On page 16 of the GAO report it says, "The critical design review is the time in a project’s life cycle when the integrity of the product’s design and its ability to meet mission requirements are assessed, and it is important that a project ’s design is stable enough to warrant continuation with design and fabrication. SpaceX’s final planned design review was held in August 2016; however, the program reported that a number of outstanding areas, primarily related to ground systems, still needed to be reviewed. SpaceX officials told us these areas were reviewed in November 2016."

So, the critical design review is complete. I'm not sure exactly which milestone this refers to, but it sounds like a significant development.

Offline psloss

  • Veteran armchair spectator
  • Senior Member
  • *****
  • Posts: 17980
  • Liked: 4046
  • Likes Given: 2089
Re: Commercial Crew Schedule Analysis
« Reply #381 on: 03/28/2017 07:23 pm »
From NAC HEO mtg CCP presentation today...redacted a phone number...
« Last Edit: 03/28/2017 07:23 pm by psloss »

Offline psloss

  • Veteran armchair spectator
  • Senior Member
  • *****
  • Posts: 17980
  • Liked: 4046
  • Likes Given: 2089
Re: Commercial Crew Schedule Analysis
« Reply #382 on: 03/28/2017 07:40 pm »

Offline psloss

  • Veteran armchair spectator
  • Senior Member
  • *****
  • Posts: 17980
  • Liked: 4046
  • Likes Given: 2089
Re: Commercial Crew Schedule Analysis
« Reply #383 on: 03/28/2017 07:40 pm »

Offline rockets4life97

  • Full Member
  • ****
  • Posts: 798
  • Liked: 538
  • Likes Given: 365
Re: Commercial Crew Schedule Analysis
« Reply #384 on: 03/29/2017 01:14 am »
SpaceX looks to have closed out a significant number of development milestones at the end of 2016.

It seems plausible that waiting for Block V could be the challenge that pushes the schedule to the right. I wonder if DM-1 could fly on Block IV?

Offline cebri

  • Full Member
  • **
  • Posts: 245
  • Spain
  • Liked: 291
  • Likes Given: 181
Re: Commercial Crew Schedule Analysis
« Reply #385 on: 03/29/2017 10:25 pm »
So, no news on how is the certification of the RD-180 going. 
"It's kind of amazing that a window of opportunity is open for life to beyond Earth, and we don't know how long this window is gonna be open" Elon Musk
"If you want to see an endangered species, get up and look in the mirror." John Young

Offline yg1968

  • Senior Member
  • *****
  • Posts: 17256
  • Liked: 7111
  • Likes Given: 3061

Offline rockets4life97

  • Full Member
  • ****
  • Posts: 798
  • Liked: 538
  • Likes Given: 365
Re: Commercial Crew Schedule Analysis
« Reply #387 on: 03/29/2017 11:38 pm »
Here are the slides of the NAC meeting:

https://www.nasa.gov/sites/default/files/atoms/files/nac_ccp_status_march_28_20171.pdf

https://www.nasa.gov/directorates/heo/nac-heoc

Can someone explain the schedule risks? I don't understand what those mean. Is one for Boeing and one for Spacex for starters?

Offline joek

  • Senior Member
  • *****
  • Posts: 4860
  • Liked: 2780
  • Likes Given: 1095
Re: Commercial Crew Schedule Analysis
« Reply #388 on: 03/30/2017 12:20 am »
Can someone explain the schedule risks? I don't understand what those mean. Is one for Boeing and one for Spacex for starters?

If you are referring to slides 6-7, the number in the matrix on the right side is the count of items in the table on the left side with that Likelihood and Consequence (LxC in the table on the left).

Offline rockets4life97

  • Full Member
  • ****
  • Posts: 798
  • Liked: 538
  • Likes Given: 365
Re: Commercial Crew Schedule Analysis
« Reply #389 on: 03/30/2017 12:50 am »
Can someone explain the schedule risks? I don't understand what those mean. Is one for Boeing and one for Spacex for starters?

