Author Topic: Indian launch schedule  (Read 685586 times)

Online gongora

  • Global Moderator
  • Full Member
  • *****
  • Posts: 1160
  • US
  • Liked: 766
  • Likes Given: 625
Re: Indian launch schedule
« Reply #1360 on: 02/27/2017 05:11 PM »
Press release on the 3 Diamonds secondary payload for the next PSLV.

Offline isro-watch

  • Member
  • Full Member
  • ***
  • Posts: 313
  • Liked: 13
  • Likes Given: 4
Re: Indian launch schedule
« Reply #1361 on: 03/05/2017 11:38 PM »
The QB-50 page now points to a launch on April-21-2017
https://www.qb50.eu/index.php/project-description-obj/launch-scenario

Also, should we add CESAT-1 (Canon Satellite) to the same launch as described on reddit page
https://www.reddit.com/r/ISRO/comments/5hhifr/canon_electronics_cesati_likely_on_pslv_c38_with/

One last thing, a new page for PSLV-C38 is also needed :)


Regards

Offline Ewoker

  • Member
  • Posts: 8
  • Finland
  • Liked: 1
  • Likes Given: 3
Re: Indian launch schedule
« Reply #1362 on: 03/06/2017 10:44 AM »
According to this finnish article (in finnish).

http://www.tiedetuubi.fi/avaruus/yllatyskaanne-aalto-1-paasee-avaruuteen-huhtikuussa-intialaisella-raketilla#

Aalto-1 and bunch of others ex-sherpa passengers are launnching on next pslv on april 23rd.

Offline isro-watch

  • Member
  • Full Member
  • ***
  • Posts: 313
  • Liked: 13
  • Likes Given: 4
Re: Indian launch schedule
« Reply #1363 on: 03/12/2017 04:09 PM »
Spoke with some friends at SHAR, per them, LVM3 may be pushed to late April or early May.
PSLV-C38 will be pushed forward.

End-Mar/Early-April - GSLV
Mid-April                 - PSLV
End-April/Early-May - LVM3

Offline input~2

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 5072
  • Liked: 311
  • Likes Given: 131
Re: Indian launch schedule
« Reply #1364 on: 03/13/2017 06:47 AM »
Per http://www.andhrajyothy.com/artical?SID=381185
New launch dates
GSLV MkII: April 4
PSLV C38: April 15
GSLV MkIII: April 30
« Last Edit: 03/13/2017 06:55 AM by input~2 »

Offline input~2

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 5072
  • Liked: 311
  • Likes Given: 131
Re: Indian launch schedule
« Reply #1365 on: 03/13/2017 06:52 AM »
Launch performed in 2017
Feb 15 03:58 UTC - PSLV(XL)-C37 (FLP) - Cartosat-2D  + INS-1A + INS-1B  + 101 nanosats (Germany, Israel, Kazakhstan, NL, Switzerland, USA)

Tentative launch schedule
   
2017
May 5 11:27 UTC late April - GSLV Mk II F09 (SLP) - GSAT-9 (aka South Asia Sat)
late May - PSLV C38 (FLP) -  Cartosat-2E + 3 Diamonds (Australia) + Venta-1 + Max Valier + 8 cubesats (QB50-PL) + Aalto-1 (Finland)
early June - GSLV Mk III D1 (SLP) - GSAT-19
September
  - GSLV Mk II  - GSAT-6A
H2 - PSLV -  IRNSS-1H
H2 - PSLV - IRNSS-1I
December 28 - PSLV - Team Indus Lunar Lander/ Rover + Team Hakuto Rover
 
piggybacked  on  PSLV: Microsat, PlanetiQ-1, PlanetiQ-2, InnoSat-2 (Malaysia), CE-SAT1 (Japan), Niusat, IITMSAT, Kepler (PSLV Nov, Canada)


June - Ariane 5 - GSAT-17
December- Ariane 5 - GSAT-11


2018
Q1 (or December 2017)    - GSLV Mk III D2 - GSAT-20
Q1- GSLV Mk II - Chandrayaan-2
March - PSLV - Cartosat-3
July - PSLV - Oceansat-3
Q3 - PSLV - EnMap (Germany)
    - GSLV Mk II F12 - GSAT-7A
     - GSLV Mk II F10 - GISAT (GEO Imaging SATellite)

piggybacked  on  PSLV : IMS(Indian Mini Satellite)/Atmos, IMS-1E, IMS-1F,  IinuSat, IMS-B, PARIKSHIT, NEMO-AM (FY 2018-19)

