Author Topic: NASA HSF: Integration Approach Presents Challenges to Oversight and Independence  (Read 847 times)

Offline woods170

  • IRAS fan
  • Senior Member
  • *****
  • Posts: 7361
  • IRAS fan
  • The Netherlands
  • Liked: 3084
  • Likes Given: 904
New GAO report is out which is critical of certain aspects of how NASA manages the SLS and Orion programs:

https://www.gao.gov/assets/690/687842.pdf

Quote from: GAO
The approach has dual-hatted positions, with individuals in two programmatic engineering and safety roles also performing oversight of those areas. As the image below shows, this presents an environment of competing interests. These dual roles subject the technical authorities to cost and schedule pressures that potentially impair their independence. The Columbia Accident Investigation Board found in 2003 that this type of tenuous balance between programmatic and technical pressures was a contributing factor to that Space Shuttle accident.

Image: GAO

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13160
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2901
  • Likes Given: 435
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.