If you are referring to slides 6-7, the number in the matrix on the right side is the count of items in the table on the left side with that Likelihood and Consequence (LxC in the table on the left).

Thanks, yes those are the slides I was referring to. I understand the table. What I don't understand is the actual items.

Offline deruch

  • Senior Member
  • *****
  • Posts: 2422
  • California
  • Liked: 2006
  • Likes Given: 5634
Re: Commercial Crew Schedule Analysis
« Reply #390 on: 03/30/2017 08:00 am »
Can someone explain the schedule risks? I don't understand what those mean. Is one for Boeing and one for Spacex for starters?

If you are referring to slides 6-7, the number in the matrix on the right side is the count of items in the table on the left side with that Likelihood and Consequence (LxC in the table on the left).

Thanks, yes those are the slides I was referring to. I understand the table. What I don't understand is the actual items.
They are 2 matrices that are showing Program risks.  In this case, "Program" means NASA's Commercial Crew Program (CCP), not specifically either of the partner programs (i.e. not vehicle specific).  The first matrix shows overall Programmatic risks, and includes considerations of cost and schedule.  The second matrix is just for health/safety issues.
Shouldn't reality posts be in "Advanced concepts"?  --Nomadd

Offline rockets4life97

  • Full Member
  • ****
  • Posts: 798
  • Liked: 538
  • Likes Given: 365
Re: Commercial Crew Schedule Analysis
« Reply #391 on: 03/30/2017 11:42 am »
They are 2 matrices that are showing Program risks.  In this case, "Program" means NASA's Commercial Crew Program (CCP), not specifically either of the partner programs (i.e. not vehicle specific).  The first matrix shows overall Programmatic risks, and includes considerations of cost and schedule.  The second matrix is just for health/safety issues.

Okay. So, could these end up affecting the providers? I'm interested in more info, if some has it. Maybe these have been discussed elsewhere?

Requirement changes: sounds like it could be new work? Do we know more about this?
DoD Search and Rescue (Posture & Training Schedule): I imagine this is the Coast Guard/Navy's ability to go get a capsule for an emergency/off-nominal?
Ability to close LOC (Loss of Crew?) Gap: How big is this gap and what are the strategies for closing it?
Ammonia Emergency Response: Is this for a capsule on the pad or in space or both or what?


Offline SWGlassPit

  • I break space hardware
  • Full Member
  • ****
  • Posts: 845
  • Liked: 893
  • Likes Given: 142
Re: Commercial Crew Schedule Analysis
« Reply #392 on: 03/30/2017 04:56 pm »

Ammonia Emergency Response: Is this for a capsule on the pad or in space or both or what?


I couldn't say on the others, but Ammonia Emergency Response refers to a toxic atmosphere event on ISS when a USCV is docked.  Right now, with everyone coming and going on Soyuz, the procedures are "simple" in terms of how to handle an ammonia leak in the US segment.  With crew vehicles docked to both ends of station, however, it's more complicated.

Offline erioladastra

  • Full Member
  • ****
  • Posts: 1413
  • Liked: 222
  • Likes Given: 0
Re: Commercial Crew Schedule Analysis
« Reply #393 on: 04/06/2017 02:12 pm »
They are 2 matrices that are showing Program risks.  In this case, "Program" means NASA's Commercial Crew Program (CCP), not specifically either of the partner programs (i.e. not vehicle specific).  The first matrix shows overall Programmatic risks, and includes considerations of cost and schedule.  The second matrix is just for health/safety issues.

Okay. So, could these end up affecting the providers? I'm interested in more info, if some has it. Maybe these have been discussed elsewhere?

Requirement changes: sounds like it could be new work? Do we know more about this?
DoD Search and Rescue (Posture & Training Schedule): I imagine this is the Coast Guard/Navy's ability to go get a capsule for an emergency/off-nominal?
Ability to close LOC (Loss of Crew?) Gap: How big is this gap and what are the strategies for closing it?
Ammonia Emergency Response: Is this for a capsule on the pad or in space or both or what?



This is just a few, there are many more - often is new work, but definitely more work.  There is also a lot of cases where the requirement hasn't changed but the verification has.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 39048
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 32358
  • Likes Given: 8025
Re: Commercial Crew Schedule Analysis
« Reply #394 on: 06/03/2017 08:01 am »
The 2017 AST Compendium has some interesting data.

USCV 1 and 3 are shown as Falcon 9 and USCV 2 and 4 as Atlas V.

From 2019, there are three SpaceX, one OA and one SNC cargo missions per year.

For CRS2, SpaceX is getting $900M for six missions ($150M each) and OA is getting $1,400M for six missions ($233M each). At the above flight rates, that covers two years for SpaceX and six years for OA. Cost data is not given for SNC.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Confusador

  • Full Member
  • **
  • Posts: 294
  • Liked: 191
  • Likes Given: 381
Re: Commercial Crew Schedule Analysis
« Reply #395 on: 06/03/2017 01:04 pm »
The 2017 AST Compendium has some interesting data.

USCV 1 and 3 are shown as Falcon 9 and USCV 2 and 4 as Atlas V.

From 2019, there are three SpaceX, one OA and one SNC cargo missions per year.

For CRS2, SpaceX is getting $900M for six missions ($150M each) and OA is getting $1,400M for six missions ($233M each). At the above flight rates, that covers two years for SpaceX and six years for OA. Cost data is not given for SNC.

Those prices seem reasonable, given the relative volumes, so the implication to me seems to be that downmass is the driving force in flight rates.  That's certainly good for SpaceX,  but could also bode well for SNC if the initial flights go well.

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 10183
  • US
  • Liked: 13845
  • Likes Given: 5915
Re: Commercial Crew Schedule Analysis
« Reply #396 on: 06/03/2017 02:45 pm »
The 2017 AST Compendium has some interesting data...

The AST Compendium is prepared by an outside contractor for the FAA and details in it should probably be taken with a grain of salt (the flight schedule for SpaceX CRS flights differs by an entire year from FPIP released around the same time, the $1.2B listed for the SpaceX CRS-1 extension was for all 8 flights, etc.)  It is a good high level overview of the space launch industry.

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 10183
  • US
  • Liked: 13845
  • Likes Given: 5915
Re: Commercial Crew Schedule Analysis
« Reply #397 on: 07/20/2017 02:23 pm »
https://blogs.nasa.gov/commercialcrew/2017/07/20/nasas-commercial-crew-program-target-flight-dates/
Quote
Targeted Test Flight Dates:
Boeing Orbital Flight Test: June 2018
Boeing Crew Flight Test: August 2018
SpaceX Demonstration Mission 1: February 2018
SpaceX Demonstration Mission 2 (crewed): June 2018

Offline rockets4life97

  • Full Member
  • ****
  • Posts: 798
  • Liked: 538
  • Likes Given: 365
Re: Commercial Crew Schedule Analysis
« Reply #398 on: 07/20/2017 02:25 pm »
Did SpaceX DM-1 just move forward to February? I thought the last date we say was March 9.

Offline gongora

  • Global Moderator
  • Senior Member
  • *****
  • Posts: 10183
  • US
  • Liked: 13845
  • Likes Given: 5915
Re: Commercial Crew Schedule Analysis
« Reply #399 on: 07/20/2017 02:48 pm »
Maybe?  I doubt any of these dates are really fixed yet.

 

Advertisement NovaTech
Advertisement Northrop Grumman
Advertisement
Advertisement Margaritaville Beach Resort South Padre Island
Advertisement Brady Kenniston
Advertisement NextSpaceflight
Advertisement Nathan Barker Photography
0