2019
March  - PSLV - Cartosat-3A
Q2 - PSLV - RISAT-1A
     - PSLV XL - Aditiya-1
December or 2020 - PSLV - Oceansat-3A

piggybacked on PSLV: HYSIS

2020
March  - PSLV - Cartosat-3B
        - PSLV - RISAT-2A
Q2 - PSLV - Resourcesat-3S
Q2 - PSLV - Resourcesat-3
    - PSLV? - MOM-2

2021
Q2 - PSLV - Resourcesat-3SA
Q2 - PSLV - Resourcesat-3A
      - GSLV MkII - NISAR (NASA-ISRO SAR sat)

2022

Q1 - PSLV - Resourcesat-3B
     - GSLV MkII - Insat-3DS

2024
- GSLV MkIII - First manned mission

updated on March 23
updated on March 30
updated on April 6
updated on April 14
updated on April 20
« Last Edit: 04/20/2017 02:58 PM by input~2 »

Offline vyoma

  • Full Member
  • ****
  • Posts: 975
  • India
  • Liked: 220
  • Likes Given: 101
Re: Indian launch schedule
« Reply #1366 on: 03/29/2017 11:24 PM »
http://www.thehindu.com/news/national/5-new-satellites-this-year-to-raise-isro-capacity/article17740909.ece

Quote
The first of them, GSAT-9 or the South Asia Satellite, will kick off the serial launches in the first half of April from the Sriharikota space port. (Officials said they had not yet set a date for it.)

Quote
Tentatively, ISRO has lined up the Internet user-friendly GSAT-19 for launch around May; GSAT-17 around June; GSAT-6A, which like GSAT-6, is for the Defence forces, in September; and its largest 5,000-plus GSAT-11 around December. GSAT-17 and GSAT-11 will be launched on the European Ariane launcher.

Quote
After INSAT-4CR was moved to a new orbital slot a few months ago, its efficiency has been improved and a little extra capacity created for select use, he said.

Offline vyoma

  • Full Member
  • ****
  • Posts: 975
  • India
  • Liked: 220
  • Likes Given: 101
Re: Indian launch schedule
« Reply #1367 on: 03/30/2017 04:19 PM »
https://www.geektime.com/2017/03/30/finlands-reaktor-plans-first-network-of-lunar-satellites-as-nasa-esa-lay-groundwork-for-moon-infrastructure/

Quote
RSL previously designed the Aalto-1 and Aalto-2 satellites for the local Aalto University. This July, they plan to launch Finland’s first fully commercial satellite — Reaktor Hello World — with ISRO from an Indian PSLV rocket. Liukkonen expects radio frequency permits for the satellite to clear the month before.

Offline vineethgk

  • Full Member
  • ****
  • Posts: 653
  • India
  • Liked: 145
  • Likes Given: 253
Re: Indian launch schedule
« Reply #1368 on: 04/27/2017 03:57 PM »
ISRO to launch five communication satellites by year-end
Quote
Hyderabad, Apr 27 (PTI) The Indian Space Research Organisation (ISRO) will launch five communication satellites by the year-end, its chairman A S Kiran Kumar said today.

The satellites, proposed to be launched, are aimed at improving the communication system within the country, he said.

"There are five (satellites) that are coming up... all are communication satellites," Kumar told PTI here.

All the satellites would be put in space by the end of this year, the noted space scientist said.

I guess the five comsats Chairman refer to should be - GSAT-9, GSAT-6A (or GSAT-7A), GSAT-19, GSAT-17 and GSAT-11. The first two by GSLV Mk2, third by GSLV Mk3 and the last two by Ariane.

Offline input~2

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 5072
  • Liked: 311
  • Likes Given: 131
Re: Indian launch schedule
« Reply #1369 on: 05/05/2017 01:09 PM »
Launch performed in 2017
Feb 15 03:58 UTC - PSLV(XL)-C37 (FLP) - Cartosat-2D  + INS-1A + INS-1B  + 101 nanosats (Germany, Israel, Kazakhstan, NL, Switzerland, USA)
May 5 11:27 UTC - GSLV Mk II F09 (SLP) - GSAT-9 (aka South Asia Sat)

Tentative launch schedule
   
2017
early June 5, 11:58 UTC- GSLV Mk III D1 (SLP) - GSAT-19
late May 25 June 15-21 23-30 - PSLV C38 (FLP) -  Cartosat-2E + 3 Diamonds (Australia) + Venta-1 + Max Valier + 8 cubesats (QB50-PL) + Aalto-1 (Finland) & al.
September  - GSLV Mk II  - GSAT-6A
H2 - PSLV -  IRNSS-1H
H2 - PSLV - IRNSS-1I
December 28 - PSLV - Team Indus Lunar Lander/ Rover + Team Hakuto Rover
 
piggybacked  on  PSLV: Microsat, PlanetiQ-1, PlanetiQ-2, InnoSat-2 (Malaysia), CE-SAT1 (Japan), Niusat, IITMSAT, Kepler (PSLV Nov, Canada)


