27/IRNSS-1D Mission Update:- Mono Methyl Hydrazine (MMH) propellant filling operation of fourth stage (PS4) of PSLV-C27 has commenced at 09:40 hr (IST)- Mono Methyl Hydrazine (MMH) propellant filling operation of fourth stage (PS4) of PSLV-C27 has been completed. Preparations for Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation are under progress.- Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of Fourth Stage (PS4) of PSLV-C27 has commenced at 16:15 hr (IST)- Mixed Oxides of Nitrogen (MON-3) oxidiser filling operation of Fourth Stage (PS4) of PSLV-C27 has been completed by 19:00 hr (IST)