LIVE: STS-133 Flight Day 7 - EVA-2

Pages: 1 ... 23 24 [25] 26 27 ... 30 Next
Author Topic: LIVE: STS-133 Flight Day 7 - EVA-2  (Read 38015 times)
Space Pete
NASASpaceflight ISS Editor
Global Moderator
*****
Offline

Posts: 6631
Location: UK


Mr. ISS


« Reply #360 on: 03/02/2011 09:30 PM »

Anyone wondering why they're removing the Strela adapter from PMA-3?

Perhaps they're considering returning PMA-3 to Earth (on STS-135)! ;)
Ronsmytheiii
Moderator
Global Moderator
*****
Offline

Posts: 21594



« Reply #361 on: 03/02/2011 09:31 PM »

Ronsmytheiii
Moderator
Global Moderator
*****
Offline

Posts: 21594



« Reply #362 on: 03/02/2011 09:32 PM »

Good tug test on the Strela adapter, looks like it is installed.

Steve going to grab his bag and then head back
sts1canada
Full Member
*****
Offline

Posts: 2448


« Reply #363 on: 03/02/2011 09:32 PM »

ISS KU & comm dropouts through TDRS-West are due to station blockage, soon will switch over to East only comm.

The complex will pass over Baja California in 5 minutes moving NE, the adapter plate is locked in place.

Richard
Ronsmytheiii
Moderator
Global Moderator
*****
Offline

Posts: 21594



« Reply #364 on: 03/02/2011 09:34 PM »

aL doing inventory

Steve working his way off PMA-1
Ronsmytheiii
Moderator
Global Moderator
*****
Offline

Posts: 21594



« Reply #365 on: 03/02/2011 09:36 PM »

Steve is back on the airlock, but going to the CETA cart to get a bag
sts1canada
Full Member
*****
Offline

Posts: 2448


« Reply #366 on: 03/02/2011 09:36 PM »

Al is performing a tool check at the air lock, and Steve will soon join him at the air lock, this EVA is starting to come to a close, the port CETA cart cleanup tasks (ie. adjusting brake handles) will wait for a future EVA.

17 minutes to sunset, 10 minutes to East only comm.

Richard

Ronsmytheiii
Moderator
Global Moderator
*****
Offline

Posts: 21594



« Reply #367 on: 03/02/2011 09:39 PM »

Steve has grabbed the egt ahead bag on the CETA cart, going back to the airlock
sts1canada
Full Member
*****
Offline

Posts: 2448


« Reply #368 on: 03/02/2011 09:40 PM »

Complex is passing NE over Colorado, Al is in the airlock, Steve is about to join him. 13 minutes to sunset, 6 minutes to East comm.

PET almost 6:00

Richard
Ronsmytheiii
Moderator
Global Moderator
*****
Offline

Posts: 21594



« Reply #369 on: 03/02/2011 09:41 PM »

Steve now at the airlock, handing bags to Al
Ronsmytheiii
Moderator
Global Moderator
*****
Offline

Posts: 21594



« Reply #370 on: 03/02/2011 09:42 PM »

AFter good inventory, Steve is ingressing the crew lock
Ronsmytheiii
Moderator
Global Moderator
*****
Offline

Posts: 21594



« Reply #371 on: 03/02/2011 09:44 PM »

Steve is now in the airlock, thermal cover is closed, plugging in SCU's
sts1canada
Full Member
*****
Offline

Posts: 2448


« Reply #372 on: 03/02/2011 09:45 PM »

Thank you to everyone for your EVA and STS-133 mission coverage here on NSF!

I have enjoyed providing the sun and comm times for these two EVAs and I hope to do the same for the 4 EVAs on STS-134 (if the launch date does not slip too much). See you guys & girls later, I going back to lurker mode here on NSF! Take care!

Richard
Ronsmytheiii
Moderator
Global Moderator
*****
Offline

Posts: 21594



« Reply #373 on: 03/02/2011 09:47 PM »

taking water to off, 2 minutes till hatch closure
Ronsmytheiii
Moderator
Global Moderator
*****
Offline

Posts: 21594



« Reply #374 on: 03/02/2011 09:49 PM »

Steve is closing the hatch
Tags:
Pages: 1 ... 23 24 [25] 26 27 ... 30 Next
 

Powered by MySQL Powered by PHP Powered by SMF 2.0 Beta 3.1 Public | SMF © 2006–2008, Simple Machines LLC
All content © 2005-2011 NASASpaceFlight.com
Valid XHTML 1.0! Valid CSS!
Page created in 0.055 seconds with 22 queries.