Author Topic: FAILURE: IRNSS-1H, PSLV C39, SLP, August 31, 2017 (13:30 UTC)  (Read 30324 times)

Offline jcm

  • Senior Member
  • *****
  • Posts: 2789
  • Jonathan McDowell
  • Somerville, Massachusetts, USA
    • Jonathan's Space Report
  • Liked: 333
  • Likes Given: 282
“we have depleted all the propellant through the gap in the heat shield and the fourth stage.” Dr K Sivan Director VSSC
As per reddit above.

Interesting. Looks like there may have been a change in the decay rate around third apogee (2000 UTC Aug 31),
about when the two debris objects seem to have come off.
-----------------------------

Jonathan McDowell
http://planet4589.org

Online StevenV

  • Member
  • Posts: 6
  • Liked: 0
  • Likes Given: 1
Could the sat have been configured to auto-passivate on battery failure?

Offline vineethgk

  • Full Member
  • ****
  • Posts: 699
  • India
  • Liked: 150
  • Likes Given: 256
http://indianexpress.com/article/technology/science/isro-suspects-pyro-elements-failed-to-separate-rockets-heat-shield-4831240/

Quote
The Indian space agency is strongly suspecting the failure of pyro elements for the non-separation of the heat shield of its rocket Polar Satellite Launch Vehicle’s (PSLV) XL variant on Aug 31, said a senior official.
Quote
According to K. Sivan, Director, Vikram Sarabhai Space Centre (VSSC), all the systems during the rocket’s flight worked well while the only suspect place is the pyro elements.
Quote
One fortunate aspect of the failure is that ISRO has all the flight data as the rocket was not lost during its one way journey.
Quote
“Tests are going on to find out the reasons for the failure of heat shield separation. Each test takes around 72 hours,” Sivan told IANS.

Offline worldtimedate

  • Full Member
  • *
  • Posts: 116
  • Liked: 5
  • Likes Given: 0
Last month’s failed mission of PSLV appears to have dried up the influx of usual news reports of the forthcoming satellite launch of ISRO appearing in the Indian Newspapers. I have found the following news report though a bit old by 10 to 11 days, yet it brings to light some issue that could have precipitated the failure of the PSLV mission. M.Y.S. Prasad, the former director of SDSC making some interesting points related to the mission failure as well as quality control responsible for the failure of the GSLV-F02 launch in 2006 and component problems in IRNSS-1A.

Source : Non-separation of PSLV heat shield can be due to process quality issue, and not a design failure, say space technology experts

Quote
"The PSLV rocket has been successful for the past several years. So the question of design failure does not arise. It could be an issue of a failed component or a process quality issue," M.Y.S. Prasad, a former Director of the Satish Dhawan Space Centre, told IANS.

Quote
This is the first time that a satellite launch mission has failed due to this reason, perplexing current and former officials of the Indian Space Research Organization (ISRO). "It is really perplexing that such a thing has happened. Normally, the PSLV rocket has several redundancies built into it," R.V. Perumal, a former ISRO scientist, told IANS.

Quote
Noting all the commands are pre-planned and built into the computers, he said that there cannot be any manual command. "The computers have to give the necessary commands. The commands have to be relayed by the electrical circuits. The pyro circuit has to get initiated which, in turn, has to cut the mechanical elements so that the two parts of the heat shield get separated," he said.

Quote
Prasad maintained that something could have gone wrong in this four-step sequence or in the sub-systems, as redundancies have only been built into some systems. "The computer programmes may have several redundancies to take care of an eventuality. So they can be tested on ground before and also during preparation for the flight. The electrical circuits and some pyro elements will also have redundancies.

Quote
"A rocket has several one-time operation systems. Such systems cannot be pre-tested and cannot have redundancies[/b]. Only sample tests can be made with items manufactured in that batch. And then a system is used in the rocket," he said, terming the one-time operation systems 'the riskiest items; in any rocket.

Ruling out design failure, Prasad said the most probable cause of failure could be the quality of a rocket component or some error in the assembly of systems.

worldtimedate [ http://www.world-timedate.com/ ]

Offline K210

  • Full Member
  • *
  • Posts: 121
  • Liked: 23
  • Likes Given: 0
Reason for failure has been found. Report will be released shortly. Launches to resume from november.

http://economictimes.indiatimes.com/news/science/india-to-resume-satellite-launches-by-december/articleshow/60702472.cms

Offline Star One

  • Senior Member
  • *****
  • Posts: 7776
  • UK
  • Liked: 1237
  • Likes Given: 168
ISRO to be back with launches in Nov.-Dec.

Quote
The Indian Space Research Organisation expects to resume launch of satellites in a couple of months once its failure analysis committee releases its report. The committee is conducting tests on why the PSLV-C39 mission of August 31 failed to release a back-up navigation satellite into space.

ISRO Chairman A.S. Kiran Kumar on Friday said the committee would release its report "very soon". The launches would be resumed in November or December after necessary steps are taken. He was speaking on the sidelines of an event to mark 25 years of the formation of Antrix Corporation, which markets ISRO’s products and services.

http://www.thehindu.com/todays-paper/tp-national/isro-to-be-back-with-launches-in-nov-dec/article19695173.ece

Offline worldtimedate

  • Full Member
  • *
  • Posts: 116
  • Liked: 5
  • Likes Given: 0
Pyro devices to blame for PSLV failure: ISRO

The Indian Space Research Organisation (ISRO) has come round to the inference that the PSLV C-39 mission on August 31 was doomed by the failure of the pyro devices that actuate the separation of the heat shield encasing the satellite from the rocket.

A high-level meeting chaired by ISRO chairman A.S.Kiran Kumar held at the VSSC here on Friday came to the conclusion on the failure of the pyro devices. The meeting was informed that simulation exercises were on to ascertain the reason for the malfunctioning of the pyro devices.

"We have isolated the component responsible for the failure of the mission but it remains to be established why it failed to function," VSSC Director Dr. K.Sivan said. "We are testing various versions and hope to arrive at a consensus in seven to 10 days". The exercises are expected to help the scientists analyse the failure from various angles.

The failure review committee set up by ISRO had zeroed in on the electrically-operated pyro devices as the culprit after it was found that the command for separation had gone through but failed to trigger the mechanical process that pops open the heat shield.

worldtimedate [ http://www.world-timedate.com/ ]

Tags: