Author Topic: SLS : Artemis I UPDATES: Kennedy LC-39B : 16 November 2022 (06:47 UTC)  (Read 420905 times)

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31046
  • UK
    • Plan 28
  • Liked: 55541
  • Likes Given: 25081
https://twitter.com/nasagroundsys/status/1558403270770556928

Quote
Teams are conducting the last integrated test before @NASA_SLS & @NASA_Orion roll out to Launch Pad 39B next week for the launch of the Artemis I flight test. This week, teams began the second part of the flight termination system (FTS) test.
MORE: go.nasa.gov/3AmiC5T

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31046
  • UK
    • Plan 28
  • Liked: 55541
  • Likes Given: 25081
https://twitter.com/nasagroundsys/status/1558493922288144385

Quote
Teams have completed the final flight termination system (FTS) test for Artemis I with @NASA_SLS and @NASA_Orion in the Vehicle Assembly Building at @NASAKennedy.
We are ready. We are going. 🚀

Offline Chris Bergin

« Last Edit: 08/15/2022 06:55 pm by zubenelgenubi »
Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31046
  • UK
    • Plan 28
  • Liked: 55541
  • Likes Given: 25081
https://twitter.com/nasa_marshall/status/1559226551232757766

Quote
#Artemis I's @NASA_SLS rocket is ready to roll! 🚀

Teams at @NASAKennedy finished the final testing and checkouts of the Moon rocket. They are targeting August 16 for rollout to Launch Pad 39B ahead of a targeted August 29 launch.

Learn more HERE>> go.nasa.gov/3bXoOYC

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31046
  • UK
    • Plan 28
  • Liked: 55541
  • Likes Given: 25081

Offline TJL

  • Extreme Veteran
  • Full Member
  • ****
  • Posts: 1306
  • Liked: 81
  • Likes Given: 111
Was wondering...why does Artemis only need 2 weeks on the pad prior to launch whereas Saturn 5 was on the pad approximately 2 to 3 months prior to launch? Thank you.

Offline Jim

  • Night Gator
  • Senior Member
  • *****
  • Posts: 36050
  • Cape Canaveral Spaceport
  • Liked: 18546
  • Likes Given: 398
Was wondering...why does Artemis only need 2 weeks on the pad prior to launch whereas Saturn 5 was on the pad approximately 2 to 3 months prior to launch? Thank you.

Skylab only needed a month on the pad.  It was the Apollo Spacecraft that needed servicing at the pad.  Orion is serviced offline

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31046
  • UK
    • Plan 28
  • Liked: 55541
  • Likes Given: 25081
https://twitter.com/nasagroundsys/status/1559320197294686209

Quote
Charlie Blackwell-Thompson, @NASA's Artemis I Launch Director, has officially given the 'go' to proceed with roll to the pad.
Tomorrow, teams will roll @NASA_SLS and @NASA_Orion to Launch Pad 39B where Charlie will oversee the launch on Aug. 29.

Offline nzguy

  • Full Member
  • *
  • Posts: 175
  • Liked: 154
  • Likes Given: 1
Re: Artemis 1 Discussion Thread
« Reply #48 on: 08/16/2022 12:43 am »
Someone was asking about the cubesat deployment timeline (now I can't find the original post), but I notice on Twitter a graphic was posted that appears to show the timeline:
https://twitter.com/NASA_SLS/status/1559283769126830080

Offline su27k

  • Senior Member
  • *****
  • Posts: 6061
  • Liked: 8625
  • Likes Given: 839
Stowaways on NASA’s massive Moon rocket promise big science in small packages

Quote from: Science
The investigators who built those satellites have more than the usual launch jitters: Half of them may not have enough power to begin their missions. Stuck within the rocket for more than a year because of launch delays, their batteries have drained to a level where some may be unable to boot up and unfurl their solar panels. “The longer we wait, the higher the risk,” says Ben Malphrus of Morehead State University, principal investigator for Lunar IceCube, one of the CubeSats with power concerns.

<snip>

BioSentinel, NEA Scout, and three other CubeSats were allowed to recharge their batteries during their long wait aboard the SLS. But five others were out of luck, including both LunaH Map and Lunar IceCube. Some could not be recharged without removing them from the rocket; in other cases NASA engineers feared the process might spark discharges that could harm the rest of the rocket. “We have to be very cognizant of the risk to the primary mission when we interface with these CubeSats,” says Jacob Bleacher, NASA’s chief exploration scientist.

Also Jeff Foust said this is known for a few months but nobody wants to talk about it, not a good look for a public program which is supposed to be more transparent than private programs:

https://twitter.com/jeff_foust/status/1559293949096992770

Offline Khadgars

  • Full Member
  • ****
  • Posts: 1721
  • Orange County, California
  • Liked: 1101
  • Likes Given: 3027
Evil triumphs when good men do nothing - Thomas Jefferson

Offline nzguy

  • Full Member
  • *
  • Posts: 175
  • Liked: 154
  • Likes Given: 1

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31046
  • UK
    • Plan 28
  • Liked: 55541
  • Likes Given: 25081

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31046
  • UK
    • Plan 28
  • Liked: 55541
  • Likes Given: 25081
https://twitter.com/nasagroundsys/status/1559670944053985284

Quote
All platforms in High Bay 3 have been retracted. SLS and Orion are ready for their roll to Launch Pad 39B for the launch of #Artemis I. The live stream from the NASA Kennedy newsroom is now available, here:

« Last Edit: 08/16/2022 10:40 pm by FutureSpaceTourist »

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31046
  • UK
    • Plan 28
  • Liked: 55541
  • Likes Given: 25081
https://twitter.com/nextspaceflight/status/1559708493002641410

Quote
Rollout is now no earlier than 10 pm Eastern [02:00 UTC], per NASA.

Lightning may potentially move too close to rollout path, waiting for weather to move on.
« Last Edit: 08/17/2022 01:31 am by zubenelgenubi »

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31046
  • UK
    • Plan 28
  • Liked: 55541
  • Likes Given: 25081
NSF now live

Offline Chris Bergin

Support NSF via L2 -- Help improve NSF -- Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31046
  • UK
    • Plan 28
  • Liked: 55541
  • Likes Given: 25081
https://twitter.com/spacecoast_stve/status/1559724875274768384

Quote
First motion, and our first glimpse of SLS as it exits the VAB for the final time before launch!

The NSF crew is live now and answering your questions about the #Artemis1 mission!

👉 youtu.be/hBRt1MOEUys

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31046
  • UK
    • Plan 28
  • Liked: 55541
  • Likes Given: 25081
https://twitter.com/nasakennedy/status/1559726936829706242

Quote
🤩🚀🤩

Edit to add:

https://twitter.com/nasagroundsys/status/1559732970574979074

Quote
The @NASA_SLS rocket and @NASA_Orion spacecraft have now cleared the Vehicle Assembly Building.
Photos: NASA/Chad Siwik
« Last Edit: 08/17/2022 02:52 am by FutureSpaceTourist »

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 31046
  • UK
    • Plan 28
  • Liked: 55541
  • Likes Given: 25081
https://twitter.com/nasaspaceflight/status/1559733422897102850

Quote
The CAA is on the move, following the departure from the VAB.
youtube.com/watch?v=hBRt1M…

Tags:
 

Advertisement NovaTech
Advertisement SkyTale Software GmbH
Advertisement Northrop Grumman
Advertisement
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0