Author Topic: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)  (Read 15328 times)

Offline yoichi

  • Full Member
  • ****
  • Posts: 495
  • Liked: 149
  • Likes Given: 0
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #20 on: 11/01/2016 11:07 PM »
http://h2a.mhi.co.jp/en/mission/countdown/h2a_f31.html

November 02, 2016 06:21 JST
Terminal countdown operation to start
Terminal countdown operation has started. Access will now be restricted within a radius of 400 meters from the launch pad.

November 02, 2016 08:49 JST
Attitude control system flight slew test completed
By running programs of the guidance and control system mounted on H-IIA F31, it has been confirmed that all devices for flight attitude control are working as expected.

Offline yoichi

  • Full Member
  • ****
  • Posts: 495
  • Liked: 149
  • Likes Given: 0
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #21 on: 11/02/2016 01:10 AM »
http://h2a.mhi.co.jp/en/mission/countdown/h2a_f31.html

November 02, 2016 10:08 JST
First stage and second stage liquid oxygen and liquid hydrogen tanks fully loaded
It has been confirmed that the first- and second-stage liquid hydrogen and liquid oxygen tanks have been fully loaded.


Offline yoichi

  • Full Member
  • ****
  • Posts: 495
  • Liked: 149
  • Likes Given: 0
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #23 on: 11/02/2016 01:30 AM »
http://h2a.mhi.co.jp/en/mission/countdown/h2a_f31.html
November 02, 2016 11:19 JST
Radio frequency system checked up
The radio frequency system between H-IIA F31 and the ground stations has been checked up.

Offline yoichi

  • Full Member
  • ****
  • Posts: 495
  • Liked: 149
  • Likes Given: 0
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #24 on: 11/02/2016 04:22 AM »
http://h2a.mhi.co.jp/en/mission/countdown/h2a_f31.html

November 02, 2016 13:55 JST
Attitude control system flight slew test completed
The second attitude control system flight slew test has been completed.

November 02, 2016 14:14 JST
Third Go/No Go Decision
The green light has been given to the X-60 minutes terminal countdown operation.
« Last Edit: 11/02/2016 04:23 AM by yoichi »

Offline yoichi

  • Full Member
  • ****
  • Posts: 495
  • Liked: 149
  • Likes Given: 0
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #25 on: 11/02/2016 04:31 AM »
non JAXA official live start




Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 10460
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2204
  • Likes Given: 303
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #28 on: 11/02/2016 04:38 AM »
Broadcast starting in a few minutes.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 10460
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2204
  • Likes Given: 303
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #29 on: 11/02/2016 04:41 AM »
Broadcast has begun. Showing a previous launch.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Chris Bergin

Heh, they cut right into the launch of the previous satellite. Gave me a shock as I was looking away at the time ;D

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 10460
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2204
  • Likes Given: 303
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #31 on: 11/02/2016 04:42 AM »
Closeup of F31.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.


Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 10460
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2204
  • Likes Given: 303
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #33 on: 11/02/2016 04:42 AM »
Launch location.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 10460
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2204
  • Likes Given: 303
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #34 on: 11/02/2016 04:43 AM »
Our launch commentator.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline MATTBLAK

  • Elite Veteran & 'J.A.F.A'
  • Senior Member
  • *****
  • Posts: 3502
  • 'Space Cadets' Let us; UNITE!! (crickets chirping)
  • New Zealand
  • Liked: 594
  • Likes Given: 985
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #35 on: 11/02/2016 04:44 AM »
Certainly one of the prettiest launch sites in the world!
"Those who can't, Blog".   'Space Cadets' of the World - Let us UNITE!! (crickets chirping)

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 10460
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2204
  • Likes Given: 303
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #36 on: 11/02/2016 04:44 AM »
Side view and launch time.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 10460
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2204
  • Likes Given: 303
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #37 on: 11/02/2016 04:45 AM »
Talking about the satellite mission.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 10460
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2204
  • Likes Given: 303
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #38 on: 11/02/2016 04:46 AM »
The satellite.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Offline Steven Pietrobon

  • Member
  • Senior Member
  • *****
  • Posts: 10460
  • Adelaide, Australia
    • Steven Pietrobon's Space Archive
  • Liked: 2204
  • Likes Given: 303
Re: LIVE: Himawari 9 - H-IIA 202 - November 2, 2016 (06:20 UTC)
« Reply #39 on: 11/02/2016 04:47 AM »
Increase in performance.
Akin's Laws of Spacecraft Design #1:  Engineering is done with numbers.  Analysis without numbers is only an opinion.

Tags: