Author Topic: What would a better CxP have looked like?  (Read 41102 times)

Offline vulture4

  • Full Member
  • ****
  • Posts: 987
  • Liked: 305
  • Likes Given: 89
Re: What would a better CxP have looked like?
« Reply #80 on: 07/21/2014 10:21 PM »
Yet it wasn't long ago that the same budget was directed to Shuttle and OSP. Shuttle had contractors in every state. We abandoned them in a heartbeat.

Tags: