Author Topic: Maļa Space - ArianeGroup reusable launcher (2026)  (Read 21576 times)

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 31563
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 19773
  • Likes Given: 3273
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #60 on: 08/06/2022 05:30 am »
From the tweet.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online FutureSpaceTourist

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 27676
  • UK
    • Plan 28
  • Liked: 51453
  • Likes Given: 22069
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #61 on: 09/17/2022 07:03 am »
https://twitter.com/andrewparsonson/status/1571031216949788674

Quote
Small update from MaiaSpace: Maia will be capable of carrying 1,500 kg payloads to orbit in an expendable configuration. This is reduced by two-thirds to just 500 kg when it's being recovered. This shows the huge payload tax that's required for recovering these small vehicles.

Online libra

  • Full Member
  • ****
  • Posts: 1778
  • Liked: 1155
  • Likes Given: 2289
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #62 on: 09/18/2022 11:39 am »
French PM Elizabeth Borne spoke at IAC: France will pour 9 billion euros into its space program(s) - ESA and CNES - within the next three years.

Offline john smith 19

  • Senior Member
  • *****
  • Posts: 9746
  • Everyplaceelse
  • Liked: 2246
  • Likes Given: 12567
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #63 on: 09/18/2022 12:44 pm »
Orbex just filed for a launch license actually, so any hope of "winning" seems fruitless. I mean, unless we're not counting the UK as Europe, which is honestly fair post-Brexit.
You do know that both Israel and Canada are members of ESA, right?
MCT ITS BFR SS. The worlds first Methane fueled FFSC engined CFRP SS structure A380 sized aerospaceplane tail sitter capable of Earth & Mars atmospheric flight.First flight to Mars by end of 2022. Forward looking statements. T&C apply. "Extraordinary claims require extraordinary proof" R. Simberg."Competitve" means cheaper ¬cheap

Offline john smith 19

  • Senior Member
  • *****
  • Posts: 9746
  • Everyplaceelse
  • Liked: 2246
  • Likes Given: 12567
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #64 on: 09/18/2022 12:47 pm »
It seems that Maia will be a small branch of Arianespace (not sure TBH, could be Airbus space group) organized like a "startup" to get Maia off the ground faster and more efficiently that the usual cumbersome ESA and CNES and space ministries process.

Macron is particularly obsessed with the startup model, those days...

The gist of the idea is clearly to go "full startup mode" to move things faster.
So French.  Do what America did a decade ago.

If they were to consider a wider definition of "European" (as ESA does).
<sigh>   :( :(
MCT ITS BFR SS. The worlds first Methane fueled FFSC engined CFRP SS structure A380 sized aerospaceplane tail sitter capable of Earth & Mars atmospheric flight.First flight to Mars by end of 2022. Forward looking statements. T&C apply. "Extraordinary claims require extraordinary proof" R. Simberg."Competitve" means cheaper ¬cheap

Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #65 on: 09/18/2022 08:09 pm »
Orbex just filed for a launch license actually, so any hope of "winning" seems fruitless. I mean, unless we're not counting the UK as Europe, which is honestly fair post-Brexit.
You do know that both Israel and Canada are members of ESA, right?
Yes, but you'll note I was responding to a post about "the competitive threat from other European mini-launchers". Regardless of their status in the ESA, I wouldn't call a Canadian or Israeli launcher a "European mini-launchers", and seriously doubt they'd be competitive within the EU (without a major advantage like reusability).
« Last Edit: 09/18/2022 08:15 pm by JEF_300 »
Wait, ∆V? This site will accept the ∆ symbol? How many times have I written out the word "delta" for no reason?

Offline hektor

  • Senior Member
  • *****
  • Posts: 2383
  • Liked: 966
  • Likes Given: 38
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #66 on: 09/18/2022 09:46 pm »
Canada is a Cooperating State within ESA, not a member state. Israel has a cooperation agreement with ESA but is not a member state of ESA.
« Last Edit: 09/18/2022 09:48 pm by hektor »

Offline hektor

  • Senior Member
  • *****
  • Posts: 2383
  • Liked: 966
  • Likes Given: 38
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #67 on: 09/18/2022 09:53 pm »
It is far more difficult, performance wise, to do a small reusable launcher - even a partially reusable one - than a bigger one ; so they are really going after something difficult. But obviously they did not want to make Ariane 6 irrelevant by making a partially reusable launcher of comparable performance.
« Last Edit: 09/18/2022 09:54 pm by hektor »

Online Robotbeat

  • Senior Member
  • *****
  • Posts: 35723
  • Minnesota
  • Liked: 19887
  • Likes Given: 10366
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #68 on: 09/19/2022 05:04 pm »
It is far more difficult, performance wise, to do a small reusable launcher - even a partially reusable one - than a bigger one ; so they are really going after something difficult. But obviously they did not want to make Ariane 6 irrelevant by making a partially reusable launcher of comparable performance.
I don’t necessarily agree. Small may be difficult for financial reasons, but it’s not significantly harder technically and in fact opens up the trade space to things like helicopter recovery ala Electron.
Chris  Whoever loves correction loves knowledge, but he who hates reproof is stupid.

