Author Topic: Preparing the Mobile Launcher to be armed and ready for SLS  (Read 959 times)

Online Chris Bergin

I'm giving this a standalone as Philip's interviewed a bunch of GSDO managers for this and it really is a great update to a lot of articles we've run on the LETF and ML.

https://www.nasaspaceflight.com/2017/07/mobile-launcher-armed-ready-sls/ - by Philip Sloss


Previous LETF:
https://www.nasaspaceflight.com/?s=LETF

Previous ML:
https://www.nasaspaceflight.com/tag/ML/


And if you have L2, you'll love this. Engineering kid in a candy store:
https://forum.nasaspaceflight.com/index.php?topic=33528.0

Offline Gary NASA

  • Full Member
  • ***
  • Posts: 349
  • Liked: 1095
  • Likes Given: 45
This is great. The site's coverage of the LETF fills me with pride.

Online Harold KSC

  • Full Member
  • ****
  • Posts: 553
  • Liked: 3303
  • Likes Given: 27
Everyone here got told about it. :)

To: KSC-DL-GSDO-All
Subject: GSDO Feature Article

Team,
 
Below is a link to the recent release of an article covering the GSDO program from nasaspaceflight.com. Enjoy!
 
https://www.nasaspaceflight.com/2017/07/mobile-launcher-armed-ready-sls/
 
-GSDO Comm Team

Online jacqmans

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 16620
  • Houten, The Netherlands
  • Liked: 2334
  • Likes Given: 149
The Orion crew access arm
« Last Edit: Today at 09:21 AM by jacqmans »

Tags: