LIVE: STS-120 EVA-5 updates

Pages: [1] 2 3 ... 8 Next  All
Author Topic: LIVE: STS-120 EVA-5 updates  (Read 11952 times)
DaveS
Shuttle program observer
Full Member
*****
Offline

Posts: 6011
Location: Sweden


« on: 11/09/2007 09:53 AM »

NASA TV coverage have started. Running welll ahead of schedule, crew lock depressurization started and they have been given a GO to open the hatch.
Advertisement
« on: 11/09/2007 09:53 AM »

 
DaveS
Shuttle program observer
Full Member
*****
Offline

Posts: 6011
Location: Sweden


« Reply #1 on: 11/09/2007 09:56 AM »

EVA start at 4:54 am EST.
DaveS
Shuttle program observer
Full Member
*****
Offline

Posts: 6011
Location: Sweden


« Reply #2 on: 11/09/2007 10:05 AM »

GO for airlock egress.
DaveS
Shuttle program observer
Full Member
*****
Offline

Posts: 6011
Location: Sweden


« Reply #3 on: 11/09/2007 10:14 AM »

Right configuring tethers and equipment for the EVA tasks.
joshcryer
Member
Full Member
**
Offline

Posts: 39


« Reply #4 on: 11/09/2007 10:14 AM »

*waves* had to find where this discussion was going on. :)
John44
Elite Veteran
Full Member
*****
Offline

Posts: 2156
Location: Netherlands


WWW
« Reply #5 on: 11/09/2007 10:15 AM »

EXPEDITION 16 - Overview EVA 9 November
http://www.space-multimedia.nl.eu.org/index.php?option=com_content&task=view&id=3030&Itemid=2
DaveS
Shuttle program observer
Full Member
*****
Offline

Posts: 6011
Location: Sweden


« Reply #6 on: 11/09/2007 10:16 AM »

Right now translating towards the first worksite on PMA-2 to disconnect the SSPTS cables.
DaveS
Shuttle program observer
Full Member
*****
Offline

Posts: 6011
Location: Sweden


« Reply #7 on: 11/09/2007 10:19 AM »

And both EVs are wearing the overgloves that was first used on STS-120.
dsmillman
Member
Full Member
*****
Offline

Posts: 549


« Reply #8 on: 11/09/2007 10:22 AM »

To follow this EVA get the EVA checklist from:

http://www.nasa.gov/centers/johnson/news/flightdatafiles/index.html

EVA 5 covers most of the activities.  PDGF wiring and RPCM R&R are in EVA 2.
DaveS
Shuttle program observer
Full Member
*****
Offline

Posts: 6011
Location: Sweden


« Reply #9 on: 11/09/2007 10:23 AM »

WIF foot restraint being installed:
DaveS
Shuttle program observer
Full Member
*****
Offline

Posts: 6011
Location: Sweden


« Reply #10 on: 11/09/2007 10:25 AM »

PMA-2 can be seen in the top of this image.
DaveS
Shuttle program observer
Full Member
*****
Offline

Posts: 6011
Location: Sweden


« Reply #11 on: 11/09/2007 10:28 AM »

SSPTS cable inhibits in place. GO to demate the first SSPTS cable on PMA-2.
DaveS
Shuttle program observer
Full Member
*****
Offline

Posts: 6011
Location: Sweden


« Reply #12 on: 11/09/2007 10:33 AM »

Malenchenko demating a SSPTS cable:
DaveS
Shuttle program observer
Full Member
*****
Offline

Posts: 6011
Location: Sweden


« Reply #13 on: 11/09/2007 10:42 AM »

Malenchenko performing a glove check. All good!
DaveS
Shuttle program observer
Full Member
*****
Offline

Posts: 6011
Location: Sweden


« Reply #14 on: 11/09/2007 10:45 AM »

Malenchenko is now disconnecting some umbilical cables between the Lab and the PMA.
Tags:
Pages: [1] 2 3 ... 8 Next  All
 

Powered by MySQL Powered by PHP Powered by SMF 2.0 Beta 3.1 Public | SMF © 2006–2008, Simple Machines LLC
All content © 2005-2009 NASASpaceFlight.com
Valid XHTML 1.0! Valid CSS!
Page created in 0.032 seconds with 19 queries.