Author Topic: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)  (Read 22538 times)

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #40 on: 11/02/2016 04:49 AM »
More on the satellite.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #41 on: 11/02/2016 04:51 AM »
T-30 minutes.

Talking about the mission.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #42 on: 11/02/2016 04:53 AM »
I hope we don't see it operating at that altitude!
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #43 on: 11/02/2016 04:54 AM »
Back to the pad. A lot of sprinklers spraying water.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #44 on: 11/02/2016 04:55 AM »
T-25 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #45 on: 11/02/2016 04:58 AM »
International customers.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #46 on: 11/02/2016 04:59 AM »
Social media.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #47 on: 11/02/2016 05:00 AM »
T-20 minutes. Launch events.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Chris Bergin

Lots of water hoses...

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #49 on: 11/02/2016 05:05 AM »
Logo on interstage.

Launch preparations.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #50 on: 11/02/2016 05:05 AM »
T-15 minutes. Launch art.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #51 on: 11/02/2016 05:06 AM »
Putting on the logo.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #52 on: 11/02/2016 05:07 AM »
Go rocket road!!
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Online Chris Bergin

Pretty cool outreach.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #54 on: 11/02/2016 05:08 AM »
Weather report.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #55 on: 11/02/2016 05:09 AM »
T-12 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #56 on: 11/02/2016 05:11 AM »
T-10 minutes. Weather is go.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #57 on: 11/02/2016 05:11 AM »
T-9 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #58 on: 11/02/2016 05:12 AM »
T-8 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 13017
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2875
  • Likes Given: 432
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #59 on: 11/02/2016 05:13 AM »
T-7 minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Tags: