Forums
L2 Sign Up
SLS/Orion
SpaceX
Commercial
ISS
International
Other
Shop
Home
Help
Tags
Calendar
Login
Register
Forums
»
International Space Flight (ESA, Russia, China and others)
»
Japanese Launchers
»
LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
24
Likes
Print
Pages:
1
[
2
]
3
4
...
6
Next
All
Go Down
Author
Topic: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC) (Read 40801 times)
yoichi
Full Member
Posts: 1106
Liked: 678
Likes Given: 1
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #20 on:
11/01/2016 11:07 pm »
http://h2a.mhi.co.jp/en/mission/countdown/h2a_f31.html
November 02, 2016 06:21 JST
Terminal countdown operation to start
Terminal countdown operation has started. Access will now be restricted within a radius of 400 meters from the launch pad.
November 02, 2016 08:49 JST
Attitude control system flight slew test completed
By running programs of the guidance and control system mounted on H-IIA F31, it has been confirmed that all devices for flight attitude control are working as expected.
Logged
Chris Bergin
likes this
yoichi
Full Member
Posts: 1106
Liked: 678
Likes Given: 1
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #21 on:
11/02/2016 01:10 am »
http://h2a.mhi.co.jp/en/mission/countdown/h2a_f31.html
November 02, 2016 10:08 JST
First stage and second stage liquid oxygen and liquid hydrogen tanks fully loaded
It has been confirmed that the first- and second-stage liquid hydrogen and liquid oxygen tanks have been fully loaded.
Logged
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 134999
Liked: 123205
Likes Given: 25251
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #22 on:
11/02/2016 01:23 am »
William Graham's launch article!
https://www.nasaspaceflight.com/2016/11/japanese-h-iia-rocket-himawari-9-launch/
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
yoichi
Full Member
Posts: 1106
Liked: 678
Likes Given: 1
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #23 on:
11/02/2016 01:30 am »
http://h2a.mhi.co.jp/en/mission/countdown/h2a_f31.html
November 02, 2016 11:19 JST
Radio frequency system checked up
The radio frequency system between H-IIA F31 and the ground stations has been checked up.
Logged
Chris Bergin
likes this
yoichi
Full Member
Posts: 1106
Liked: 678
Likes Given: 1
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #24 on:
11/02/2016 04:22 am »
http://h2a.mhi.co.jp/en/mission/countdown/h2a_f31.html
November 02, 2016 13:55 JST
Attitude control system flight slew test completed
The second attitude control system flight slew test has been completed.
November 02, 2016 14:14 JST
Third Go/No Go Decision
The green light has been given to the X-60 minutes terminal countdown operation.
«
Last Edit: 11/02/2016 04:23 am by yoichi
»
Logged
yoichi
Full Member
Posts: 1106
Liked: 678
Likes Given: 1
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #25 on:
11/02/2016 04:31 am »
non JAXA official live start
Logged
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 134999
Liked: 123205
Likes Given: 25251
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #26 on:
11/02/2016 04:33 am »
Not long now.
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 134999
Liked: 123205
Likes Given: 25251
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #27 on:
11/02/2016 04:37 am »
There she is!
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
Steven Pietrobon
Member
Senior Member
Posts: 39048
Adelaide, Australia
Liked: 32358
Likes Given: 8025
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #28 on:
11/02/2016 04:38 am »
Broadcast starting in a few minutes.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Steven Pietrobon
Member
Senior Member
Posts: 39048
Adelaide, Australia
Liked: 32358
Likes Given: 8025
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #29 on:
11/02/2016 04:41 am »
Broadcast has begun. Showing a previous launch.
Logged
Chris Bergin
likes this
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 134999
Liked: 123205
Likes Given: 25251
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #30 on:
11/02/2016 04:41 am »
Heh, they cut right into the launch of the previous satellite. Gave me a shock as I was looking away at the time
Logged
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
Steven Pietrobon
Member
Senior Member
Posts: 39048
Adelaide, Australia
Liked: 32358
Likes Given: 8025
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #31 on:
11/02/2016 04:42 am »
Closeup of F31.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Chris Bergin
NSF Managing Editor
Administrator
Senior Member
Posts: 134999
Liked: 123205
Likes Given: 25251
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #32 on:
11/02/2016 04:42 am »
Awesome launch site
Logged
kch
likes this
Support NSF via L2
--
Help improve NSF
--
Site Rules/Feedback/Updates
**Not a L2 member? Whitelist this forum in your adblocker to support the site and ensure full functionality.**
Steven Pietrobon
Member
Senior Member
Posts: 39048
Adelaide, Australia
Liked: 32358
Likes Given: 8025
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #33 on:
11/02/2016 04:42 am »
Launch location.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Steven Pietrobon
Member
Senior Member
Posts: 39048
Adelaide, Australia
Liked: 32358
Likes Given: 8025
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #34 on:
11/02/2016 04:43 am »
Our launch commentator.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
MATTBLAK
Elite Veteran & 'J.A.F.A'
Senior Member
Posts: 5362
'Space Cadets' Let us; UNITE!! (crickets chirping)
New Zealand
Liked: 2238
Likes Given: 3883
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #35 on:
11/02/2016 04:44 am »
Certainly one of the prettiest launch sites in the world!
Logged
"Those who can't, Blog". 'Space Cadets' of the World - Let us
UNITE!!
(crickets chirping)
Steven Pietrobon
Member
Senior Member
Posts: 39048
Adelaide, Australia
Liked: 32358
Likes Given: 8025
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #36 on:
11/02/2016 04:44 am »
Side view and launch time.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Steven Pietrobon
Member
Senior Member
Posts: 39048
Adelaide, Australia
Liked: 32358
Likes Given: 8025
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #37 on:
11/02/2016 04:45 am »
Talking about the satellite mission.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Steven Pietrobon
Member
Senior Member
Posts: 39048
Adelaide, Australia
Liked: 32358
Likes Given: 8025
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #38 on:
11/02/2016 04:46 am »
The satellite.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Steven Pietrobon
Member
Senior Member
Posts: 39048
Adelaide, Australia
Liked: 32358
Likes Given: 8025
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
«
Reply #39 on:
11/02/2016 04:47 am »
Increase in performance.
Logged
Akin's Laws of Spacecraft Design #1: Engineering is done with numbers. Analysis without numbers is only an opinion.
Print
Pages:
1
[
2
]
3
4
...
6
Next
All
Go Up
Tags:
Forums
»
International Space Flight (ESA, Russia, China and others)
»
Japanese Launchers
»
LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
Advertisement
Advertisement
Tweets by NASASpaceflight
Advertisement
Advertisement
Advertisement
Advertisement
Advertisement
1