To the maximum extent practicable, the Federal Government shall plan missions to accommodate the space transportation services capabilities of United States commercial providers. US law http://goo.gl/YZYNt0

Online Try_NBS

  • Member
  • Posts: 24
  • Go ESA
  • Liked: 10
  • Likes Given: 17
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #69 on: 09/21/2022 05:56 am »
Don't forget Maia is just the beginning of ArianeGroup reusable launchers. As we can see on this video.



Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 31563
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 19773
  • Likes Given: 3273
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #70 on: 09/22/2022 06:19 am »
From left to right. I think only the Heavy Launcher is worth developing. The smaller payloads launched by the Mini and Medium can be carried by the Heavy with RTLS to reduce costs. Instead of Very Heavy, orbital refilling should be used to increase performance above that of Heavy.

Mini Launcher - 3 Prometheus engines on first stage, lightweight second stage.

Medium Launcher - 5 Prometheus engines on first stage, 1 Prometheus engine on second stage.

Heavy Launcher - 9 Prometheus engines on first stage, 1 Prometheus engine on second stage.

Very Heavy Launcher - Heavy Launcher with two Mini Launcher boosters.

Crewed Launcher - Heavy Launcher with SUSIE.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online TrevorMonty

Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #71 on: 09/22/2022 09:19 am »
From left to right. I think only the Heavy Launcher is worth developing. The smaller payloads launched by the Mini and Medium can be carried by the Heavy with RTLS to reduce costs. Instead of Very Heavy, orbital refilling should be used to increase performance above that of Heavy.

Mini Launcher - 3 Prometheus engines on first stage, lightweight second stage.

Medium Launcher - 5 Prometheus engines on first stage, 1 Prometheus engine on second stage.

Heavy Launcher - 9 Prometheus engines on first stage, 1 Prometheus engine on second stage.

Very Heavy Launcher - Heavy Launcher with two Mini Launcher boosters.

Crewed Launcher - Heavy Launcher with SUSIE.
I'd leave small LV market to european startups and concentrate on f9 equivalent plus heavy version ie FH equivalent and use that to supply fuel depot. Side boosters RTLS and core downrange on a barge.

Online Try_NBS

  • Member
  • Posts: 24
  • Go ESA
  • Liked: 10
  • Likes Given: 17
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #72 on: 09/22/2022 09:23 am »
I think we must to know the capacities of the different launchers before saying anyone has no use.

Offline woods170

  • IRAS fan
  • Senior Member
  • *****
  • Posts: 11330
  • IRAS fan
  • The Netherlands
  • Liked: 15003
  • Likes Given: 9204
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #73 on: 09/22/2022 12:03 pm »
French PM Elizabeth Borne spoke at IAC: France will pour 9 billion euros into its space program(s) - ESA and CNES - within the next three years.

This is a 25% increase over current budgets. Quite substantial.

Offline baldusi

  • Senior Member
  • *****
  • Posts: 8333
  • Buenos Aires, Argentina
  • Liked: 2506
  • Likes Given: 7965
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #74 on: 09/22/2022 01:58 pm »
Now that RocketLabs has switched Archimedes to an 890kN ORSC methalox with a launch target of 2024, will ESA insist on gas generator Prometheus? It would look like SpaceX, Blue, ULA and RocketLabs are doing reusable staged combustion methalox. RFA is also doing SC, albeit in kerolox. Getting reusability right needs lots of extra delta-v. And if they don't pull a Merlin-like efficiency out of gas generator, they will be in quite a bit of trouble.

Online Try_NBS

  • Member
  • Posts: 24
  • Go ESA
  • Liked: 10
  • Likes Given: 17
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #75 on: 09/22/2022 06:16 pm »
We will see soon if all is ok with Prometheus. Yes, it's the first european methalox engine. But the conception of the motor is slow, and we know the expertise of the european industrials. They will do all what they can do to build a reliable engine.

Offline Alpha_Centauri

  • Full Member
  • ****
  • Posts: 758
  • England
  • Liked: 334
  • Likes Given: 156
Re: Maļa Space - ArianeGroup reusable launcher (2026)
« Reply #76 on: 09/23/2022 11:45 am »
Now that RocketLabs has switched Archimedes to an 890kN ORSC methalox with a launch target of 2024, will ESA insist on gas generator Prometheus? It would look like SpaceX, Blue, ULA and RocketLabs are doing reusable staged combustion methalox. RFA is also doing SC, albeit in kerolox. Getting reusability right needs lots of extra delta-v. And if they don't pull a Merlin-like efficiency out of gas generator, they will be in quite a bit of trouble.

The emphasis of the Prometheus project is reducing manufacturing cost, and hence per unit price.

In Europe there is scepticism that the portion of the international launch market that is available is sufficient for engine reuse to be financially viable. So they are hedging their bets by producing an engine that is cheap enough to use expendibly if required.

Making Prometheus staged combustion would significantly raise the per unit cost.
« Last Edit: 09/24/2022 07:16 am by Alpha_Centauri »

Tags:
 

Advertisement NovaTech
Advertisement SkyTale Software GmbH
Advertisement Northrop Grumman
Advertisement
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
1