PMA3 is soon to be re-located from Unity Nadir to Unity Port (according to the ISS schedule of events thread), so is there to be another swap before Node 3 flies?
And the final location of Cupola is the Port CBM of Node 3 (Tranquality) with the viev squarely on Kibo, yes?
Quote from: glanmor05 on 04/15/2009 10:09 pmPMA3 is soon to be re-located from Unity Nadir to Unity Port (according to the ISS schedule of events thread), so is there to be another swap before Node 3 flies?Yes.
Quote from: Jorge on 04/15/2009 10:14 pmQuote from: glanmor05 on 04/15/2009 10:09 pmPMA3 is soon to be re-located from Unity Nadir to Unity Port (according to the ISS schedule of events thread), so is there to be another swap before Node 3 flies?Yes.So let me get this straight. PMA 3 will be re-located early July to the Port CBM of Unity, not be used (according to ISS Scedule of Events thread), then be re-re-located back to Nadir before the middle of December when Node 3 will be attached to the Port CBM?That sounds like nonsense to me.
The Node 3 was originall scheduled for the nadir. Node 1 was plumbed for that position. Node 1 now has to be replumbed with all the power, data, air flow etc to go to the port. To do that we need a pressurized module on the other side of the bulkhead to do the work. PMA3 will be relocated to provide that volume. When done, it will then be relocated back to the nadir.
Quote from: glanmor05 on 04/15/2009 10:38 pmQuote from: Jorge on 04/15/2009 10:14 pmQuote from: glanmor05 on 04/15/2009 10:09 pmPMA3 is soon to be re-located from Unity Nadir to Unity Port (according to the ISS schedule of events thread), so is there to be another swap before Node 3 flies?Yes.So let me get this straight. PMA 3 will be re-located early July to the Port CBM of Unity, not be used (according to ISS Scedule of Events thread), then be re-re-located back to Nadir before the middle of December when Node 3 will be attached to the Port CBM?That sounds like nonsense to me.Yes it would if you would make a quick snap judgement without checking for data or reading the other threads on this topic.The Node 3 was originall scheduled for the nadir. Node 1 was plumbed for that position. Node 1 now has to be replumbed with all the power, data, air flow etc to go to the port. To do that we need a pressurized module on the other side of the bulkhead to do the work. PMA3 will be relocated to provide that volume. This way, on 20A Node 3 When done, it will then be relocated back to the nadir. Do we have your approval now?
That all makes sense. Always had my approval, just didn't understand (which in itself isn't unusual). Always best to ask?
Quote from: glanmor05 on 04/16/2009 07:56 amThat all makes sense. Always had my approval, just didn't understand (which in itself isn't unusual). Always best to ask? Sure, but just ask. Calling it nonsense isn't asking.
Why is the change not reflected in the images online?