June 28 - Ariane 5 - GSAT-17
December- Ariane 5 - GSAT-11


2018
Q1 (or December 2017)    - GSLV Mk III D2 - GSAT-20
Q1- GSLV Mk II - Chandrayaan-2
March - PSLV - Cartosat-3
July - PSLV - Oceansat-3
Q3 - PSLV - EnMap (Germany)
    - GSLV Mk II F12 - GSAT-7A
     - GSLV Mk II F10 - GISAT (GEO Imaging SATellite)

piggybacked  on  PSLV : IMS(Indian Mini Satellite)/Atmos, IMS-1E, IMS-1F,  IinuSat, IMS-B, PARIKSHIT, NEMO-AM (FY 2018-19)

2019
March  - PSLV - Cartosat-3A
Q2 - PSLV - RISAT-1A
     - PSLV XL - Aditiya-1
December or 2020 - PSLV - Oceansat-3A

piggybacked on PSLV: HYSIS

2020
March  - PSLV - Cartosat-3B
        - PSLV - RISAT-2A
Q2 - PSLV - Resourcesat-3S
Q2 - PSLV - Resourcesat-3
    - PSLV? - MOM-2

2021
Q2 - PSLV - Resourcesat-3SA
Q2 - PSLV - Resourcesat-3A
      - GSLV MkII - NISAR (NASA-ISRO SAR sat)

2022

Q1 - PSLV - Resourcesat-3B
     - GSLV MkII - Insat-3DS

2024
- GSLV MkIII - First manned mission

updated on May 6
updated on May 10
updated on May 18
updated on May 26
updated on May 29
« Last Edit: 05/29/2017 04:09 PM by input~2 »

Offline vyoma

  • Full Member
  • ****
  • Posts: 975
  • India
  • Liked: 220
  • Likes Given: 101
Re: Indian launch schedule
« Reply #1370 on: 05/12/2017 06:52 AM »
GSAT-17 satellite flagged off from ISAC on 11th May 2017: http://www.isac.gov.in/flagoff-GSAT-17.jsp

Offline input~2

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 5072
  • Liked: 311
  • Likes Given: 131
Re: Indian launch schedule
« Reply #1371 on: 06/05/2017 12:26 PM »
Launch performed in 2017
Feb 15 03:58 UTC - PSLV(XL)-C37 (FLP) - Cartosat-2D  + INS-1A + INS-1B  + 101 nanosats (Germany, Israel, Kazakhstan, NL, Switzerland, USA)
May 5 11:27 UTC - GSLV Mk II F09 (SLP) - GSAT-9 (aka South Asia Sat)
June 5 11:58 UTC- GSLV Mk III D1 (SLP) - GSAT-19
June 23 03:59 UTC  - PSLV-XL C38 (FLP) -  Cartosat-2E + 3 Diamonds + Venta-1 + Max Valier + 8 cubesats (QB50-PL) + Aalto-1
+ Lemur-2 (34 to 41) + NIUSat + CE-SAT 1 + D-Sat + ROBUSTA 1B + SUCHAI + skCUBE

Tentative launch schedule
   
2017
August - PSLV-XL C39 -  IRNSS-1H
September
  - GSLV Mk II  - GSAT-6A
H2 - GSLV MkII - tbd
H2 - PSLV-XL C40 - IRNSS-1I
December 28 (or 2018) - PSLV-XL - Team Indus Lunar Lander/ Rover + Team Hakuto Rover
 
piggybacked  on  PSLV: Microsat, PlanetiQ-1, PlanetiQ-2, InnoSat-2 (Malaysia), CE-SAT1 (Japan), Niusat, IITMSAT, Kepler (PSLV Nov, Canada)


June 28 - Ariane 5 - GSAT-17
December- Ariane 5 - GSAT-11


2018
Q1 - GSLV Mk III D2 - GSAT-20
Q1- GSLV Mk II - Chandrayaan-2
March - PSLV - Cartosat-3
July - PSLV - Oceansat-3
Q3 - PSLV - EnMap (Germany)
    - GSLV Mk II F12 - GSAT-7A
     - GSLV Mk II F10 - GISAT (GEO Imaging SATellite)

piggybacked  on  PSLV : IMS(Indian Mini Satellite)/Atmos, IMS-1E, IMS-1F,  IinuSat, IMS-B, PARIKSHIT, NEMO-AM (FY 2018-19)

