Author Topic: All Static Firing of the Space Shuttle - Flight Readiness Firing  (Read 1513 times)

Online catdlr

  • She will always be part of me.
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 27813
  • Enthusiast since the Redstone and Thunderbirds
  • Marina del Rey, California, USA
  • Liked: 22840
  • Likes Given: 13500
Every Flight Readiness Firing of the Space Shuttle

Quote
Mar 8, 2019
During the Space Shuttle program, the Flight Readiness Firing (FRF) tests were primarily done to test all three of the Space Shuttle Orbiter's RS-25 main engines by igniting them and letting them run until the Shuttle's onboard computers detects an error in the main engine system, which will force an Redundant Set Launch Sequencer (RSLS) Abort in order to shutdown all 3 engines.

There has only been 7 FRF tests that are known. The majority of the Shuttle FRF tests were performed prior to the maiden voyage of each Shuttle orbiter, except for STS-26, which was the Return-to-Flight mission after the Challenger Disaster.

These tests were also performed at the John C. Stennis Space Center in Hancock County, Mississippi.



« Last Edit: 12/01/2025 04:18 am by catdlr »
PSA #3:  Paywall? View this video on how-to temporary Disable Java-Script: youtu.be/KvBv16tw-UM
A golden rule from Chris B:  "focus on what is being said, not disparage people who say it."

Tags:
 

Advertisement NovaTech
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1