Launch has been delayed 2 weeks for technical reason.New launch date is end of June.(source: local press in Telugu)
June 01, 2013 Polar Satellite Launch Vehicle (PSLV-C22) flight delayed by a fortnightIRNSS-1A, the first Indian Navigation Satellite, was scheduled for launch onboard PSLV-C22 on June 12, 2013 at 01:01 hrs. from Satish Dhawan Space Centre, Sriharikota. IRNSS-1A Satellite has gone through all electrical checks and is ready for propellant filling. The PSLV-C22 vehicle was fully integrated and was undergoing electrical checks.During the electrical checks of the launch vehicle, an anomaly was observed in one of the electro-hydraulic control actuators in the second stage. It has been decided to replace this actuator.The replacement of the control actuator needs two weeks of activity at the Launch Pad and the Vehicle Assembly Area. Accordingly, the launch of PSLV-C22/IRNSS-1A is delayed by a fortnight with respect to the original scheduled date of June 12, 2013.
Confirmation of the delay by ISROQuoteJune 01, 2013 Polar Satellite Launch Vehicle (PSLV-C22) flight delayed by a fortnightIRNSS-1A, the first Indian Navigation Satellite, was scheduled for launch onboard PSLV-C22 on June 12, 2013 at 01:01 hrs. from Satish Dhawan Space Centre, Sriharikota. IRNSS-1A Satellite has gone through all electrical checks and is ready for propellant filling. The PSLV-C22 vehicle was fully integrated and was undergoing electrical checks.During the electrical checks of the launch vehicle, an anomaly was observed in one of the electro-hydraulic control actuators in the second stage. It has been decided to replace this actuator.The replacement of the control actuator needs two weeks of activity at the Launch Pad and the Vehicle Assembly Area. Accordingly, the launch of PSLV-C22/IRNSS-1A is delayed by a fortnight with respect to the original scheduled date of June 12, 2013.http://www.isro.org/pressrelease/scripts/pressreleasein.aspx?Jun01_2013
Now we're told "June end or the first week of July" for this launch(source)
Quote from: input~2 on 06/06/2013 12:06 pmNow we're told "June end or the first week of July" for this launch(source)Will this manifest a further delay?
A1218/13 [...] - PSLV-C22 ROCKET LAUNCH FM SHAR RANGE, SRIHARIKOTA WILL TAKEPLACE AS PER FLW DETAILS. THE LAUNCH WILL BE ON ANY ONE OF THE DAYDUR THIS PERIOD. ACTUAL DATE OF LAUNCH WILL BE INTIMATED 24 HRIN ADVANCE THRU A SEPARATE NOTAM. LAUNCH PAD COORD: 1343.9N 08014.2ENO FLT IS PERMITTED OVER THE DNG ZONE.I. DNG ZONE-1 A CIRCLE OF 10NM AROUND THE LAUNCHER II. DNG ZONE-2 A RECTANGULAR AREA BOUNDED BY: 1345N 08045E 1330N 08040E 1320N 08125E 1335N 08130EIII. DNG ZONE-3 A RECTANGULAR AREA BOUNDED BY: 1335N 08210E 1305N 08205E 1240N 08400E 1310N 08405E IV. DNG ZONE-4 A RECTANGULAR AREA BOUNDED BY: 1300N 08425E 1230N 08420E 1220N 08505E 1250N 08510EV. DNG ZONE-5 A RECTANGULAR AREA BOUNDED BY 1205N 08835E 1125N 08825E 1110N 08925E 1150N 08935EVI. DNG ZONE-6 A RECTANGULAR AREA BOUNDED BY 1100N 09430E 0900N 09430E 0900N 09540E 1100N 09540EVII. DNG ZONE-7 A RECTANGULAR AREA BOUNDED BY 1700S 13300W 1900S 13300W 1000S 09200W 0800S 09300WROUTES AFFECTED IN CHENNAI FIR P761 W20 A465 N571 N877 V003 V004 V009 V010AND L518CLOSURE/ALTN RTE:1. P761 NOT AVBL MMV VOR AND PPB VORALTN RTE : MMV VOR-P574-GIRNA-DCT-BIKEN-P762-PPB VOR ?BIDIRECTIONAL?2. W20 NOT AVBL BTN MMV VOR AND BODELALTN ROUTE: MMV VOR-TR319/139DEG- 53NM-TTP VOR-TR357/177 DEG--81NM- BODEL //PART 1 OF 2 PARTS//. 1600-2030 DLY, 01 JUL 16:00 2013 UNTIL 27 JUL 20:302013. CREATED: 17 JUN 14:56 2013