MrTim - 30/8/2007 11:53 AMDo you have regular access to the O&C Highbay, and did you take that pic of it nearly empty?
pad rat - 30/8/2007 2:08 PMIt sure seems odd to walk by the south wing of O&C and see high bay doors open to the outside air at both ends.
tankmodeler - 30/8/2007 2:43 PMQuotepad rat - 30/8/2007 2:08 PMIt sure seems odd to walk by the south wing of O&C and see high bay doors open to the outside air at both ends.Wow, they must really be "done with it" for a while to let the "clean room" status fall off. What class space is that? 100K?Paul
MrTim - 10/9/2007 4:41 AMThreads for pics of changes in the VAB and Firing rooms would be nice.Might be good if somebody at KSC could start a similar thread with pics of activity at the pads too.
Here's an update on the O&C as of March 29, 2012. This article has a nice photo of the refurbished High Bay, where Orion EFT-1 will be prepared in coming months. http://www.floridatoday.com/article/20120329/SPACE/303290032/KSC-building-reborn-Spacecraft-Factory-Future?nclick_check=1 - Ed Kyle
Quote from: edkyle99 on 04/25/2012 05:49 pmHere's an update on the O&C as of March 29, 2012. This article has a nice photo of the refurbished High Bay, where Orion EFT-1 will be prepared in coming months. http://www.floridatoday.com/article/20120329/SPACE/303290032/KSC-building-reborn-Spacecraft-Factory-Future?nclick_check=1 - Ed KyleI don't see how they keep 350-400 people busy with the extremely low volume of Orion capsules they will be building. Even if you have 1 person performing assembly, and another person documenting the assembly, it still seems like at least twice as many employees than they need.