Author Topic: US EVA 46 - October 20, 2017  (Read 1122 times)

Offline jacqmans

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 16608
  • Houten, The Netherlands
  • Liked: 2332
  • Likes Given: 149
US EVA 46 - October 20, 2017
« on: 09/28/2017 06:03 PM »
NASA TV coverage of the spacewalk will begin at 6:30 a.m. on Oct. 18. Each spacewalk is scheduled to start at approximately 8:05 a.m., however, the spacewalks may begin earlier if the crew is running ahead of schedule.       

Expedition 53 Commander Randy Bresnik of NASA will lead all three spacewalks, Flight Engineer Joe Acaba of NASA will join Bresnik on Oct. 18 for the third spacewalk.

The third spacewalks will be devoted to lubricating the newly installed end effector and replacing cameras on the left side of the station’s truss and the right side of the station’s U.S. Destiny laboratory.
« Last Edit: 10/14/2017 09:16 AM by Galactic Penguin SST »

Offline centaurinasa

  • Full Member
  • ****
  • Posts: 1910
  • PARIS
  • Liked: 431
  • Likes Given: 492
Re: US EVA 46 - October 18, 2017
« Reply #1 on: 10/02/2017 06:54 PM »
EV & Intravehicular crews

Offline centaurinasa

  • Full Member
  • ****
  • Posts: 1910
  • PARIS
  • Liked: 431
  • Likes Given: 492
Re: US EVA 46 - October 18, 2017
« Reply #2 on: 10/12/2017 12:31 PM »
Joe Acaba resize EMUs before EVA, next Wednesday.
« Last Edit: 10/12/2017 12:46 PM by centaurinasa »

Offline centaurinasa

  • Full Member
  • ****
  • Posts: 1910
  • PARIS
  • Liked: 431
  • Likes Given: 492
Re: US EVA 46 - October 18, 2017
« Reply #3 on: 10/12/2017 12:31 PM »
Tomorrow: EVA Procedure Review and Conference

Offline centaurinasa

  • Full Member
  • ****
  • Posts: 1910
  • PARIS
  • Liked: 431
  • Likes Given: 492
Re: US EVA 46 - October 18, 2017
« Reply #4 on: 10/12/2017 12:45 PM »

Offline centaurinasa

  • Full Member
  • ****
  • Posts: 1910
  • PARIS
  • Liked: 431
  • Likes Given: 492
Re: US EVA 46 - October 18, 2017
« Reply #5 on: 10/12/2017 12:45 PM »
Job done !

Offline centaurinasa

  • Full Member
  • ****
  • Posts: 1910
  • PARIS
  • Liked: 431
  • Likes Given: 492
Re: US EVA 46 - October 18, 2017
« Reply #6 on: 10/12/2017 12:49 PM »
Joe report to MCC-H, EMU's Battery charge level.
« Last Edit: 10/12/2017 12:50 PM by centaurinasa »

Offline centaurinasa

  • Full Member
  • ****
  • Posts: 1910
  • PARIS
  • Liked: 431
  • Likes Given: 492
Re: US EVA 46 - October 18, 2017
« Reply #7 on: 10/12/2017 02:28 PM »
Joe and Randy, back to the airlock

Offline centaurinasa

  • Full Member
  • ****
  • Posts: 1910
  • PARIS
  • Liked: 431
  • Likes Given: 492
Re: US EVA 46 - October 18, 2017
« Reply #8 on: 10/12/2017 03:01 PM »
« Last Edit: 10/12/2017 03:35 PM by centaurinasa »

Offline centaurinasa

  • Full Member
  • ****
  • Posts: 1910
  • PARIS
  • Liked: 431
  • Likes Given: 492
Re: US EVA 46 - October 18, 2017
« Reply #9 on: 10/12/2017 03:59 PM »
Some adjustments...

Offline centaurinasa

  • Full Member
  • ****
  • Posts: 1910
  • PARIS
  • Liked: 431
  • Likes Given: 492
Re: US EVA 46 - October 18, 2017
« Reply #10 on: 10/12/2017 04:31 PM »

Offline centaurinasa

  • Full Member
  • ****
  • Posts: 1910
  • PARIS
  • Liked: 431
  • Likes Given: 492
Re: US EVA 46 - October 18, 2017
« Reply #11 on: 10/14/2017 08:31 AM »
EVA now scheduled Friday 20th...
« Last Edit: 10/14/2017 08:32 AM by centaurinasa »

Offline jacqmans

  • Moderator
  • Global Moderator
  • Senior Member
  • *****
  • Posts: 16608
  • Houten, The Netherlands
  • Liked: 2332
  • Likes Given: 149
Re: US EVA 46 - October 20, 2017
« Reply #12 on: 10/17/2017 01:59 PM »
ISS Daily Summary Report – 10/16/2017


USOS Extra-Vehicular Activity (EVA) #46 Preparations:  Today the crew configured tools, reviewed EVA procedures, and conducted a conference with ground specialists in preparation for next week’s EVA. The goals of USOS EVA #46 include Removal and Replacement (R&R) of the degraded CP13 camera and R&R of the Latching End Effector (LEE) A Camera Lens Assembly (CLA).