2019
March  - PSLV - Cartosat-3A
Q2 - PSLV - RISAT-1A
     - PSLV XL - Aditiya-1
December or 2020 - PSLV - Oceansat-3A

piggybacked on PSLV: HYSIS

2020
March  - PSLV - Cartosat-3B
        - PSLV - RISAT-2A
Q2 - PSLV - Resourcesat-3S
Q2 - PSLV - Resourcesat-3
    - PSLV? - MOM-2

2021
Q2 - PSLV - Resourcesat-3SA
Q2 - PSLV - Resourcesat-3A
      - GSLV MkII - NISAR (NASA-ISRO SAR sat)

2022

Q1 - PSLV - Resourcesat-3B
     - GSLV MkII - Insat-3DS

2024
- GSLV MkIII - First manned mission

updated on June 9
updated on June 13
updated on June 19
updated on June 23
« Last Edit: 06/23/2017 07:04 PM by input~2 »

Offline vineethgk

  • Full Member
  • ****
  • Posts: 653
  • India
  • Liked: 145
  • Likes Given: 253
Re: Indian launch schedule
« Reply #1372 on: 06/09/2017 05:32 AM »
- GSLV-III D2 tentatively targeted for Jan 2018
- Two GSLV launches and three PSLV launches (including C38) planned for the rest of the year. The first GSLV should be lofting GSAT-6A based on prior reports. Candidates for the second GSLV could be Chandrayan-2, GSAT-7A or GISAT-1.

Quote
After the historic launch of the 640 ton, first developmental flight of Geosynchronous Satellite Launch Vehicle (GSLV) -Mark III (D1) on June 5, the team of scientists from Isro centres here have set their target to launch its second developmental flight GSLV-Mark III -D2 by Jan 2018 with more payload and higher thrust.
Quote
Ahead of that, two more GSLV launches and three more PSLV launches are planned including the latest PSLV -C38 on June 28.
Source

Offline sportyfailure

  • Member
  • Posts: 17
  • India
  • Liked: 9
  • Likes Given: 7
Re: Indian launch schedule
« Reply #1373 on: 06/14/2017 05:53 AM »
PSLV C38 NOTAM is out

Quote
A1174/17 NOTAMN
Q) VOMF/QWMLW/IV/BO/W/000/999/
A) VOMF PART 1 OF 2 B) 1706230330 C) 1707220730
D) BTN 0330-0730
E) PSLV-C38 ROCKET LAUNCH FM SHAR RANGE,SRIHARIKOTA WILL TAKE PLACE
AS PER FLW DETAILS.THE LAUNCH WILL BE ON ANY ONE OF THE DAY DRG THIS
PERIOD.ACTUAL DATE OF LAUNCH WILL BE INTIMATED 24 HR IN ADVANCE
THROUGH A SEPARATE NOTAM.
LAUNCH PAD COORD: 134354N0801412E
NO FLT IS PERMITTED OVER THE DNG ZONE.
A.DNG ZONE-1 IS A CIRCLE OF 10NM AROUND THE LAUNCHER
B.DNG ZONE-2 IS A RECTANGULAR AREA BOUNDED BY:
1310N08025E 1325N08040E 1245N08115E 1230N08100E
C.DNG ZONE-3 IS A RECTANGULAR AREA BOUNDED BY:
1145N08120E 1210N08150E 1045N08255E 1020N08225E
D.DNG ZONE-4 IS A RECTANGULAR AREA BOUNDED BY:
1015N08230E 1040N08300E 0950N08335E 0925N08305E
E.DNG ZONE-5 IS A RECTANGULAR AREA BOUNDED BY:
0825N08320E 0825N08355E 0715N08355E 0715N08320E
F.DNG ZONE-6 IS A RECTANGULAR AREA BONDED BY:
0300S08110E 0320S08230E 0705S08135E 0645S08015E
G.DNG ZONE-7 IS A RECTANGULAR AREA BOUNDED BY
2945S07335E 3025S07610E 3955S07340E 3915S07105E
ROUTES AFFECTED IN CHENNAI FIR:
P761, W20, A465, P574, B466, L896, N563, N564, Q10, Q11, Q23,
Q24, V3, V4, V6, V8, V9, V11 AND T3
CLOSURE/ALTN ROUTINGS:
END PART 1 OF 2

Quote
0330-0730, 23 JUN 03:30 2017 UNTIL 22 JUL 07:30 2017

Launch is likely to happen on 23 June itself.

Offline vineethgk

  • Full Member
  • ****
  • Posts: 653
  • India
  • Liked: 145
  • Likes Given: 253

Tags: